Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Dynamics Analysis of Mooring Near Space Airship with Nosecone Constraint

View through CrossRef
The near space airships usually have a large volume. when the airship leave the boathouse, it is influenced by the near surface wind significantly, and the attitude of the airship will change, and the risk of the experiment will be increase. In this paper, the dynamics method is used to analyse the force in the mooring rope and the attitude of the airship with nosecone constraint. The kinetic equation is established. A typical near space airship is choose as an example. The Runge- Kutta method is used to solve the dynamic equation. According to calculation result, the change law of the force in the mooring rope and the attitude of the airship is given, which can provide reference for the near space airship experiment. For the airport in this paper, the force in the mooring rope near the tail in the windward side is bigger than the others. The stronger rope should be used in design.
Title: Dynamics Analysis of Mooring Near Space Airship with Nosecone Constraint
Description:
The near space airships usually have a large volume.
when the airship leave the boathouse, it is influenced by the near surface wind significantly, and the attitude of the airship will change, and the risk of the experiment will be increase.
In this paper, the dynamics method is used to analyse the force in the mooring rope and the attitude of the airship with nosecone constraint.
The kinetic equation is established.
A typical near space airship is choose as an example.
The Runge- Kutta method is used to solve the dynamic equation.
According to calculation result, the change law of the force in the mooring rope and the attitude of the airship is given, which can provide reference for the near space airship experiment.
For the airport in this paper, the force in the mooring rope near the tail in the windward side is bigger than the others.
The stronger rope should be used in design.

Related Results

North Sea Mooring Systems: How Reliable Are They?
North Sea Mooring Systems: How Reliable Are They?
In recent years a number of high profile mooring failures have emphasised the high risk nature of this element of a floating structure. Semi-submersible Mobile Offshore Drilling Un...
Integrity Management of Mooring Systems
Integrity Management of Mooring Systems
Abstract Mooring systems remain an important component of an overall field development. There are numerous sources in literature describing challenges with mooring s...
Sensitivity Analysis of Different Parameters of Taut Mooring System of a Truss Spar
Sensitivity Analysis of Different Parameters of Taut Mooring System of a Truss Spar
Abstract The taut mooring system is widely used for some advantages, such as smaller mooring radius, lighter total weight and better anti-corrosion performance. In t...
Zigzag Mooring Line Design for Shallow Water Semi-Submersible FOWT
Zigzag Mooring Line Design for Shallow Water Semi-Submersible FOWT
Abstract A novel mooring design with zigzag-shaped mooring line profile (patent pending) is proposed as a small footprint soft mooring system for floating offshore w...
A Parametric Study of Low-Frequency Damping of Mooring System
A Parametric Study of Low-Frequency Damping of Mooring System
Mooring line damping plays an important role to the body motion of moored floating platforms. Meanwhile, it can also make contributions to optimize the mooring line system. Accurat...
A Fixed Single-Point Mooring Innovation Solution for Offshore LNG-FSRU Import Terminal
A Fixed Single-Point Mooring Innovation Solution for Offshore LNG-FSRU Import Terminal
Abstract Natural gas plays a critical role in sustainable development and energy transition because it's safe, high-heat and clean energy. LNG-FSRU is an offshore fl...
Mooring System Integrity Challenges and Repair Experience of South China Sea Floating Production Units
Mooring System Integrity Challenges and Repair Experience of South China Sea Floating Production Units
Abstract This paper is written to provide working experience for mooring integrity works done in South China Sea. The relevant statistical data and repair methods of...
Gryphon Alpha FPSO - Experience Gained During Moorings Replacement and Hook-Up
Gryphon Alpha FPSO - Experience Gained During Moorings Replacement and Hook-Up
Abstract In a North Sea storm during February 2011 the Gryphon Alpha FPSO broke four of her 10 mooring lines and moved partially off station, causing damage to su...

Back to Top