Javascript must be enabled to continue!
The Development of Ungauged-Catchment Integrated-Similarity Unit Hydrograph to Estimate Inflow of Wonogiri Reservoir
View through CrossRef
The Wonogiri Reservoir is a multipurpose reservoir at the Upper Bengawan Solo Watershed, primarily designed to serve as a flood control system. However, there is no accurate estimation of the inflow into the reservoir due to the limited availability of hydrological stations. Observations showed only four out of ten unit hydrographs of the Wonogiri Reservoir watershed. Therefore, this study was conducted to apply an integrated similarity-based approach for designing unit hydrographs in ungauged catchments. The process involved evaluating the integrated similarity between pairs of gauged-ungauged catchments using hydrologic and physical property parameters. This led to the selection of the donor or gauged catchment with the highest similarity score to develop the unit hydrograph for the ungauged catchments. The developed UHs were further applied to estimate the reservoir inflow for the December 25, 2007, flood event. The results showed that the computed peak discharge was 10.9% lower than a previous study. Subsequently, the HEC-HMS simulation model was used to project the updated design flood hydrographs to the reservoir. The design rainfall was derived from automatic rainfall recorder (ARR) and PERSIANN satellite-based data. The ARR data showed that the extreme rainfall duration was 5 hours while satellite data indicated 6 hours. The application of the ARR 5-hour duration to the updated flood hydrographs led to a peak discharge of 5123 m3 s-1, 7041 m3 s-1, and 10,370 m3 s-1 for the 60-year, 500-year, and PMF floods respectively in line with the flood design criteria of Wonogiri Reservoir. These estimates were observed to be significantly higher than the 1982 design floods which were 4000 m3 s-1, 5100 m3 s-1, and 9600 m3 s-1 respectively. This updated flood control design was important to renew the operation rule of the Wonogiri reservoir during flood periods.
Universitas Gadjah Mada
Title: The Development of Ungauged-Catchment Integrated-Similarity Unit Hydrograph to Estimate Inflow of Wonogiri Reservoir
Description:
The Wonogiri Reservoir is a multipurpose reservoir at the Upper Bengawan Solo Watershed, primarily designed to serve as a flood control system.
However, there is no accurate estimation of the inflow into the reservoir due to the limited availability of hydrological stations.
Observations showed only four out of ten unit hydrographs of the Wonogiri Reservoir watershed.
Therefore, this study was conducted to apply an integrated similarity-based approach for designing unit hydrographs in ungauged catchments.
The process involved evaluating the integrated similarity between pairs of gauged-ungauged catchments using hydrologic and physical property parameters.
This led to the selection of the donor or gauged catchment with the highest similarity score to develop the unit hydrograph for the ungauged catchments.
The developed UHs were further applied to estimate the reservoir inflow for the December 25, 2007, flood event.
The results showed that the computed peak discharge was 10.
9% lower than a previous study.
Subsequently, the HEC-HMS simulation model was used to project the updated design flood hydrographs to the reservoir.
The design rainfall was derived from automatic rainfall recorder (ARR) and PERSIANN satellite-based data.
The ARR data showed that the extreme rainfall duration was 5 hours while satellite data indicated 6 hours.
The application of the ARR 5-hour duration to the updated flood hydrographs led to a peak discharge of 5123 m3 s-1, 7041 m3 s-1, and 10,370 m3 s-1 for the 60-year, 500-year, and PMF floods respectively in line with the flood design criteria of Wonogiri Reservoir.
These estimates were observed to be significantly higher than the 1982 design floods which were 4000 m3 s-1, 5100 m3 s-1, and 9600 m3 s-1 respectively.
This updated flood control design was important to renew the operation rule of the Wonogiri reservoir during flood periods.
.
Related Results
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
<p>Flood hazard maps are essential for development and assessment of flood risk management strategies. Conventionally, flood hazard assessment is based on determinist...
Peran Kader Kesehatan dalam Pencegahan Kejadian Tuberkulosis di Wonogiri
Peran Kader Kesehatan dalam Pencegahan Kejadian Tuberkulosis di Wonogiri
Tuberculosis is a disease of global concern, where recently there has been an increase in new numbers and an increase in the number of deaths caused by this disease. CNR (Case Noti...
Constraining simulation uncertainties in a hydrological model of the Congo River Basin including a combined modelling approach for channel-wetland exchanges
Constraining simulation uncertainties in a hydrological model of the Congo River Basin including a combined modelling approach for channel-wetland exchanges
Compared to other large river basins of the world, such as the Amazon, the Congo River Basin appears to be the most ungauged and less studied. This is partly because the basin lack...
Towards identification of dominant hydrological mechanisms in ungauged catchments
Towards identification of dominant hydrological mechanisms in ungauged catchments
Modelling hydrological processes in ungauged catchments is a major challenge in environmental sciences and engineering. An ungauged catchment is a catchment that lacks streamflow d...
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Abstract
Reservoir fluid estimation for exploration prospects can be random and of large uncertainties. Typically, the reservoir fluid estimation in a prospect can b...
A new method to identify time to peak in Unit Hydrographs
A new method to identify time to peak in Unit Hydrographs
Catchment response time is an important parameter in hydrological models, particularly in peak flow prediction in catchment scale. Unit hydrographs are hydrological tools that repr...
How Malfunctioning Completion Accessories Affect Well Performance Offshore Saudi Arabia
How Malfunctioning Completion Accessories Affect Well Performance Offshore Saudi Arabia
Abstract
To overcome horizontal well reservoir and production challenges, inflow control devices are adopted as the optimal completion method in many parts of the...
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
This reference is for an abstract only. A full paper was not submitted for this conference.
Abstract
1 Int...

