Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Polyurea Great Wall Beijing-Shanghai High Speed Railway Polyurea Protection Project

View through CrossRef
Abstract This paper presented the polyurea protective project of Beijing-Shanghai High Speed Railway. It also reviewed the polyurea history in China, introuduced research and development of polyurea in Qingdao Technological University. The analysis and discussion on the application problems exposed in the Beijing-Shanghai High Speed Railway project were performed in this paper. It proposed a polyurethane based all weather surface preparation system for Beijing-Shanghai High Speed Railway polyurea project and settled the long term problem confusing Chinese polyurea industry. The comprehensive perfermance of surface preparation systems for Beijing-Shanghai High Speed Railway polyurea project in jobsite was also investigated. The pull-off test, tack free time and visual inspection were employed to determine the adhesion and coverage effect of the bughole on shot blasted concrete surface. The results indicate that: polyurethane based system porformed an excellent comprehensive performance better than epoxy based system both in adhesion and in elimination of pinhole for up coming polyurea application. This polyurea project goes forward well even in both cold and dry season in the north, and hot and moist season in the south attributed to this novel polyurethane based system.
Title: Polyurea Great Wall Beijing-Shanghai High Speed Railway Polyurea Protection Project
Description:
Abstract This paper presented the polyurea protective project of Beijing-Shanghai High Speed Railway.
It also reviewed the polyurea history in China, introuduced research and development of polyurea in Qingdao Technological University.
The analysis and discussion on the application problems exposed in the Beijing-Shanghai High Speed Railway project were performed in this paper.
It proposed a polyurethane based all weather surface preparation system for Beijing-Shanghai High Speed Railway polyurea project and settled the long term problem confusing Chinese polyurea industry.
The comprehensive perfermance of surface preparation systems for Beijing-Shanghai High Speed Railway polyurea project in jobsite was also investigated.
The pull-off test, tack free time and visual inspection were employed to determine the adhesion and coverage effect of the bughole on shot blasted concrete surface.
The results indicate that: polyurethane based system porformed an excellent comprehensive performance better than epoxy based system both in adhesion and in elimination of pinhole for up coming polyurea application.
This polyurea project goes forward well even in both cold and dry season in the north, and hot and moist season in the south attributed to this novel polyurethane based system.

Related Results

Polyurea Great Wall Beijing-Shanghai High Speed Railway Polyurea Protective Project
Polyurea Great Wall Beijing-Shanghai High Speed Railway Polyurea Protective Project
Abstract This paper presented the polyurea protective project of Beijing-Shanghai High Speed Railway. It also reviewed the polyurea history in China, introuduced res...
Photoresist Characteristics of Polyurea Films Prepared by Vapor Deposition Polymerization
Photoresist Characteristics of Polyurea Films Prepared by Vapor Deposition Polymerization
Aromatic polyurea was prepared by vapor deposition polymerization of 4,4′-diaminodiphenyl methane and 4,4′-diphenylmethane diisocyanate, and the mass spectra of the gases obtaine...
Nonporous, Strong, Stretchable, and Transparent Electrospun Aromatic Polyurea Nanocomposites as Potential Anticorrosion Coating Films
Nonporous, Strong, Stretchable, and Transparent Electrospun Aromatic Polyurea Nanocomposites as Potential Anticorrosion Coating Films
This study, for the first time, focused on the fabrication of nonporous polyurea thin films (~200 microns) using the electrospinning method as a novel approach for coating applicat...
Investigation on Hydraulic Fracturing and Flexible Anti-Hydrofracturing Solution for Xiaowan Arch Dam
Investigation on Hydraulic Fracturing and Flexible Anti-Hydrofracturing Solution for Xiaowan Arch Dam
Understanding hydraulic fracturing in concrete super-high arch dams is vital for the implementation of safety measures on the bearing surface. In this study, we conducted tests on ...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
Natural disaster warning system for safe operation of a high-speed railway
Natural disaster warning system for safe operation of a high-speed railway
Abstract In this paper, the least square support vector machine (LSSVM) is used to study the safety of a high-speed railway. According to the principle of LSSVM regr...
A Research on the Incentive Mechanism and Guarantee Measures of High-Quality Running of Shanghai Amateurs Games
A Research on the Incentive Mechanism and Guarantee Measures of High-Quality Running of Shanghai Amateurs Games
In 2017, under the background of implementing the national fitness plan and promoting the construction of healthy Shanghai, Shanghai initiated the Amateurs Games system. Also in th...

Back to Top