Completion and Workover Well Control Needs Are Different
View through CrossRef
Abstract
Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases. In fact, application of all rules required by drilling well control courses and manuals will result in dangerous situations on many workovers. Furthermore, the majority of class time in a typical well control school is devoted to minimizing surface casing pressure during a kick, a principle that has almost no application in a completion/workover situation.
There are at least sixteen key differences between workover wells and drilling wells that demand a different set of requirements for safe well control. These important differences continue to be revealed in the form of surprises as workover crews struggle to comply with a multitude of very strict rules, all of which have evolved from situations encountered while drilling. This paper will emphasize these key differences and will introduce an idea for replacing current Completion and Workover Blowout Prevention Specifications with just a few easily understood specifications based on the Barrier Concept.
Title: Completion and Workover Well Control Needs Are Different
Description:
Abstract
Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases.
In fact, application of all rules required by drilling well control courses and manuals will result in dangerous situations on many workovers.
Furthermore, the majority of class time in a typical well control school is devoted to minimizing surface casing pressure during a kick, a principle that has almost no application in a completion/workover situation.
There are at least sixteen key differences between workover wells and drilling wells that demand a different set of requirements for safe well control.
These important differences continue to be revealed in the form of surprises as workover crews struggle to comply with a multitude of very strict rules, all of which have evolved from situations encountered while drilling.
This paper will emphasize these key differences and will introduce an idea for replacing current Completion and Workover Blowout Prevention Specifications with just a few easily understood specifications based on the Barrier Concept.
Related Results
Recent Innovations in Offshore Completion and Workover Systems
Recent Innovations in Offshore Completion and Workover Systems
ABSTRACT
Humble Oil &Refining Company has developed an offshore completion and workover system, for use with multi-well fixed platform development, which util...
Workover/Well Intervention and Regulatory Challenges
Workover/Well Intervention and Regulatory Challenges
Abstract
Historically classification of ships was introduced for the maritime industry. This was back in the 18th. Century when all ships had very similar tasks. ...
Research on Protecting Formation Low-Damage Workover Fluid in Low Permeability Reservoir
Research on Protecting Formation Low-Damage Workover Fluid in Low Permeability Reservoir
During the workover treatment process, poorly compatible workover fluids infiltrating into reservoir could cause serious formation damage. To tackle the aformentioned issues, in th...
Completion And Workover Well Control Needs Are Different!
Completion And Workover Well Control Needs Are Different!
Abstract
Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases. In fa...
MEGATHYST - A Compact Dynamically Positioned Semisub for Deep Waters
MEGATHYST - A Compact Dynamically Positioned Semisub for Deep Waters
Abstract
MSV Amethyst is a compact, fully Dynamically Positioned semisub, designed for workover on subsea wells in the North Sea, supplied in 1987. In 1996 a new ...
Low-density workover fluid technology designed to lower the required sealing strength for operations in the fractured reservoirs of the Ordos Basin
Low-density workover fluid technology designed to lower the required sealing strength for operations in the fractured reservoirs of the Ordos Basin
Abstract
The tight Upper Paleozoic sandstone reservoirs and Lower Paleozoic carbonate reservoirs in the Ordos Basin necessitate fracturing or acidizing to generate ...
An Innovative Workover Riser System for 3000m Water Depth
An Innovative Workover Riser System for 3000m Water Depth
Abstract
This paper describes the development of an innovative workover riser system for 3000 m water depth, which has been accomplished through a technological a...
Riserless Coiled-Tubing Well Intervention
Riserless Coiled-Tubing Well Intervention
Abstract
This paper describes a concept for subsea coiled tubing well intervention, without the use of a workover riser system. Coiled tubing analyses and design,...