Construction Sequence Simulation for Partial Cable Stayed Truss Bridge with Single Pylon

View through CrossRef
<p> Qiansimen Bridge, a part of Liangjiang Bridge in Chongqing city in China, is currently under construction by the Chinese contractor CCCC, Second Harbor Engineering Company Ltd. The bridge has been designed by T.Y. Lin International (China) as partially cable stayed bridge with steel truss girders and a single reinforced concrete pylon. The opening of the bridge is planned for July 2014. Each steel truss segment has a length of 16 m and forms an extremely heavy element of the bridge, which cannot be fabricated and erected in one piece. Stay cable forces vary between 10 000 and 15 000 kN during erection phase and in final state. Proper layout and adjustment of cable forces throughout the construction schedule is usually a tedious process. This paper presents an ingenious numerical simulation of the bridge construction sequence, where the erection process is accurately followed up by appropriate techniques. Result of the simulation is an optimized construction sequence of the steel truss, which on the one hand leads to a reasonable stress distribution in the truss elements and on the other hand allows for saving construction costs by avoiding multiple adjustments of stay cable forces during the construction process.</p>
International Association for Bridge and Structural Engineering (IABSE)
Title: Construction Sequence Simulation for Partial Cable Stayed Truss Bridge with Single Pylon
Description:
<p> Qiansimen Bridge, a part of Liangjiang Bridge in Chongqing city in China, is currently under construction by the Chinese contractor CCCC, Second Harbor Engineering Company Ltd.
The bridge has been designed by T.
Y.
Lin International (China) as partially cable stayed bridge with steel truss girders and a single reinforced concrete pylon.
The opening of the bridge is planned for July 2014.
Each steel truss segment has a length of 16 m and forms an extremely heavy element of the bridge, which cannot be fabricated and erected in one piece.
Stay cable forces vary between 10 000 and 15 000 kN during erection phase and in final state.
Proper layout and adjustment of cable forces throughout the construction schedule is usually a tedious process.
This paper presents an ingenious numerical simulation of the bridge construction sequence, where the erection process is accurately followed up by appropriate techniques.
Result of the simulation is an optimized construction sequence of the steel truss, which on the one hand leads to a reasonable stress distribution in the truss elements and on the other hand allows for saving construction costs by avoiding multiple adjustments of stay cable forces during the construction process.
</p>.

Related Results

Research on Horizontal Scheme for Multi-Pylon Cable-Stayed Bridge
Research on Horizontal Scheme for Multi-Pylon Cable-Stayed Bridge
Longitudinal assembled stiffness is the biggest problem for multi-pylon cable-stayed bridge. The longitudinal displacement and midspan deflection could be effectively controlled by...
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
          Due to the swivel construction, the structural redundancy of cable-stayed bridge is reduced, and its seismic vulnerability is significantly higher than that of non-swirli...
Parametric Design of Scroll-shaped Pylon of Single Tower Cable-stayed Bridge
Parametric Design of Scroll-shaped Pylon of Single Tower Cable-stayed Bridge
Using single-tower cable-stayed bridge as example, this article introduces the design and construction process of a cable-stayed bridge with a scroll-shaped tower, as well as the o...
Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
<p>In this study, the behavior of a cable-stayed bridge with a partially earth anchored cable system was studied both for the construction phase and for the operational phase...
Structural Optimizations of Extradosed Cable‐Stayed Bridge by Using Genetic Algorithm
Structural Optimizations of Extradosed Cable‐Stayed Bridge by Using Genetic Algorithm
AbstractAn extradosed cable‐stayed bridge employs a structure that combines the main elements of both a prestressed box girder bridge and a cable‐stayed bridge. In extradosed cable...
Mechanical Analysis of Stayed Bridge
Mechanical Analysis of Stayed Bridge
Cable stayed bridge, also known as the cable-stayed bridge is of box girder with many cable directly to the towers is a kind of bridge, is by the pressure of the tower, tension of ...
Construction control of cable-stayed bridges
Construction control of cable-stayed bridges
This work presents a study of the simulation of cable-stayed bridges built on temporary supports focused on their response during construction and in service. To simulate the behav...