Completion And Workover Well Control Needs Are Different!

View through CrossRef
Abstract Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases. In fact, application of all rules required by drilling well control courses and manuals will result in dangerous situations on many workovers. Furthermore, the majority of class time in a typical well control school is devoted to minimizing surface casing pressure during a kick, a principle that has almost no application in a completion/workover situation. There are at least sixteen key differences between workover wells and drilling wells that demand a different set of requirements for safe well control. These important differences continue to be revealed in the form of surprises as warkover crews struggle to comply with a multitude of very strict rules, all of which have evolved from situations encountered while drilling. This paper will emphasize these key differences and will introduce an idea for replacing current Completion and Workover Blowout Prevention Specifications with just a few easily understood specifications based on the Barrier Concept. Introduction Blowout prevention concepts have been developed for drilling operations over the course of many years. They have resulted in a proliferation of well control schools where these techniques are taught, and are being introduced to petroleum engineering students during their junior and/or senior years. However, many of these concepts are being incorrectly applied to completion/workover operations and may result in a dangerous situation. Therefore, the purpose of this paper is two-fold:To emphasize key differences between completion/workover operations and drilling operations that demand different procedures for preventing blowouts.To introduce an idea for replacing current completion/warkover blowout prevention specifications with a few easily understood specifications based on the Barrier Concept. Figure 1 shows a comparison of the same well undergoing two different stages of completion. In condition A, the well is between rigs. The drilling rig has been moved out after setting and cementing the primary casing string. The casing is currently filled with 11.0 ppg [1318 kg/m3] mud. While waiting for a smaller rig to become available for completing the well as a gas producer, cased hole logs are being run with no rig and no blowout preventer stack on the wellhead. This type of situation is generally perceived as one that is hazardous and has the potential for an uncontrolled blowout. Condition B shows the same well during completion. Note that the well has been perforated and has been killed with 10.0 ppg [1198 kg/m3[ clean completion fluid. The lower-most BOP has been disassembled to change pipe rams to fit the final production tubing. This operation would be perceived as a normal procedure during final completion of the well. The real question, however, is which well configuration is most conducive to a kick and potential uncontrolled blowout? This question can be answered by looking at the pressure overbalance at the reservoir and the degree of communication between the productive formation and the wellbore. In Condition A, the well is in little danger of taking a kick.
Title: Completion And Workover Well Control Needs Are Different!
Description:
Abstract Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases.
In fact, application of all rules required by drilling well control courses and manuals will result in dangerous situations on many workovers.
Furthermore, the majority of class time in a typical well control school is devoted to minimizing surface casing pressure during a kick, a principle that has almost no application in a completion/workover situation.
There are at least sixteen key differences between workover wells and drilling wells that demand a different set of requirements for safe well control.
These important differences continue to be revealed in the form of surprises as warkover crews struggle to comply with a multitude of very strict rules, all of which have evolved from situations encountered while drilling.
This paper will emphasize these key differences and will introduce an idea for replacing current Completion and Workover Blowout Prevention Specifications with just a few easily understood specifications based on the Barrier Concept.
Introduction Blowout prevention concepts have been developed for drilling operations over the course of many years.
They have resulted in a proliferation of well control schools where these techniques are taught, and are being introduced to petroleum engineering students during their junior and/or senior years.
However, many of these concepts are being incorrectly applied to completion/workover operations and may result in a dangerous situation.
Therefore, the purpose of this paper is two-fold:To emphasize key differences between completion/workover operations and drilling operations that demand different procedures for preventing blowouts.
To introduce an idea for replacing current completion/warkover blowout prevention specifications with a few easily understood specifications based on the Barrier Concept.
Figure 1 shows a comparison of the same well undergoing two different stages of completion.
In condition A, the well is between rigs.
The drilling rig has been moved out after setting and cementing the primary casing string.
The casing is currently filled with 11.
0 ppg [1318 kg/m3] mud.
While waiting for a smaller rig to become available for completing the well as a gas producer, cased hole logs are being run with no rig and no blowout preventer stack on the wellhead.
This type of situation is generally perceived as one that is hazardous and has the potential for an uncontrolled blowout.
Condition B shows the same well during completion.
Note that the well has been perforated and has been killed with 10.
0 ppg [1198 kg/m3[ clean completion fluid.
The lower-most BOP has been disassembled to change pipe rams to fit the final production tubing.
This operation would be perceived as a normal procedure during final completion of the well.
The real question, however, is which well configuration is most conducive to a kick and potential uncontrolled blowout? This question can be answered by looking at the pressure overbalance at the reservoir and the degree of communication between the productive formation and the wellbore.
In Condition A, the well is in little danger of taking a kick.

Related Results

Recent Innovations in Offshore Completion and Workover Systems
Recent Innovations in Offshore Completion and Workover Systems
ABSTRACT Humble Oil &Refining Company has developed an offshore completion and workover system, for use with multi-well fixed platform development, which util...
Workover/Well Intervention and Regulatory Challenges
Workover/Well Intervention and Regulatory Challenges
Abstract Historically classification of ships was introduced for the maritime industry. This was back in the 18th. Century when all ships had very similar tasks. ...
Research on Protecting Formation Low-Damage Workover Fluid in Low Permeability Reservoir
Research on Protecting Formation Low-Damage Workover Fluid in Low Permeability Reservoir
During the workover treatment process, poorly compatible workover fluids infiltrating into reservoir could cause serious formation damage. To tackle the aformentioned issues, in th...
MEGATHYST - A Compact Dynamically Positioned Semisub for Deep Waters
MEGATHYST - A Compact Dynamically Positioned Semisub for Deep Waters
Abstract MSV Amethyst is a compact, fully Dynamically Positioned semisub, designed for workover on subsea wells in the North Sea, supplied in 1987. In 1996 a new ...
Completion and Workover Well Control Needs Are Different
Completion and Workover Well Control Needs Are Different
Abstract Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases. In fact,...
Foam Recompletion of High-Angle, Low-Pressure Dry Gas Wells, Offshore Louisiana
Foam Recompletion of High-Angle, Low-Pressure Dry Gas Wells, Offshore Louisiana
ABSTRACT Planning and executing recompletions in low pressure reservoirs (less than 4 lbm/gal equivalent) present operators with several challenging conditions. Thes...
Novel Workflow to Optimise Annular Flow Isolation in Advanced Wells
Novel Workflow to Optimise Annular Flow Isolation in Advanced Wells
Abstract Advanced well completion with multiple, downhole flow control devices such as Inflow Control Devices (ICDs), are a proven and effective solution to mitig...
Jeugdbescherming op maat: Een pilotonderzoek naar ARIJ-Needs
Jeugdbescherming op maat: Een pilotonderzoek naar ARIJ-Needs
Recentelijk is ARIJ-Needs ontwikkeld om professionals te ondersteunen in zowel behoeftetaxatie als besluitvorming over passende zorg voor gezinnen met risico’s op (herhaling van) k...

Back to Top