Investigation on Hydraulic Fracturing and Flexible Anti-Hydrofracturing Solution for Xiaowan Arch Dam
View through CrossRef
Understanding hydraulic fracturing in concrete super-high arch dams is vital for the implementation of safety measures on the bearing surface. In this study, we conducted tests on hydraulic fracturing for the Xiaowan arch dam (294.5 m) to analyze concrete behavior at cracks under various stress conditions. The risk of hydraulic fracturing near the dam heel was identified without compressive stress. Addressing this, we propose a flexible anti-hydrofracturing system using GB sealing material and a spray polyurea coating. Simulation tests on three schemes: ‘3 mm GB plate + 4 mm polyurea’, ‘1 mm GB glue + 5 mm polyurea’, and ‘7 mm polyurea’ showed effective prevention of hydrofracturing at concrete crack openings of 5 mm, 8 mm, or 10 mm under 300 m water pressure. Field tests supported ‘3 mm GB plate + 4 mm polyurea’ and ‘7 mm polyurea’ as optimal solutions for dam sections. Implementation involves a protective block layout with ‘3 mm GB plate + 4 mm polyurea’ on blocks and ‘7 mm polyurea’ in interval zones and corners. Since 2008, maximum leakage, including rock foundation, has remained minimal at 2.78 L/s under regular water levels. These insights aid similar concrete dams in optimizing safety systems.
Title: Investigation on Hydraulic Fracturing and Flexible Anti-Hydrofracturing Solution for Xiaowan Arch Dam
Description:
Understanding hydraulic fracturing in concrete super-high arch dams is vital for the implementation of safety measures on the bearing surface.
In this study, we conducted tests on hydraulic fracturing for the Xiaowan arch dam (294.
5 m) to analyze concrete behavior at cracks under various stress conditions.
The risk of hydraulic fracturing near the dam heel was identified without compressive stress.
Addressing this, we propose a flexible anti-hydrofracturing system using GB sealing material and a spray polyurea coating.
Simulation tests on three schemes: ‘3 mm GB plate + 4 mm polyurea’, ‘1 mm GB glue + 5 mm polyurea’, and ‘7 mm polyurea’ showed effective prevention of hydrofracturing at concrete crack openings of 5 mm, 8 mm, or 10 mm under 300 m water pressure.
Field tests supported ‘3 mm GB plate + 4 mm polyurea’ and ‘7 mm polyurea’ as optimal solutions for dam sections.
Implementation involves a protective block layout with ‘3 mm GB plate + 4 mm polyurea’ on blocks and ‘7 mm polyurea’ in interval zones and corners.
Since 2008, maximum leakage, including rock foundation, has remained minimal at 2.
78 L/s under regular water levels.
These insights aid similar concrete dams in optimizing safety systems.
Related Results
Sequential Propagation of Multiple Fractures in Horizontal Wells
Sequential Propagation of Multiple Fractures in Horizontal Wells
ABSTRACT:
Simultaneous fracturing and zipper fracturing of horizontal wells has rapidly evolved to the development of unconventional oil and gas. The fracture int...
Study of Damage Evaluation of Hydraulic Fracturing to Reservoirs
Study of Damage Evaluation of Hydraulic Fracturing to Reservoirs
Abstract
Classic hydraulic fracturing analysis is based on tensile strength of rock, failure criteria of fracture mechanics or Mohr-Coulomb criteria. The existing...
Perspectives of Unconventional Water Sources Implementation in Hydraulic Fracturing
Perspectives of Unconventional Water Sources Implementation in Hydraulic Fracturing
Abstract
Currently, Russia experienced a rapid growth in horizontal wells drilling. The most popular method of completion is hydraulic fracturing. About 99% of hydra...
Three-Dimensional Geomechanical Modeling and Well Spacing Optimization Application in Sichuan Shale Gas Block
Three-Dimensional Geomechanical Modeling and Well Spacing Optimization Application in Sichuan Shale Gas Block
ABSTRACT:
At present, unconventional reservoirs require horizontal drilling and large-scale hydraulic fracturing technology to increase artificial fracture networ...
FEA of Effects Induced by Diurnal Temperature Variation on Downstream Surface of Xiaowan Arch Dam
FEA of Effects Induced by Diurnal Temperature Variation on Downstream Surface of Xiaowan Arch Dam
In order to make clear the cracking reasons in arch dam of Xiaowan Hydropower Station during operation period, the approach to combine ANSYS with finite element program COCE‐3D is ...
Research on Environment-Friendly Fracturing Technologies and Practices for Shale Gas Plays in China
Research on Environment-Friendly Fracturing Technologies and Practices for Shale Gas Plays in China
Abstract
At present, shale gas development mainly relies on hydraulic fracturing. However, hydraulic fracturing is associated with significant drawbacks, includin...
Overview: Hydraulic Fracturing (March 2007)
Overview: Hydraulic Fracturing (March 2007)
Hydraulic fracturing is at a crossroads.
Industry is more interested in this technology than ever before, as evidenced by the explosion of SPE hydraulic-fracturin...
Hydraulic Fracturing Design Optimization Using a Fieldwide Calibrated Geomechanics Model
Hydraulic Fracturing Design Optimization Using a Fieldwide Calibrated Geomechanics Model
Abstract
Hydraulic fracturing optimisation for tight sandstone requires a reliable geomechanical model in the reservoirs and bounding formations to achieve a desired...