Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Effective HSE-MS Implementation: A Success Story of Ikike Project 6 Million + Manhours with NO LTI

View through CrossRef
Abstract Ikike is an undeveloped field located 20km offshore and approximately 15km north of the Amenam complex in 20m water depth. The Amenam field which has been producing since July 2003 is located approximately 60km southeast of the NLNG Plant and 95km Southeast of Port Harcourt and the water depth range from 30 to 40 meters. The Ikike project leverages on the existing Amenam facilities to keep costs low and is designed to minimize greenhouse gas emissions. Estimated at less than 4kg CO2e/boe, they will contribute to reducing the average carbon intensity of TotalEnergies’ upstream portfolio. Given to the inherent hazard and risk associated with Oil & Gas projects from Conceptual phase to Front End Engineering Design studies, to fabrication and constructions as well as installation and commissioning, HSE management system becomes pivotal to driving an incident free project phases. This Paper focuses on the sound application of the Project HSE Management strategy, plan and system which comprises a set of components that includes; Project HSE Policy and HSE objectives,Identification of the risk involved in the Project activities,An organization within which the HSE responsibilities are clearly defined,Competent and trained personnel,Internal and external communication.Practises and processes formally defined in the project documentation,Evaluation and reviews of Project HSE performances,Correctives action plans and periodic management reviews,An HSE audit program All of these were deployed during the Ikike project towards demonstrating and providing a means of anticipating and controlling the risks involved in the Project which had continuously improved the HSE performances all through the project in conformance with project improvement goals set for the Project. Several other proactive and reactive measures were taken towards ensuring a success story of Ikike Project with a total of 6milliom man hours of No Lost Time Incident.
Title: Effective HSE-MS Implementation: A Success Story of Ikike Project 6 Million + Manhours with NO LTI
Description:
Abstract Ikike is an undeveloped field located 20km offshore and approximately 15km north of the Amenam complex in 20m water depth.
The Amenam field which has been producing since July 2003 is located approximately 60km southeast of the NLNG Plant and 95km Southeast of Port Harcourt and the water depth range from 30 to 40 meters.
The Ikike project leverages on the existing Amenam facilities to keep costs low and is designed to minimize greenhouse gas emissions.
Estimated at less than 4kg CO2e/boe, they will contribute to reducing the average carbon intensity of TotalEnergies’ upstream portfolio.
Given to the inherent hazard and risk associated with Oil & Gas projects from Conceptual phase to Front End Engineering Design studies, to fabrication and constructions as well as installation and commissioning, HSE management system becomes pivotal to driving an incident free project phases.
This Paper focuses on the sound application of the Project HSE Management strategy, plan and system which comprises a set of components that includes; Project HSE Policy and HSE objectives,Identification of the risk involved in the Project activities,An organization within which the HSE responsibilities are clearly defined,Competent and trained personnel,Internal and external communication.
Practises and processes formally defined in the project documentation,Evaluation and reviews of Project HSE performances,Correctives action plans and periodic management reviews,An HSE audit program All of these were deployed during the Ikike project towards demonstrating and providing a means of anticipating and controlling the risks involved in the Project which had continuously improved the HSE performances all through the project in conformance with project improvement goals set for the Project.
Several other proactive and reactive measures were taken towards ensuring a success story of Ikike Project with a total of 6milliom man hours of No Lost Time Incident.

Related Results

Quantifying HSE Culture – A Leading Indicator of HSE Performance: An Energy Industry Case Study
Quantifying HSE Culture – A Leading Indicator of HSE Performance: An Energy Industry Case Study
Abstract This paper presents the results of an HSE Culture survey administered to employees and managers at an energy company. HSE culture can be defined as the valu...
Improving HSE Performance by Management of Human Factors
Improving HSE Performance by Management of Human Factors
Abstract Management of human factors is recognized as an essential role in the control of risk. Human factors cover a wide range of issues, which include the percept...
HSE Leadership Toolkit: a Valuable Approach to Improve Performances and Reduce Incidents
HSE Leadership Toolkit: a Valuable Approach to Improve Performances and Reduce Incidents
Abstract This paper presents the toolkit developed by Eni E&P to strengthen the manager’s HSE leadership and commitment. The first tool is a self ...
Automatic control for unmanned ground vehicles
Automatic control for unmanned ground vehicles
(English) This thesis explores advanced control strategies for trajectory tracking, state feedback, disturbance mitigation, and autonomous vehicle guidance across a range of dynami...
HSE Management for China Offshore Drilling Project
HSE Management for China Offshore Drilling Project
Abstract According to the International Drilling HSE (Health, Safety, and Environment) management standards and advanced management experience as well as hazard m...
Standardising HSE Training Through Delphi
Standardising HSE Training Through Delphi
Abstract Training is a vital instrument for developing proactive and responsible HSE behaviours. This is why Saipem decided to adopt a method for standardising HSE c...
Long-term outcome of severe herpes simplex encephalitis: a population-based observational study
Long-term outcome of severe herpes simplex encephalitis: a population-based observational study
Abstract Introduction Herpes simplex encephalitis (HSE) is a rare disease with a poor prognosis. No recent evaluation of hospital incidence, acute m...
Kuwait Oil Company Conceptualized & Implemented HSE Traffic Lights for HSE Demonstration & Site Verification
Kuwait Oil Company Conceptualized & Implemented HSE Traffic Lights for HSE Demonstration & Site Verification
Abstract: The increase in business activities during last decade brought forward several challenges in upstream hydrocarbon industry like KOC which has 40 operationa...

Back to Top