Demolition of Buildings – An Overview
View through CrossRef
We know that every structure is designed for a specific life period, generally 100 years. The existence of the structure after the service life period is very dangerous to its occupants and surrounding buildings. Therefore it becomes essential to demolish the building. Demolition is the tearing-down of buildings which involves taking a building apart while preserving the valuable elements for re-use. There are various methods of demolition. The building is brought down either manually or mechanically depending upon the method used for demolition of buildings. Equipments used for demolition work are hammers, rammers, excavators, bulldozers, wrecking ball and the explosives used are dynamites and detonators etc. which is generally preferred for tall buildings. The various steps involved before the demolition process includes surveying of the demolition site, removal of hazardous material and safety precautionary measures. The study also includes the precautionary measures regarding machinery or equipment, scaffolding, public safety and worker safety. Various strategies of demolition waste have been reported in literature for implementing good practices for demolition of buildings.
International Journal of Advanced Trends in Engineering and Management
Title: Demolition of Buildings – An Overview
Description:
We know that every structure is designed for a specific life period, generally 100 years.
The existence of the structure after the service life period is very dangerous to its occupants and surrounding buildings.
Therefore it becomes essential to demolish the building.
Demolition is the tearing-down of buildings which involves taking a building apart while preserving the valuable elements for re-use.
There are various methods of demolition.
The building is brought down either manually or mechanically depending upon the method used for demolition of buildings.
Equipments used for demolition work are hammers, rammers, excavators, bulldozers, wrecking ball and the explosives used are dynamites and detonators etc.
which is generally preferred for tall buildings.
The various steps involved before the demolition process includes surveying of the demolition site, removal of hazardous material and safety precautionary measures.
The study also includes the precautionary measures regarding machinery or equipment, scaffolding, public safety and worker safety.
Various strategies of demolition waste have been reported in literature for implementing good practices for demolition of buildings.
Related Results
Environmental Assessment of Demolition Tools Used in Townhouse Demolition: System Dynamics Modeling
Environmental Assessment of Demolition Tools Used in Townhouse Demolition: System Dynamics Modeling
To accommodate population growth and migration to cities, many infrastructures have been demolished to build new residential units. Demolition processes cause various environmental...
Demolition performance of high-pressure water jet based on SPH coupling with FEM for hydraulic demolition robot
Demolition performance of high-pressure water jet based on SPH coupling with FEM for hydraulic demolition robot
Due to the huge computational cost caused by using multi-layer particles to achieve continuous water jet, this work developed a numerical model adopting single-layer particles to r...
Comparative assessment of environmental and post- occupancy evaluation of green buildings vs conventional buildings
Comparative assessment of environmental and post- occupancy evaluation of green buildings vs conventional buildings
Due to increasing office space demand and rising rental rates, stakeholders seek cost-effective alternatives that align with sustainability goals. Therefore, green building offers ...
Time Passes
Time Passes
<p>The demand for a new approach to safeguarding New Zealand’s endangered historic buildings was identified as a result of the recent increase in building code and strengthen...
ESTIMATING THE DEMOLITION PROBABILITY OF BUILDINGS USING A BOTTOM-UP APPROACH
ESTIMATING THE DEMOLITION PROBABILITY OF BUILDINGS USING A BOTTOM-UP APPROACH
The sources and quantities of construction and demolition waste (CDW) are a major source of uncertainty hindering the optimization of the reverse-logistics network design for this ...
Design contents and methods of bridge blasting demolition scheme
Design contents and methods of bridge blasting demolition scheme
Abstract
When the service life of bridge structure ends, it must be removed. Blasting demolition method is a common method in bridge demolition engineering, and a re...
Spatio-Temporal Patterns and Sentiment Analysis of Ting, Tai, Lou, and Ge Ancient Chinese Architecture Buildings
Spatio-Temporal Patterns and Sentiment Analysis of Ting, Tai, Lou, and Ge Ancient Chinese Architecture Buildings
Ting, Tai, Lou, and Ge are types of ancient buildings that represent traditional Chinese architecture and culture. They are primarily constructed using mortise and tenon joints, co...
Strengthening Workspaces: Adapting Wellington’s Earthquake Prone Heritage Buildings for Co-Workspaces
Strengthening Workspaces: Adapting Wellington’s Earthquake Prone Heritage Buildings for Co-Workspaces
<p><b>In the late 1960s the Wellington City Council surveyed all the commercial buildings in the city and marked nearly 200 as earthquake prone. The owners were given 1...