Mooring System Integrity Challenges and Repair Experience of South China Sea Floating Production Units

View through CrossRef
Abstract This paper is written to provide working experience for mooring integrity works done in South China Sea. The relevant statistical data and repair methods of floater permanent mooring systems are to provide the industry with more references and insides. There are total 10 floating units operating in South China Sea (9 FPSOs and 1 FPS). Half of them were initially installed in mid to late 90's. The rest were put in production after year 2000. All FPSO moorings are permanent internal turret type. During the operation period, there have been various mooring system integrity issues. In the past 20 years, there have been 3 major mooring system incidents and other 5 with various integrity issues. For the total 8 cases, various mooing system remediation actions have been taken to bring them back to standard. Considerations for mooring system design, installation and inspection have been put in place for existing system continuous safe operation or new systems to be installed in this area. A mooring system integrity management system is also under development by CNOOC. This article tries to review all the mooring integrity issues we have faced in the past 20 years at South China Sea. The repair solutions for each case are briefed. Guide lines for improvements in design, installation and inspection for future systems are given. Mooring system integrity issues in South China Sea oil fields are related to areas of design, maintenance and inspection etc. The findings provide good information for new designs and help for better management of existing installations. It will also provide some shared learning on mooring system integrity management to other operators.
Title: Mooring System Integrity Challenges and Repair Experience of South China Sea Floating Production Units
Description:
Abstract This paper is written to provide working experience for mooring integrity works done in South China Sea.
The relevant statistical data and repair methods of floater permanent mooring systems are to provide the industry with more references and insides.
There are total 10 floating units operating in South China Sea (9 FPSOs and 1 FPS).
Half of them were initially installed in mid to late 90's.
The rest were put in production after year 2000.
All FPSO moorings are permanent internal turret type.
During the operation period, there have been various mooring system integrity issues.
In the past 20 years, there have been 3 major mooring system incidents and other 5 with various integrity issues.
For the total 8 cases, various mooing system remediation actions have been taken to bring them back to standard.
Considerations for mooring system design, installation and inspection have been put in place for existing system continuous safe operation or new systems to be installed in this area.
A mooring system integrity management system is also under development by CNOOC.
This article tries to review all the mooring integrity issues we have faced in the past 20 years at South China Sea.
The repair solutions for each case are briefed.
Guide lines for improvements in design, installation and inspection for future systems are given.
Mooring system integrity issues in South China Sea oil fields are related to areas of design, maintenance and inspection etc.
The findings provide good information for new designs and help for better management of existing installations.
It will also provide some shared learning on mooring system integrity management to other operators.

Related Results

Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Abstract Mooring systems utilizing polyester ropes have facilitated exploration and production of deepwater fields and represent a step-change in mooring system d...
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Compared with the traditional catenary or semi-taut mooring lines, the taut mooring system is more advantageous in many aspects, such as reduction of mooring line loads, erosion an...
Mooring Safety Assessment Using Reliability Techniques
Mooring Safety Assessment Using Reliability Techniques
ABSTRACT The paper deals with the reliability of offshore mooring systems. Reliability techniques have been applied to assess mooring systems designed by the quas...
Research and Design on Internal Turret Mooring System of FPSO in South China Sea
Research and Design on Internal Turret Mooring System of FPSO in South China Sea
This paper mainly introduced the research and design procedure, method and conclusion for internal turret mooring system of FPSO in South China Sea. According to the environmental ...
North Sea Mooring Systems: How Reliable Are They?
North Sea Mooring Systems: How Reliable Are They?
In recent years a number of high profile mooring failures have emphasised the high risk nature of this element of a floating structure. Semi-submersible Mobile Offshore Drilling Un...
Finite Element Analysis of Composite Mooring Tensioner Springs in Wave Energy Converters
Finite Element Analysis of Composite Mooring Tensioner Springs in Wave Energy Converters
Abstract Floating structures are widely used in the offshore oil and gas industry, in deep-sea wind farms, and ocean wave energy converters, where fixed-bottom desig...
Reliability of Mooring Systems: Application to Polyester Moorings
Reliability of Mooring Systems: Application to Polyester Moorings
Abstract The trend to deep water oilfields has accelerated the development of mooring systems. Future moorings requirements represent a considerable step out on c...
Integrity Management of Mooring Systems
Integrity Management of Mooring Systems
Abstract Mooring systems remain an important component of an overall field development. There are numerous sources in literature describing challenges with mooring s...

Back to Top