Analisis HOR dalam Identifikasi Faktor-Faktor Penyebab Keterlambatan Waktu Kontruksi PT. SERTIMA pada Proyek Drainase

View through CrossRef
The study aims to identify factors affecting the success of construction projects and develop effective mitigation strategies using the House of Risk (HOR) approach. The qualitative method used in the study is observation, observation, analysis, and discussion of team members. The Risk Assessment (Agen Risiko) is identified and directed on HOR-1, based on Aggregate Risk Potential (ARP), and HOR-2, focuses on the implementation of mitigation measures. The study demonstrates the effectiveness of the HOR approach in mitigating and reducing risks in construction projects, providing practical guidance to increase risk management and evaluating the effectiveness of mitigation strategies.
Title: Analisis HOR dalam Identifikasi Faktor-Faktor Penyebab Keterlambatan Waktu Kontruksi PT. SERTIMA pada Proyek Drainase
Description:
The study aims to identify factors affecting the success of construction projects and develop effective mitigation strategies using the House of Risk (HOR) approach.
The qualitative method used in the study is observation, observation, analysis, and discussion of team members.
The Risk Assessment (Agen Risiko) is identified and directed on HOR-1, based on Aggregate Risk Potential (ARP), and HOR-2, focuses on the implementation of mitigation measures.
The study demonstrates the effectiveness of the HOR approach in mitigating and reducing risks in construction projects, providing practical guidance to increase risk management and evaluating the effectiveness of mitigation strategies.

Related Results

MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
KECEMASAN SAAT PANDEMI COVID 19: LITERATUR REVIEW Hardiyati, Efri Widianti, Taty Hernawaty Departemen Keperawatan Jiwa Poltekkes Kemenkes Mamuju Sulbar, Universitas Pad...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
Analisa Perbandingan Biaya Dan Waktu Pelaksanaan Drainase Beton Pracetak U-DITCH Dengan Pasangan Batu Kali
Analisa Perbandingan Biaya Dan Waktu Pelaksanaan Drainase Beton Pracetak U-DITCH Dengan Pasangan Batu Kali
Sistem drainase adalah rangkaian kegiatan yang membentuk upaya pengaliran air, baik air permukaan, maupun air tanah dari suatu daerah atau kawasan. Material yang paling sering diju...
Analisis Faktor Keterlambatan Proyek Pembangunan Pusat Informasi Dengan Metode Regresi Linier Sederhana
Analisis Faktor Keterlambatan Proyek Pembangunan Pusat Informasi Dengan Metode Regresi Linier Sederhana
Pembangunan Pusat Informasi dan Infrastruktur Ekowisata Tenaga Surya adalah adalah salah satu proyek pembangunan yang berada di Pulau Miosara Kecil, SAP Raja Ampat. Dalam proses pe...
Analisis Optimasi Percepatan Waktu Proyek Konstruksi untuk Mengatasi Keterlambatan Jadwal
Analisis Optimasi Percepatan Waktu Proyek Konstruksi untuk Mengatasi Keterlambatan Jadwal
Keterlambatan dalam proyek konstruksi sering kali menjadi tantangan utama yang dapat mempengaruhi biaya, kualitas, dan keberlanjutan proyek. Keterlambatan yang terjadi harus segera...
FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA MASA PANDEMI
FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA MASA PANDEMI
Keterlambatan pekerjaan proyek konstruksi umumnya selalu membuat kerugian baik bagi owner maupun kontraktor, karena faktor dari keterlambatan ialah persoalan dan permasalahan tenta...