Causes of Cost Overruns due to Outsourced Labour – Subcontractor’s Perspectives

View through CrossRef
Project cost overrun is a significant concern in construction. Statistics reveal that more than 80% of construction projects have not been completed on agreed time or budget due to numerous factors. In the context of the UK construction industry, the subcontractor led approaches are highly encouraged to absorb their expertise and knowledge into the field, which will help projects to complete on time, cost and quality. However, most of the subcontractors are highly reliant on outsourced/external labour. Literature acknowledges the conflicts between main and sub-contractor as one of significant causes for cost overruns and further explains these are mainly due to the issues of sub contractor’s labour. However there is limited research on the impacts of outsourced labour in subcontractor’s cost overruns. Therefore, this research aims to bridge this gap by identifying the causes of cost overruns due to external labour. Apart from the literature review, the data was collected from a case study of a drywall subcontractor. As part of the case study, six construction professionals of the selected subcontractor were interviewed and thematic analysis was adopted to analyse the data. The results revealed; high wastage, poor workmanship and frequent rework, low productivity, issues with buildability and dayworks as the main causes for cost overruns due to outsourced labour. Moreover, subcontractors are averse to enforce strong performance measures on the outsourced labour due to the fear of low retention.
Title: Causes of Cost Overruns due to Outsourced Labour – Subcontractor’s Perspectives
Description:
Project cost overrun is a significant concern in construction.
Statistics reveal that more than 80% of construction projects have not been completed on agreed time or budget due to numerous factors.
In the context of the UK construction industry, the subcontractor led approaches are highly encouraged to absorb their expertise and knowledge into the field, which will help projects to complete on time, cost and quality.
However, most of the subcontractors are highly reliant on outsourced/external labour.
Literature acknowledges the conflicts between main and sub-contractor as one of significant causes for cost overruns and further explains these are mainly due to the issues of sub contractor’s labour.
However there is limited research on the impacts of outsourced labour in subcontractor’s cost overruns.
Therefore, this research aims to bridge this gap by identifying the causes of cost overruns due to external labour.
Apart from the literature review, the data was collected from a case study of a drywall subcontractor.
As part of the case study, six construction professionals of the selected subcontractor were interviewed and thematic analysis was adopted to analyse the data.
The results revealed; high wastage, poor workmanship and frequent rework, low productivity, issues with buildability and dayworks as the main causes for cost overruns due to outsourced labour.
Moreover, subcontractors are averse to enforce strong performance measures on the outsourced labour due to the fear of low retention.

Related Results

A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have b...
Beyond the causes
Beyond the causes
Purpose This paper aims to contend that the circle of investigation into overruns cannot be complete unless the established critical failure factors are matched against their respe...
ISSUES OF PROVIDING GUARANTEES AND SOCIAL PROTECTION FOR EAEU LABOUR MIGRANTS
ISSUES OF PROVIDING GUARANTEES AND SOCIAL PROTECTION FOR EAEU LABOUR MIGRANTS
Background: Today, the Eurasian Economic Union (hereinafter the EAEU) has formed its own labour market; however, in the current international environment, issues related to ensurin...
The bargaining position of outsourced labours in the ASEAN Economic Community (AEC) era
The bargaining position of outsourced labours in the ASEAN Economic Community (AEC) era
This study was motivated by the increasing number of foreign manpower entering and working in Indonesia since the implementation of the ASEAN Economic Community (AEC) by the end of...
An Examination on Project Cost Overruns in Project Management: A Study of S3 Project at Kanshanshi Mine
An Examination on Project Cost Overruns in Project Management: A Study of S3 Project at Kanshanshi Mine
This study examines project cost overruns in project management with a focus on S3 Project at Kanshanshi Mine. The main objectives were to identify types of cost overruns, assess t...
LABOUR MARKET DYNAMICS IN UKRAINE DURING WAR: ANALYSIS OF MIGRATION TRENDS AND UNEMPLOYMENT INDICATORS
LABOUR MARKET DYNAMICS IN UKRAINE DURING WAR: ANALYSIS OF MIGRATION TRENDS AND UNEMPLOYMENT INDICATORS
Purpose. The aim of this study is to determine the influence of the wartime period on Ukraine's labour market, analyse key transformations and imbalances resulting from changes in ...
Changing Scenario of Indian Labour and New Labour Codes: A Critical Analysis
Changing Scenario of Indian Labour and New Labour Codes: A Critical Analysis
The penetrating debate on Indian labour laws obstructing the flexibility of the labour market has taken centre stage in the last two decades, post the period of liberalisation of t...

Back to Top