This study was aimed to study the construction work contract for the construction of the GM Bookstore building between PT NI and UGM if reviewed based on the Red Book Federation Internationale des Ingenieurs Counsels (FIDIC) because GM Bookstore building that should be finished February 2005 still not handed over until 2022. This research was conducted with the normative legal research type by using the secondary data in the form of primary legal materials and secondary legal materials obtained with literature studies and interviews. The data were then analyzed using qualitative analysis methods. Conclusion is drawn using a deductive thinking process. The results and conclusions of this study are The construction work contract for the construction of the GMB building between PT NI and UGM when reviewed based on the Red Book by the Fédération Internationale des Ingénieurs Counsels (FIDIC) is only 4 clauses out of 21 clauses with 7 subclauses from the 168 subclauses of the General Conditions Red Book FIDIC which are included in the contract for the construction of the GM Bookstore building. The sub-clauses that are included in the work contract for the construction of the GM Bookstore building are also used only partially and is not constitute the entire sentence referred to in the sub-clause.
Title: Kontrak Kerja Konstruksi Pembangunan Gedung GMB Ditinjau Berdasarkan Red Book FIDIC
Description:
This study was aimed to study the construction work contract for the construction of the GM Bookstore building between PT NI and UGM if reviewed based on the Red Book Federation Internationale des Ingenieurs Counsels (FIDIC) because GM Bookstore building that should be finished February 2005 still not handed over until 2022.
This research was conducted with the normative legal research type by using the secondary data in the form of primary legal materials and secondary legal materials obtained with literature studies and interviews.
The data were then analyzed using qualitative analysis methods.
Conclusion is drawn using a deductive thinking process.
The results and conclusions of this study are The construction work contract for the construction of the GMB building between PT NI and UGM when reviewed based on the Red Book by the Fédération Internationale des Ingénieurs Counsels (FIDIC) is only 4 clauses out of 21 clauses with 7 subclauses from the 168 subclauses of the General Conditions Red Book FIDIC which are included in the contract for the construction of the GM Bookstore building.
The sub-clauses that are included in the work contract for the construction of the GM Bookstore building are also used only partially and is not constitute the entire sentence referred to in the sub-clause.
Related Results
ANALISIS FAKTOR PENYEBAB KLAIM PADA FIDIC DESIGN BUILD 2017
ANALISIS FAKTOR PENYEBAB KLAIM PADA FIDIC DESIGN BUILD 2017
Saat ini banyak proyek internasional dan pemerintah yang dikerjakan di Indonesia sebagai dampak dari perkembangan era globalisasi. Pihak internasional dan pihak pemerintah memberi...
PERANCANGAN SISTEM MANAJEMAN ADMINISTRASI DAN PENGINGAT KONTRAK KARYAWAN PADA PT. PUTRA DUMAS LESTARI
PERANCANGAN SISTEM MANAJEMAN ADMINISTRASI DAN PENGINGAT KONTRAK KARYAWAN PADA PT. PUTRA DUMAS LESTARI
Karyawan kontrak atau sering juga disebut karyawan tidak tetap, umumnya terikat hubungan kerja dengan perusahaan untuk pekerjaan dengan keahlian tertentu, atau jangka waktu tertent...
PEMENUHAN KEWAJIBAN PENGGUNA JASA SESUAI KONTRAK
PEMENUHAN KEWAJIBAN PENGGUNA JASA SESUAI KONTRAK
Penggunaan standar kontrak FIDIC sebagai model kontrak konstruksi di Indonesia semakin meningkat. Proyek-proyek konstruksi baik yang didanai oleh swasta, pemerintah maupun pinjaman...
Equilibrium, Kinetic and Thermodynamic Studies of Biosorption of Methylene Blue on Goethite Modified Baobab Fruit Pod (<i>Adansonia Digitata</i> L.)
Equilibrium, Kinetic and Thermodynamic Studies of Biosorption of Methylene Blue on Goethite Modified Baobab Fruit Pod (<i>Adansonia Digitata</i> L.)
Methylene Blue (MB) was adsorbed from aqueous solution using Baobab (Adansonia digitata L.) fruit pod and its goethite modified form. Adsorbents were characterized using Fourier Tr...
ANALISIS PERANAN KONSULTAN MANAJEMEN KONSTRUKSI DALAM MENCEGAH KETERLAMBATAN WAKTU KONSTRUKSI
ANALISIS PERANAN KONSULTAN MANAJEMEN KONSTRUKSI DALAM MENCEGAH KETERLAMBATAN WAKTU KONSTRUKSI
ABSTRAK Seorang konsultan manajemen konstruksi berperan sebagai penasehat, pembantu, dan partner. Keterlibatan konsultan manajemen konstruksi diharapkan dapat memberikan informasi ...
Klausula Kontrak yang Terkait dengan Extension of Time FIDIC Condition of Contract 2017
Klausula Kontrak yang Terkait dengan Extension of Time FIDIC Condition of Contract 2017
Kontrak konstruksi digunakan dalam semua pekerjaan konstruksi. Walaupun sempat dilanda Pandemi Covid 19, Industri Konstruksi di Indonesia tetap bertumbuh dan bahkan dalam satu deka...
PERSPEKTIF FORCE MAJEURE DAN REBUS SIC STANTIBUS DALAM SISTEM HUKUM INDONESIA
PERSPEKTIF FORCE MAJEURE DAN REBUS SIC STANTIBUS DALAM SISTEM HUKUM INDONESIA
Peranan kontrak sangat penting dalam kehidupan sehari-hari. Kontrak adalah: Kesepakatan para pihak tentang sesuatu hal yang melahirkan perikatan/hubungan hukum, menimbulkan hak dan...
KAJIAN GAYA DALAM PADA KONSTRUKSI RANGKA BATANG (VAKWERK)
KAJIAN GAYA DALAM PADA KONSTRUKSI RANGKA BATANG (VAKWERK)
Dalam ilmu statika benda didalam bidang dapat dibedakan menjadi konstruksi batang dan konstruksi rangka batang. Konstruksi rangka batang merupakan konstruksi yang terdiri dari elem...