A Practical Methodology for the Design and Cost Estimation of Solar Tower Power Plants

View through CrossRef
Concerns over the environmental influence of greenhouse gas (GHG) emissions have encouraged researchers to develop alternative power technologies. Among the most promising, environmentally friendly power technologies for large-scale applications are solar power tower plants. The implementation of this technology calls for practical modeling and simulation tools to both size the plant and investigate the scale effect on its economic indices. This paper proposes a methodology to design the main components of solar power tower plants and to estimate the specific investment costs and the economic indices. The design approach used in this study was successfully validated through a comparison with the design data of two operational commercial power tower plants; namely, Gemasolar (medium-scale plant of 19.9 MWe) and Crescent Dunes (large-scale plant of 110 MWe). The average uncertainty in the design of a fully operational power tower plant is 8.75%. A cost estimation showed the strong influence of the size of the plant on the investment costs, as well as on the economic indices, including payback period, internal rate of return, total life charge costs, and levelized cost of electricity. As an illustrative example, the methodology was applied to design six solar power tower plants in the range of 10–100 MWe for integration into mining processes in Chile. The results show that the levelized cost of electricity decreases from 156 USD/MWhe for the case of a 10-MWe plant to 131 USD/MWhe for the case of a 100-MWe plant. The internal rate of return of plants included in the analyses ranges from 0.77% (for the 10-MWe case) to 2.37% (for 100-MWe case). Consequently, the simple payback ranges from 16 years (for the 100-MWe case) to 19 years (for the 10-MWe case). The sensitivity analysis shows that the size of the solar receiver heavily depends on the allowable heat flux. The degradation rate and the discount rate have a strong influence on economic indices. In addition, both the operation and the deprecation period, as well as the price of electricity, have a crucial impact on the viability of a solar power tower plant. The proposed methodology has great potential to provide key information for prospective analyses for the implementation of power tower technologies to satisfy clean energy needs under a wide range of conditions.
Title: A Practical Methodology for the Design and Cost Estimation of Solar Tower Power Plants
Description:
Concerns over the environmental influence of greenhouse gas (GHG) emissions have encouraged researchers to develop alternative power technologies.
Among the most promising, environmentally friendly power technologies for large-scale applications are solar power tower plants.
The implementation of this technology calls for practical modeling and simulation tools to both size the plant and investigate the scale effect on its economic indices.
This paper proposes a methodology to design the main components of solar power tower plants and to estimate the specific investment costs and the economic indices.
The design approach used in this study was successfully validated through a comparison with the design data of two operational commercial power tower plants; namely, Gemasolar (medium-scale plant of 19.
9 MWe) and Crescent Dunes (large-scale plant of 110 MWe).
The average uncertainty in the design of a fully operational power tower plant is 8.
75%.
A cost estimation showed the strong influence of the size of the plant on the investment costs, as well as on the economic indices, including payback period, internal rate of return, total life charge costs, and levelized cost of electricity.
As an illustrative example, the methodology was applied to design six solar power tower plants in the range of 10–100 MWe for integration into mining processes in Chile.
The results show that the levelized cost of electricity decreases from 156 USD/MWhe for the case of a 10-MWe plant to 131 USD/MWhe for the case of a 100-MWe plant.
The internal rate of return of plants included in the analyses ranges from 0.
77% (for the 10-MWe case) to 2.
37% (for 100-MWe case).
Consequently, the simple payback ranges from 16 years (for the 100-MWe case) to 19 years (for the 10-MWe case).
The sensitivity analysis shows that the size of the solar receiver heavily depends on the allowable heat flux.
The degradation rate and the discount rate have a strong influence on economic indices.
In addition, both the operation and the deprecation period, as well as the price of electricity, have a crucial impact on the viability of a solar power tower plant.
The proposed methodology has great potential to provide key information for prospective analyses for the implementation of power tower technologies to satisfy clean energy needs under a wide range of conditions.

Related Results

Solar Trackers Using Six-Bar Linkages
Solar Trackers Using Six-Bar Linkages
Abstract A solar panel faces the sun or has the solar ray normal to its face to enhance power reaping. A fixed solar panel can only meet this condition at one moment...
Lena Guyed Tower Project Overview
Lena Guyed Tower Project Overview
ABSTRACT The installation of the Lena guyed tower was one of the industry's most significant accomplishments of 1983. This paper serves as an introduction to a se...
Benguela-Belize Compliant Piled Tower: Tower Design
Benguela-Belize Compliant Piled Tower: Tower Design
Abstract The compliant tower is a proven bottom-founded platform which has been used successfully for three developments in the Gulf of Mexico. The compliant towe...
The Delta Tower: A Light, Compliant Tower for the Gulf of Mexico
The Delta Tower: A Light, Compliant Tower for the Gulf of Mexico
ABSTRACT The concept which is described in the paper is applicable to fields located in the Gulf of Mexico in water depths ranging from 1 000 to 1 750 feet. The c...
Design of the Lena Guyed Tower
Design of the Lena Guyed Tower
ABSTRACT The 1983 Lena platform installation in 1000 feet of water in the Gulf of Mexico culminated twelve years of guyed tower development. During the Lena desig...
VolturnUS 1:8-Scale FRP Floating Wind Turbine Tower: Analysis, Design, Testing and Performance
VolturnUS 1:8-Scale FRP Floating Wind Turbine Tower: Analysis, Design, Testing and Performance
In May of 2013 the VolturnUS 1:8 floating semi-submersible wind turbine was successfully deployed off the coast of Castine, Maine, making the unit the first grid connected offshore...
SUNTRACKER
SUNTRACKER
A SUNTRACKER (illustrated in figure1), is a Concentrating Solar Power (CSP) unit, in the category of solar dish engines. The novel solar dish engine module (shown in figure 2) is d...
OPTIMALISASI LETAK TOWER CRANE TERHADAP WAKTU SIKLUS PADA PROYEK Y
OPTIMALISASI LETAK TOWER CRANE TERHADAP WAKTU SIKLUS PADA PROYEK Y
In a construction project, there are various kinds of very complex activities. Therefore, heavy equipment, especially Tower Cranes is used to assist the work on the construction pr...