Analisis Pengaruh Kapasitor Bank Terhadap Besaran Listrik di Gedung World Trade Centre Jakarta
View through CrossRef
High-rise buildings such as the World Trade Center Jakarta generally have high inductive electrical loads, so that their reactive power consumption is large and the power factor decreases below the SPLN standard (≤0.85), resulting in increased power losses and operational costs. This study aims to measure the power factor value before and after repairing the detuned reactor and capacitor on the capacitor bank panel, compare the results of field measurements with ETAP simulations, and assess the feasibility of the installed capacitor bank and determine the difference in the results of the ETAP simulation between measurements and load calculations on the World Trade Center building. The methods used include literature review, field observations on the LVMDP panel, MCC and capacitor bank, discussions with supervisors, data collection of current, voltage, kW, kVAR, kVA and cos φ using Lovato DCRG8 and ampere clamp, and load simulation using ETAP software. The results show that the cosφ value increased from 0.70 to 0.95 (an increase of 35.71%), the compensated reactive power reached 204 kVAR (Lovato), 282.6 kVAR (tang ampere), and 415 kVAR (ETAP simulation), with a power factor or cosφ = 0.95. In conclusion, the replacement of detuned reactors and capacitors effectively improves the power factor in the WTC Jakarta Building, reduces reactive loads, and the ETAP simulation results are consistent with field measurements, so that the capacitor bank installed in the WTC building is declared effective in reducing reactive currents, thereby reducing kVAR, kVA loads and improving the efficiency of the electrical system distribution for better energy management
Politeknik Pratama Purwokerto
Title: Analisis Pengaruh Kapasitor Bank Terhadap Besaran Listrik di Gedung World Trade Centre Jakarta
Description:
High-rise buildings such as the World Trade Center Jakarta generally have high inductive electrical loads, so that their reactive power consumption is large and the power factor decreases below the SPLN standard (≤0.
85), resulting in increased power losses and operational costs.
This study aims to measure the power factor value before and after repairing the detuned reactor and capacitor on the capacitor bank panel, compare the results of field measurements with ETAP simulations, and assess the feasibility of the installed capacitor bank and determine the difference in the results of the ETAP simulation between measurements and load calculations on the World Trade Center building.
The methods used include literature review, field observations on the LVMDP panel, MCC and capacitor bank, discussions with supervisors, data collection of current, voltage, kW, kVAR, kVA and cos φ using Lovato DCRG8 and ampere clamp, and load simulation using ETAP software.
The results show that the cosφ value increased from 0.
70 to 0.
95 (an increase of 35.
71%), the compensated reactive power reached 204 kVAR (Lovato), 282.
6 kVAR (tang ampere), and 415 kVAR (ETAP simulation), with a power factor or cosφ = 0.
95.
In conclusion, the replacement of detuned reactors and capacitors effectively improves the power factor in the WTC Jakarta Building, reduces reactive loads, and the ETAP simulation results are consistent with field measurements, so that the capacitor bank installed in the WTC building is declared effective in reducing reactive currents, thereby reducing kVAR, kVA loads and improving the efficiency of the electrical system distribution for better energy management.
Related Results
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
This study examines the role of corporate governance in moderating the influence of green accounting disclosure, corporate social responsibility (CSR), and firm size on the financi...
PERBANDINGAN KELAYAKAN FINANSIAL GEDUNG GREEN BUILDING DAN NON- GREEN BUILDING MENGGUNAKAN METODE MONTE CARLO
PERBANDINGAN KELAYAKAN FINANSIAL GEDUNG GREEN BUILDING DAN NON- GREEN BUILDING MENGGUNAKAN METODE MONTE CARLO
Since 2011, Indonesia has been committed to reducing greenhouse gas emissions, one of which is by implementing green buildings in office buildings. The aim of implementing green bu...
Hubungan Kualitas Audit, Komite Audit, dan Dewan Pengawas Syariah terhadap Kinerja Bank Umum Syariah di Indonesia
Hubungan Kualitas Audit, Komite Audit, dan Dewan Pengawas Syariah terhadap Kinerja Bank Umum Syariah di Indonesia
ABSTRAK
Penelitian ini ditujukan untuk mengetahui hubungan kualitas audit, komite audit, dan Dewan Pengawas Syariah (DPS) terhadap kinerja Bank Umum Syariah di Indonesia pada tahun...
Pengaruh Perubahan Kapasitor Terhadap Kinerja Buck-Boost Converter
Pengaruh Perubahan Kapasitor Terhadap Kinerja Buck-Boost Converter
Buck-boost converter merupakan sebuah konverter DC-DC yang dapat menghasilkan besaran tegangan output DC yang lebih besar atau lebih kecil dari tegangan inputnya. Proses ini tentun...
IDENTIFIKASI DAN KLASIFIKASI ASET INFRASTRUKTUR BANGUNAN GEDUNG DI UNIVERSITAS PALANGKA RAYA
IDENTIFIKASI DAN KLASIFIKASI ASET INFRASTRUKTUR BANGUNAN GEDUNG DI UNIVERSITAS PALANGKA RAYA
Aset infrastruktur bangunan gedung di lingkungan kampus berperan penting sebagai sarana penunjang kegiatan akademik maupun non akademik. Universitas Palangka Raya sebagai penyeleng...
IMPLEMENTASI WEB-SCADA UNTUK ME-MONITOR BESARAN LISTRIK DI GEDUNG ELEKTRO KAMPUS 1 POLITEKNIK NEGERI UJUNG PANDANG
IMPLEMENTASI WEB-SCADA UNTUK ME-MONITOR BESARAN LISTRIK DI GEDUNG ELEKTRO KAMPUS 1 POLITEKNIK NEGERI UJUNG PANDANG
Tujuan tugas akhir ini adalah memodifikasi suatu peralatan yang sudah terpasang dengan menambahkan penyimpanan data hasil pengukuran besaran listrik secara real time yang dapat dia...
Implementasi Web-Scada Untuk Me-Monitor Besaran Listrik Di Gedung Elektro Kampus 1 Politeknik Negeri Ujung Pandang
Implementasi Web-Scada Untuk Me-Monitor Besaran Listrik Di Gedung Elektro Kampus 1 Politeknik Negeri Ujung Pandang
Tujuan tugas akhir ini adalah memodifikasi suatu peralatan yang sudah terpasang dengan menambahkan penyimpanan data hasil pengukuran besaran listrik secara real time yang dapat dia...
PERANCANGAN PANEL KAPASITOR BANK 1200KVARDI PT. TIGA KREASI INDONESIA
PERANCANGAN PANEL KAPASITOR BANK 1200KVARDI PT. TIGA KREASI INDONESIA
Listrik merupakan kebutuhan yang sangat penting bagi kehidupan manusia, salah satu hal yang berkaitan dengan listrik ialah panel listrik yang berfungsi sebagai penyalur energi list...