Based on wavelet transform, the blasting vibration signals are analyzed here. For millisecond blasting, the blasting effect is mostly affected by the actual delay time. Local characteristics of the analyzed signals could be highlighted by the wavelet transform. The simultaneous initiation of large explosive quantity could be avoided by the use of multistage detonators, while the vibration resistance effect could be better. For the same level of detonator segment, the larger the arranged time interval, the less the possibility of initiation at the same time, which is not conducive to the vibration resistance. Therefore, it is suggested to use high‐level detonators with detonating cord or high‐precision digital electronic detonators to minimize the initiation error. Furthermore, by identifying the delay time using wavelet transform, the interval delay time of different detonator segments could be obtained. Moreover, the nominal delay time, actual delay time, and interval delay time are further compared and analyzed. It is suggested that the millisecond delay series of detonators should be selected in the whole section blasting, and the segment should be jumped as much as possible, so as to increase the secondary breakage time. Detonators with longer interval delay time should be avoided to the full.
Title: Identifying Delay Time of Detonator for a Millisecond Blasting
Description:
Based on wavelet transform, the blasting vibration signals are analyzed here.
For millisecond blasting, the blasting effect is mostly affected by the actual delay time.
Local characteristics of the analyzed signals could be highlighted by the wavelet transform.
The simultaneous initiation of large explosive quantity could be avoided by the use of multistage detonators, while the vibration resistance effect could be better.
For the same level of detonator segment, the larger the arranged time interval, the less the possibility of initiation at the same time, which is not conducive to the vibration resistance.
Therefore, it is suggested to use high‐level detonators with detonating cord or high‐precision digital electronic detonators to minimize the initiation error.
Furthermore, by identifying the delay time using wavelet transform, the interval delay time of different detonator segments could be obtained.
Moreover, the nominal delay time, actual delay time, and interval delay time are further compared and analyzed.
It is suggested that the millisecond delay series of detonators should be selected in the whole section blasting, and the segment should be jumped as much as possible, so as to increase the secondary breakage time.
Detonators with longer interval delay time should be avoided to the full.
Related Results
Study on the Technology of Enhancing Permeability by Millisecond Blasting in Sanyuan Coal Mine
Study on the Technology of Enhancing Permeability by Millisecond Blasting in Sanyuan Coal Mine
To reduce gas disasters in low permeability and high-gas coal seams and improve gas predrainage efficiency, conventional deep-hole presplitting blasting permeability increasing tec...
PENANGANAN MISFIRE PADA ELEKTRONIK DETONATOR DENGAN METODE DOUBLE INITIATION
PENANGANAN MISFIRE PADA ELEKTRONIK DETONATOR DENGAN METODE DOUBLE INITIATION
PT Multi Nitrotama Kimia merupakan salah satu perusahaan jasa pertambangan yang bergerak pada bidang penyedia jasa peledakan dan penjualan bahan peledak terbesar di Indonesia. PT A...
Study on the technology of enhancing permeability by deep hole presplitting blasting in Sanyuan coal mine
Study on the technology of enhancing permeability by deep hole presplitting blasting in Sanyuan coal mine
AbstractTo reduce gas disasters in low permeability and high gas coal seams and improve gas predrainage efficiency, conventional deep hole presplitting blasting permeability increa...
Comparison and application of top and bottom air decks to improve blasting operations
Comparison and application of top and bottom air decks to improve blasting operations
<abstract>
<p>The blasting operation is an integral part of mines, and it is still being used as the most economical tool to fragment and displace rock mass. Appropriat...
Liquid CO2 Phase Change Fracturing and Vibration Monitoring in Roadbed Slope Excavation
Liquid CO2 Phase Change Fracturing and Vibration Monitoring in Roadbed Slope Excavation
Abstract
In order to analyze the vibration impact of carbon dioxide fracturing tube blasting red sandstone, combined with the engineering conditions and surrounding ...
EXPERIMENTAL AND NUMERICAL INVESTIGATION OF BLASTING-INDUCED GROUND VIBRATION FROM TUNNEL UNDERCROSSING A VILLAGE
EXPERIMENTAL AND NUMERICAL INVESTIGATION OF BLASTING-INDUCED GROUND VIBRATION FROM TUNNEL UNDERCROSSING A VILLAGE
To study the effect of blasting-induced vibration on ground buildings when tunnel undercrossing a village, a blasting vibration trial was carried out in Beizhuang tunnel in Henan P...
Theoretical Analysis of Rock Blasting Damage in Construction of Tunnels Closely Under-Passing Sewage Box Culverts
Theoretical Analysis of Rock Blasting Damage in Construction of Tunnels Closely Under-Passing Sewage Box Culverts
With the large-scale construction of urban traffic tunnels in China, it has become common to underpass existing buildings and structures such as sewage box culverts and pipelines u...
Review of machine learning application in mine blasting
Review of machine learning application in mine blasting
AbstractMine blasting has adopted machine learning (ML) into its practices with the aims of performance optimization, better decision-making process, and work safety. This study is...