Amplifying the practicality of contemporary building information modelling (BIM) implementations for New Zealand green building certification (Green Star)
View through CrossRef
PurposeGreen Star is becoming a broadly accepted mark of design quality and environmental sustainability. Compared to other green tools, Green Star is considered as one of main streams green assessment tools, which cover almost sustainable criteria. Simultaneously, building information modelling (BIM) has also been introduced into the industry. BIM is expected to aid designers to shift the construction industry towards more environmentally and economically sustainable construction practice. Whilst the aspirations of Green Star rating and BIM implementation are broadly aligned, in the context of New Zealand this has led to some disconnects in design strategy and process. The purpose of this paper is to improve the practicality of BIM implementations for delivering Green Star certification in New Zealand.Design/methodology/approachThe extensive literature review is conducted through a series of incremental steps. A conceptual framework focussing on the relationship between benefits and challenges of BIM and Green Star is then developed.FindingsBIM supports practitioners to achieve the majority of Green Star criteria (75 per cent). Energy efficiency criterion is the key factor affecting the assessment process of Green Star and National Australian Built Environment Rating System in New Zealand. Research questions about lessening the challenges which can be encountered during the BIM and Green Star implementation are developed.Research limitations/implicationsThis paper is limited to a conceptual research. Further empirical research should be conducted to validate and modify the conceptual framework and the propositions presented in this paper to provide an initial insight into BIM and Green Star connectivity within the context of New Zealand.Originality/valueThis paper provided a clear picture for investors, developers, practitioners about benefits and challenges of BIM and Green Star implementation. The outcomes are anticipated to deliver visions for shifting the country further towards development of sustainable future cities.
Title: Amplifying the practicality of contemporary building information modelling (BIM) implementations for New Zealand green building certification (Green Star)
Description:
PurposeGreen Star is becoming a broadly accepted mark of design quality and environmental sustainability.
Compared to other green tools, Green Star is considered as one of main streams green assessment tools, which cover almost sustainable criteria.
Simultaneously, building information modelling (BIM) has also been introduced into the industry.
BIM is expected to aid designers to shift the construction industry towards more environmentally and economically sustainable construction practice.
Whilst the aspirations of Green Star rating and BIM implementation are broadly aligned, in the context of New Zealand this has led to some disconnects in design strategy and process.
The purpose of this paper is to improve the practicality of BIM implementations for delivering Green Star certification in New Zealand.
Design/methodology/approachThe extensive literature review is conducted through a series of incremental steps.
A conceptual framework focussing on the relationship between benefits and challenges of BIM and Green Star is then developed.
FindingsBIM supports practitioners to achieve the majority of Green Star criteria (75 per cent).
Energy efficiency criterion is the key factor affecting the assessment process of Green Star and National Australian Built Environment Rating System in New Zealand.
Research questions about lessening the challenges which can be encountered during the BIM and Green Star implementation are developed.
Research limitations/implicationsThis paper is limited to a conceptual research.
Further empirical research should be conducted to validate and modify the conceptual framework and the propositions presented in this paper to provide an initial insight into BIM and Green Star connectivity within the context of New Zealand.
Originality/valueThis paper provided a clear picture for investors, developers, practitioners about benefits and challenges of BIM and Green Star implementation.
The outcomes are anticipated to deliver visions for shifting the country further towards development of sustainable future cities.
Related Results
BIM implementation in architectural practices : towards advanced collaborative approaches based on digital technologies
BIM implementation in architectural practices : towards advanced collaborative approaches based on digital technologies
We are at a stage where Building Information Modelling (BIM) has reached a maturity level to be widely adopted by the professionals and organizations within the Architectural, Engi...
Application of BIM visual programming algorithms for infrastructure projects
Application of BIM visual programming algorithms for infrastructure projects
(English) The BIM digitization has generated a growing automation of traditional AECO project development processes. However, this automation has mainly benefited building projects...
Investigating Significant Issues of BIM Implementation in Industrialised Building System Design and Production Process
Investigating Significant Issues of BIM Implementation in Industrialised Building System Design and Production Process
Industrialised Building System (IBS) has been considered a construction method to accelerate the development of the construction industry in attempt to boost the econo...
Assessing the Implementation of Bim for Cost Management by Quantity Surveyors in Nigeria
Assessing the Implementation of Bim for Cost Management by Quantity Surveyors in Nigeria
Abstract
Construction industry plays a central role in the economic development of most countries; however, it faces major issues relating to project complexity and cost co...
ERK5 knock down aggravates detrimental effects of hypothermal stimulation on cardiomyocytes via Bim upregulation
ERK5 knock down aggravates detrimental effects of hypothermal stimulation on cardiomyocytes via Bim upregulation
Objectives
Our study was designed to investigate role of ERK5/Bim pathway in hypothermal stimulation-induced damage or apoptosis of cardiomyocytes.
...
VR/AR Improving the Adoption of BIM in Construction Planning and Cost Estimation
VR/AR Improving the Adoption of BIM in Construction Planning and Cost Estimation
The Building Information Modelling (BIM) methodology is currently the main support for the development of integrated and collaborative projects within the Construction industry, ha...
Integration of Building Information Modeling and Project Management Process
Integration of Building Information Modeling and Project Management Process
The construction industry has witnessed significant technological advancements in recent years, with Building Information Modelling (BIM) emerging as a pivotal innovation. BIM's in...
BIM Technology for Infrastructure Development in Myanmar
BIM Technology for Infrastructure Development in Myanmar
In the construction industry, building information modeling (BIM) is now the concept developing the fastest both globally and in Myanmar. By increasing the process productivity, ef...