Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

ILM Application in 66m Span PC Continuous Beam

View through CrossRef
<p>The South Africa MTENTU Bridge project is designed with a total length of 1.13km and it adopts a multi-span prestressed concrete continuous rigid frame box girder structure. The bridge span is arranged as 53.7+5×66+150+260+150+2×66+53.7m, and the whole deck adopts a single-box single-chamber section, with a top width of 16.8m (4 lane dual carriageways and a bottom width of 8.7m.The bridge deck structure is designed with @2.5% slope, the approach road is 19m wide including 2.5m shoulder lanes on each side.the approach spans superstructure is to be constructed by the Incremental Launching method and the main spans constructed by the balance cantilever method.</p><p>The 260m middle span ranks the No.6 big span over the world, in the terms of PC continuous rigid frame bridge. The height of main pylon is 148.5m.</p><p>The main research topic: ILM applied on 66m span PC Beam without pile foundation Methodology: Comparative Analysis (Cast-en-situ with Brackets; Formwork Traveller; ILM) Result: ILM method can applied in 66m span Concrete Beam launching Construction</p><p>Conclusion: In the large span concrete box girder bridge, ILM construction method could be used especially in great gorge where the brackets supporting could not be installed. ILM construction method does not require the flat ground and navigation clearance.</p>
International Association for Bridge and Structural Engineering (IABSE)
Title: ILM Application in 66m Span PC Continuous Beam
Description:
<p>The South Africa MTENTU Bridge project is designed with a total length of 1.
13km and it adopts a multi-span prestressed concrete continuous rigid frame box girder structure.
The bridge span is arranged as 53.
7+5×66+150+260+150+2×66+53.
7m, and the whole deck adopts a single-box single-chamber section, with a top width of 16.
8m (4 lane dual carriageways and a bottom width of 8.
7m.
The bridge deck structure is designed with @2.
5% slope, the approach road is 19m wide including 2.
5m shoulder lanes on each side.
the approach spans superstructure is to be constructed by the Incremental Launching method and the main spans constructed by the balance cantilever method.
</p><p>The 260m middle span ranks the No.
6 big span over the world, in the terms of PC continuous rigid frame bridge.
The height of main pylon is 148.
5m.
</p><p>The main research topic: ILM applied on 66m span PC Beam without pile foundation Methodology: Comparative Analysis (Cast-en-situ with Brackets; Formwork Traveller; ILM) Result: ILM method can applied in 66m span Concrete Beam launching Construction</p><p>Conclusion: In the large span concrete box girder bridge, ILM construction method could be used especially in great gorge where the brackets supporting could not be installed.
ILM construction method does not require the flat ground and navigation clearance.
</p>.

Related Results

On Flores Island, do "ape-men" still exist? https://www.sapiens.org/biology/flores-island-ape-men/
On Flores Island, do "ape-men" still exist? https://www.sapiens.org/biology/flores-island-ape-men/
<span style="font-size:11pt"><span style="background:#f9f9f4"><span style="line-height:normal"><span style="font-family:Calibri,sans-serif"><b><spa...
Crescimento de feijoeiro sob influência de carvão vegetal e esterco bovino
Crescimento de feijoeiro sob influência de carvão vegetal e esterco bovino
<p align="justify"><span style="color: #000000;"><span style="font-family: 'Times New Roman', serif;"><span><span lang="pt-BR">É indiscutível a import...
Automatic classification of paddy leaf disease
Automatic classification of paddy leaf disease
<span lang="EN-MY">Riceisastaple<span>f</span>o<span>o</span>din<span>m</span>ost<span>o</span>ft<span>h</span>e&l...
Hubungan Perilaku Pola Makan dengan Kejadian Anak Obesitas
Hubungan Perilaku Pola Makan dengan Kejadian Anak Obesitas
<p><em><span style="font-size: 11.0pt; font-family: 'Times New Roman',serif; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-langua...
Effects of a new land surface parametrization scheme on thermal extremes in a Regional Climate Model
Effects of a new land surface parametrization scheme on thermal extremes in a Regional Climate Model
&lt;p&gt;&lt;span&gt;The &lt;/span&gt;&lt;span&gt;EFRE project Big Data@Geo aims at providing high resolution &lt;/span&gt;&lt;span&...
Cometary Physics Laboratory: spectrophotometric experiments
Cometary Physics Laboratory: spectrophotometric experiments
&lt;p&gt;&lt;strong&gt;&lt;span dir=&quot;ltr&quot; role=&quot;presentation&quot;&gt;1. Introduction&lt;/span&gt;&lt;/strong&...

Back to Top