Javascript must be enabled to continue!
Stall Warning Approach With Application to Stall Precursor-Suppressed Casing Treatment
View through CrossRef
The present work develops a stall warning approach with application to a stall enhancement system. This technique is proposed on the basis of the periodicity of pressure signals sampled by the dynamic pressure sensor which is located on the casing wall at the rotor leading edge. A parameter called Rc, defined to evaluate this periodicity, is calculated by pressure signals within 1 blade pitches in the current one and previous one shaft period. Statistical estimates are implemented on Rc within statistical windows which move with sampling. The probabilities of Rc less than a threshold Rcth are calculated and used as a criterion for stall warning. Experiments are carried out on a low speed compressor with a stall precursor-suppressed (SPS) casing treatment, an efficient stall enhancement system. Results show that the probability increases significantly when the stall boundary is approached. At the same work point, the value of probability will decrease when the SPS casing treatment is turned on. This approach successfully generates a stall warning signal and then triggers the SPS casing treatment when the stall margin needs to be extended.
American Society of Mechanical Engineers
Title: Stall Warning Approach With Application to Stall Precursor-Suppressed Casing Treatment
Description:
The present work develops a stall warning approach with application to a stall enhancement system.
This technique is proposed on the basis of the periodicity of pressure signals sampled by the dynamic pressure sensor which is located on the casing wall at the rotor leading edge.
A parameter called Rc, defined to evaluate this periodicity, is calculated by pressure signals within 1 blade pitches in the current one and previous one shaft period.
Statistical estimates are implemented on Rc within statistical windows which move with sampling.
The probabilities of Rc less than a threshold Rcth are calculated and used as a criterion for stall warning.
Experiments are carried out on a low speed compressor with a stall precursor-suppressed (SPS) casing treatment, an efficient stall enhancement system.
Results show that the probability increases significantly when the stall boundary is approached.
At the same work point, the value of probability will decrease when the SPS casing treatment is turned on.
This approach successfully generates a stall warning signal and then triggers the SPS casing treatment when the stall margin needs to be extended.
Related Results
Casing Deformation in Ekofisk
Casing Deformation in Ekofisk
Summary
Casing deformation resulting from reservoir compaction occurred in the Ekofisk field operated by Phillips Petroleum Co. Norway and is a serious problem in...
The Casing Cage Concept For Deepwater Structures
The Casing Cage Concept For Deepwater Structures
ABSTRACT
This paper introduces the casing cage concept and discusses the feasibility of using a casing cage to provide lateral support to the well system casings ...
Data Driven Physics-Guided Casing Fatigue Life Estimation
Data Driven Physics-Guided Casing Fatigue Life Estimation
Abstract
Casing pipe or joint fatigue failure could happen either during drilling in rough offshore operations or production due to alternating temperatures and cycl...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract
Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Effect of Novel Casing Treatment on the Suppression of Stall Precursor in a Transonic Compressor
Effect of Novel Casing Treatment on the Suppression of Stall Precursor in a Transonic Compressor
A kind of novel casing treatment is proposed to realize stall margin enhancement by suppressing stall precursor in turbomachinery. In view of its different configuration and mechan...
Top Drive Casing Running:Challenges and Solutions
Top Drive Casing Running:Challenges and Solutions
Abstract
Opportunity to improve rig floor safety, reduce technical casing running risk and reduce cost has motivated operators to utilise the top drive for casing...
Casing Centralization—Planned Compared to Actual: A Kuwait Case Study
Casing Centralization—Planned Compared to Actual: A Kuwait Case Study
Abstract
Several reasons can contribute to poor cementation; however, proper casing centralization can lead to uniform mud displacement with cement and can mitigate ...
Effect of Sand Production on Casing Integrity
Effect of Sand Production on Casing Integrity
Abstract
This paper documents an engineering study on sand production and its aftermaths on casing damage. Many wells were converted from production to water inje...

