Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Alternative Deployment of an ESP System in South America

View through CrossRef
Abstract As hydrocarbon reservoirs deplete and lose their natural energy to produce fluids to surface, Artificial Lift technologies become essential to maintain hydrocarbon production. Often Electric Submersible Pumps (ESPs) are selected as the optimum Artificial Lift method for a particular field/well but, typically run on jointed tubing, their limited ‘run lives’ require frequent heavy rig/hoist interventions to replace failed systems. This incurs significant production deferment, increased operating cost and unwelcome disruption to operations. Furthermore it often distracts the rigs/hoists from more profitable oil-generating activity. In light of the above, there has been a persistent and continual drive to improve ESP performance and ‘run life’ but, nevertheless, any machine of electro-mechanical complexity will eventually fail, especially in the hostile downhole environment. Attention naturally turned to minimizing the impact of these inevitable ESP failures and focus shifted to ‘alternative deployment methods’ designed to eliminate the ‘turnaround’ time, production deferment and operating costs associated with heavy rig/hoist intervention. Several ‘alternative’ ESP deployment options have been developed over the years but, for various valid reasons, none were readily embraced by the industry. Most recently a downhole electrical wet-connector technology has enabled ESPs to be ‘shuttled’ through tubing on wireline, coiled tubing, slickline or sucker rods and plugged into a downhole ‘docking station’ without the need of a rig or hoist. Although this technology has been successfully installed both onshore and offshore in Africa, Middle East and Far East, this paper reports the first successful installation in Latin America. Moreover, and more pertinently, the paper also reports on the expedient ‘rigless’ retrieval and replacement of the ESP system in response to an unexpected ESP system failure some months after initial installation. The latter substantiates the value proposition of this ‘alternative’ ESP deployment option. These operations took place in the PetroProducción Cuyabeno field, in Ecuador in September and December of 2012.
Title: Alternative Deployment of an ESP System in South America
Description:
Abstract As hydrocarbon reservoirs deplete and lose their natural energy to produce fluids to surface, Artificial Lift technologies become essential to maintain hydrocarbon production.
Often Electric Submersible Pumps (ESPs) are selected as the optimum Artificial Lift method for a particular field/well but, typically run on jointed tubing, their limited ‘run lives’ require frequent heavy rig/hoist interventions to replace failed systems.
This incurs significant production deferment, increased operating cost and unwelcome disruption to operations.
Furthermore it often distracts the rigs/hoists from more profitable oil-generating activity.
In light of the above, there has been a persistent and continual drive to improve ESP performance and ‘run life’ but, nevertheless, any machine of electro-mechanical complexity will eventually fail, especially in the hostile downhole environment.
Attention naturally turned to minimizing the impact of these inevitable ESP failures and focus shifted to ‘alternative deployment methods’ designed to eliminate the ‘turnaround’ time, production deferment and operating costs associated with heavy rig/hoist intervention.
Several ‘alternative’ ESP deployment options have been developed over the years but, for various valid reasons, none were readily embraced by the industry.
Most recently a downhole electrical wet-connector technology has enabled ESPs to be ‘shuttled’ through tubing on wireline, coiled tubing, slickline or sucker rods and plugged into a downhole ‘docking station’ without the need of a rig or hoist.
Although this technology has been successfully installed both onshore and offshore in Africa, Middle East and Far East, this paper reports the first successful installation in Latin America.
Moreover, and more pertinently, the paper also reports on the expedient ‘rigless’ retrieval and replacement of the ESP system in response to an unexpected ESP system failure some months after initial installation.
The latter substantiates the value proposition of this ‘alternative’ ESP deployment option.
These operations took place in the PetroProducción Cuyabeno field, in Ecuador in September and December of 2012.

Related Results

Harsh Environment ESP System
Harsh Environment ESP System
Objective/Scope When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than t...
Mindy Calling: Size, Beauty, Race in The Mindy Project
Mindy Calling: Size, Beauty, Race in The Mindy Project
When characters in the Fox Television sitcom The Mindy Project call Mindy Lahiri fat, Mindy sees it as a case of misidentification. She reminds the character that she is a “petite ...
Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
Abstract Saudi Aramco’s first offshore field produced by electrical submersible pumps (ESPs) has completed a nine year operating cycle, sustaining the field producti...
Mechanistic Modeling of Electrical Submersible Pump ESP Boosting Pressure Under Gassy Flow Conditions and Experimental Validation
Mechanistic Modeling of Electrical Submersible Pump ESP Boosting Pressure Under Gassy Flow Conditions and Experimental Validation
Abstract As an artificial lift method for high-flow-rate oil production, electrical submersible pumps’ (ESP) performance surfers from gas entrainment, a frequently e...
Wireline Retrievable ESP Deployment: Observation, Challenges and Intervention
Wireline Retrievable ESP Deployment: Observation, Challenges and Intervention
Abstract The Offshore Field X Project comprises of greenfield scope to expand the Waterflood scheme towards delivering the peak production levels similar to those ac...
High Rate ESP Application in Onshore Rajasthan Fields: A Case Study
High Rate ESP Application in Onshore Rajasthan Fields: A Case Study
Abstract This paper describes the selection, design, successful application and performance monitoring of Electrical Submersible Pumps (ESP) in the giant Mangala oil...
ESP Optimization Goes Further: Operating Frequency Beyond 60 Hz
ESP Optimization Goes Further: Operating Frequency Beyond 60 Hz
Optimization in brown field developments is always challenging in terms of cost. One of it is XY Field, Rimau Block, South Sumatera with more than 70% of artificial lift is Electri...
Predictive Data Analytics for Effective Electric Submersible Pump Management
Predictive Data Analytics for Effective Electric Submersible Pump Management
Abstract Electrical Submersible Pump (ESP) failures cause disruptions that lead to production deferement besides the cost of interventions/workovers post failure. Th...

Back to Top