Javascript must be enabled to continue!
PLC Based Load Sharing of Transformers
View through CrossRef
The transformer is very expensive and bulky power system equipment. It runs and feed the load for 24 hours a day. Sometimes the load on the transformer unexpectedly rises above its rated capacity in that situation the load on the transformer increases and it will be overloaded and current will increase and cause overheating which in results damage the insulation of transformer. That insulation failure resulting in interruption of power supply. The common problems which transformer face is overloading voltage fluctuations and heating effect. It takes lot of time to fix the transformer so that a device need to be introduced a device which would help in automatically sharing of these over voltages. We will try to build an automated transformer sharing system in this project where the transformer current is confined to auxiliary transformer and automatically enters system.
There are three transformers working as sources in this project, initially when the main switched ON the load that time load will be shared through the first transformer but when the load on first transformer suddenly increase above its reference value then immediately second transformer connected parallel with first transformer automatically through PLC by busing relay circuit.
Title: PLC Based Load Sharing of Transformers
Description:
The transformer is very expensive and bulky power system equipment.
It runs and feed the load for 24 hours a day.
Sometimes the load on the transformer unexpectedly rises above its rated capacity in that situation the load on the transformer increases and it will be overloaded and current will increase and cause overheating which in results damage the insulation of transformer.
That insulation failure resulting in interruption of power supply.
The common problems which transformer face is overloading voltage fluctuations and heating effect.
It takes lot of time to fix the transformer so that a device need to be introduced a device which would help in automatically sharing of these over voltages.
We will try to build an automated transformer sharing system in this project where the transformer current is confined to auxiliary transformer and automatically enters system.
There are three transformers working as sources in this project, initially when the main switched ON the load that time load will be shared through the first transformer but when the load on first transformer suddenly increase above its reference value then immediately second transformer connected parallel with first transformer automatically through PLC by busing relay circuit.
Related Results
On the Remote Calibration of Instrumentation Transformers: Influence of Temperature
On the Remote Calibration of Instrumentation Transformers: Influence of Temperature
The remote calibration of instrumentation transformers is theoretically possible using synchronous measurements across a transmission line with a known impedance and a local set of...
Crane Load Moment System For Offshore Crane Operations
Crane Load Moment System For Offshore Crane Operations
Abstract
History has shown that dependency upon the crane operator to monitor loads and boom angle or load radius do not allow the margin necessary to perform the...
The Application of PLC Distributed Input/Output Technology Offshore
The Application of PLC Distributed Input/Output Technology Offshore
ABSTRACT
The Programmable Logic Controller is becoming a familiar part of the Process Controls on Offshore Facilities. The current evolution of this expanding tec...
The significance and factors leading to heteroploidy in pleural lavage cytology
The significance and factors leading to heteroploidy in pleural lavage cytology
Introduction: Positive intraoperative pleural lavage cytology (pre-resection PLC) is considered a prognostic risk factor of primary lung cancer surgery. Positive findings suggest s...
Optimal operation of paralleled power transformers
Optimal operation of paralleled power transformers
Parallel operation of power transformers is a common practice. Interest is placed on minimizing the reactive current circulation between transformers due to mismatching of electric...
The impact of employees’ relationships on tacit knowledge sharing
The impact of employees’ relationships on tacit knowledge sharing
Purpose– This paper aims to study the impact of individual relationships on tacit knowledge sharing in the company setting of compulsory bond, expressive bond, instrumental bond an...
A prospective follow-up study of the relationship between high-sensitivity C-reactive protein and primary liver cancer
A prospective follow-up study of the relationship between high-sensitivity C-reactive protein and primary liver cancer
Abstract
Background
Competing risk method has not been used in a large-scale prospective study to investigate whether increased levels of high-sensitivity C-reactive protein (hs-CR...
Automatic Load Sharing of Transformer
Automatic Load Sharing of Transformer
Transformer plays a major role in the power system. It works 24 hours a day and provides power to the load. The transformer is excessive full, its windings are overheated which lea...


