Design of Controlled Pre-Split Blasting in a Hydroelectric Construction Project

View through CrossRef
Geologic conditions and design requirements around upstream Nachtigal Falls, in Cameroon, for the hydroelectric construction project on the Sanaga River dictated close control of blasting procedures with very precise geometry to obtain safe and economical excavation lines. Various techniques of pre-split blasting were used in the initial stage of all major excavations. Hole diameters for pre-splitting were 89 mm, and hole spacing ranged from 0.8 to 1m. Explosive charges varied from 1 to 7 kg per hole, and the detonating cord linear charge ranged from 12 to 60g. The contour blasting technique is aimed at controlling overbreak and improving remaining slope stability. Over-break or over-excavation needs to be controlled since its occurrence compromises the operations in terms of safety (instability in the remaining slope; loosening rocks that increase the risk for operational people; an irregular free face for subsequent blasting); and costs (need for reinforcement of the remaining rock structure through costly sustainment systems; increase in concrete volumes in civil works). This paper discusses in detail the design and field implementation of pre-split blasts successfully carried out to achieve clean vertical walls in moderately dipping, though complexly sheared and jointed gneiss. Based on the results of the experiments, we were able to design a pre-splitting pattern both experimentally and in a very cost-effective manner. It is felt that the methods developed on this project could have useful applications on other major construction projects. Doi: 10.28991/CEJ-2023-09-03-05 Full Text: PDF
Title: Design of Controlled Pre-Split Blasting in a Hydroelectric Construction Project
Description:
Geologic conditions and design requirements around upstream Nachtigal Falls, in Cameroon, for the hydroelectric construction project on the Sanaga River dictated close control of blasting procedures with very precise geometry to obtain safe and economical excavation lines.
Various techniques of pre-split blasting were used in the initial stage of all major excavations.
Hole diameters for pre-splitting were 89 mm, and hole spacing ranged from 0.
8 to 1m.
Explosive charges varied from 1 to 7 kg per hole, and the detonating cord linear charge ranged from 12 to 60g.
The contour blasting technique is aimed at controlling overbreak and improving remaining slope stability.
Over-break or over-excavation needs to be controlled since its occurrence compromises the operations in terms of safety (instability in the remaining slope; loosening rocks that increase the risk for operational people; an irregular free face for subsequent blasting); and costs (need for reinforcement of the remaining rock structure through costly sustainment systems; increase in concrete volumes in civil works).
This paper discusses in detail the design and field implementation of pre-split blasts successfully carried out to achieve clean vertical walls in moderately dipping, though complexly sheared and jointed gneiss.
Based on the results of the experiments, we were able to design a pre-splitting pattern both experimentally and in a very cost-effective manner.
It is felt that the methods developed on this project could have useful applications on other major construction projects.
 Doi: 10.
28991/CEJ-2023-09-03-05 Full Text: PDF.

Related Results

Study on the technology of enhancing permeability by deep hole presplitting blasting in Sanyuan coal mine
Study on the technology of enhancing permeability by deep hole presplitting blasting in Sanyuan coal mine
AbstractTo reduce gas disasters in low permeability and high gas coal seams and improve gas predrainage efficiency, conventional deep hole presplitting blasting permeability increa...
Design
Design
Conventional definitions of design rarely capture its reach into our everyday lives. The Design Council, for example, estimates that more than 2.5 million people use design-related...
Theoretical Analysis of Rock Blasting Damage in Construction of Tunnels Closely Under-Passing Sewage Box Culverts
Theoretical Analysis of Rock Blasting Damage in Construction of Tunnels Closely Under-Passing Sewage Box Culverts
With the large-scale construction of urban traffic tunnels in China, it has become common to underpass existing buildings and structures such as sewage box culverts and pipelines u...
Study on the Technology of Enhancing Permeability by Millisecond Blasting in Sanyuan Coal Mine
Study on the Technology of Enhancing Permeability by Millisecond Blasting in Sanyuan Coal Mine
To reduce gas disasters in low permeability and high-gas coal seams and improve gas predrainage efficiency, conventional deep-hole presplitting blasting permeability increasing tec...
Comparison and application of top and bottom air decks to improve blasting operations
Comparison and application of top and bottom air decks to improve blasting operations
<abstract> <p>The blasting operation is an integral part of mines, and it is still being used as the most economical tool to fragment and displace rock mass. Appropriat...
SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
The article describes run-of-the-river hydroelectric power plants. The authors specify the importance of performing technical and economic calculations in justifying the large-size...
EXPERIMENTAL AND NUMERICAL INVESTIGATION OF BLASTING-INDUCED GROUND VIBRATION FROM TUNNEL UNDERCROSSING A VILLAGE
EXPERIMENTAL AND NUMERICAL INVESTIGATION OF BLASTING-INDUCED GROUND VIBRATION FROM TUNNEL UNDERCROSSING A VILLAGE
To study the effect of blasting-induced vibration on ground buildings when tunnel undercrossing a village, a blasting vibration trial was carried out in Beizhuang tunnel in Henan P...
Liquid CO2 Phase Change Fracturing and Vibration Monitoring in Roadbed Slope Excavation
Liquid CO2 Phase Change Fracturing and Vibration Monitoring in Roadbed Slope Excavation
Abstract In order to analyze the vibration impact of carbon dioxide fracturing tube blasting red sandstone, combined with the engineering conditions and surrounding ...

Back to Top