Abstract With years of study and experiments, a complete series of Progressive Cavity Pump (PCP) products has been developed. Sets of down-hole pumps for various rates and lifting capacities were developed for water-flooding, polymer-flooding and ASP flooding areas according to the specifics. One of the newest techniques, a hollow rotor PC Pump, has been applied in more than 800 wells. It has proved to be an effective way in removing the wax build-up and reducing operation cost. Another specially designed product was the sucker rod. By strengthening and redesigning the area susceptible to failure, the new sucker rod prolonged the running life of the lifting systems considerably. Also, a new type of drive head with compact structure has been proved to be more convenient in maintenance and more economic than the traditional products. By means of completed monitoring techniques including PC Pump testing equipment and diagnosing software, PC Pump systems can be monitored in real time. This decreased the frequency of failures and improved the benefits effectively. With more than 2000 PCP wells in Daqing Oilfield, the capital and operating costs have reduced dramatically. The PCP system, the most effective lifting method, has great potential for Daqing's Oilfield. Background Daqing Oilfield lies in the center of Songliang basin in North east China. In the beginning stages, commingle water injection and separate zone water injection technologies were used which allowed the reservoir pressure to remain at a high level. Therefore, by natural power the oil field produced for nearly twenty years. To maintain the output, artificial lift technologies were used from 1980s. Beam pumping system was the most popular one. Up to the end of last century, the number of beam pumping systems in Daqing reached over 20,000 wells. There were also about 2,000 ESP wells in operation. In 2000, the average water cut for the whole oilfield reached nearly 90%. Huge operation cost was the most serious problem for beam pumping system. In 2002, the total power consumption of artificial lifting systems was nearly 10 billion kW ·h, which was over one third of the whole oil field's power consumption.
Title: The Successful Application of 2000 PCP Wells in Daqing Oilfield
Description:
Abstract With years of study and experiments, a complete series of Progressive Cavity Pump (PCP) products has been developed.
Sets of down-hole pumps for various rates and lifting capacities were developed for water-flooding, polymer-flooding and ASP flooding areas according to the specifics.
One of the newest techniques, a hollow rotor PC Pump, has been applied in more than 800 wells.
It has proved to be an effective way in removing the wax build-up and reducing operation cost.
Another specially designed product was the sucker rod.
By strengthening and redesigning the area susceptible to failure, the new sucker rod prolonged the running life of the lifting systems considerably.
Also, a new type of drive head with compact structure has been proved to be more convenient in maintenance and more economic than the traditional products.
By means of completed monitoring techniques including PC Pump testing equipment and diagnosing software, PC Pump systems can be monitored in real time.
This decreased the frequency of failures and improved the benefits effectively.
With more than 2000 PCP wells in Daqing Oilfield, the capital and operating costs have reduced dramatically.
The PCP system, the most effective lifting method, has great potential for Daqing's Oilfield.
Background Daqing Oilfield lies in the center of Songliang basin in North east China.
In the beginning stages, commingle water injection and separate zone water injection technologies were used which allowed the reservoir pressure to remain at a high level.
Therefore, by natural power the oil field produced for nearly twenty years.
To maintain the output, artificial lift technologies were used from 1980s.
Beam pumping system was the most popular one.
Up to the end of last century, the number of beam pumping systems in Daqing reached over 20,000 wells.
There were also about 2,000 ESP wells in operation.
In 2000, the average water cut for the whole oilfield reached nearly 90%.
Huge operation cost was the most serious problem for beam pumping system.
In 2002, the total power consumption of artificial lifting systems was nearly 10 billion kW ·h, which was over one third of the whole oil field's power consumption.

Related Results

Overview of PCP Lifting Technology Development in Daqing Oilfield
Overview of PCP Lifting Technology Development in Daqing Oilfield
Abstract This paper presented the development of Progressing Cavity Pump (PCP) technologies in Daqing Oilfield during the past 27 years, covering the successful expe...
The Development of PCP Wells Troubleshooting Technique in Daqing Oilfield
The Development of PCP Wells Troubleshooting Technique in Daqing Oilfield
Abstract Trouble-shooting technique is an important part in artificial lift technology. Based on wave equation created by Gibbs from 1970s, dynamometer card method h...
An Innovative PCP Logging Technique for the Separated Layer Production Wells
An Innovative PCP Logging Technique for the Separated Layer Production Wells
Abstract In the past 50 years, the oil production of Daqing Oilfield has maintained 50 million tons (near 350 million bbls) per year for 27 years. To date, Daqing Oi...
Successful Refracturing Enhances Oil Production in Horizontal Wells: A Case Study from Daqing Oilfield, China
Successful Refracturing Enhances Oil Production in Horizontal Wells: A Case Study from Daqing Oilfield, China
Abstract In recent years, hundreds of horizontal wells have been drilled with cemented casing completion in Daqing oilfield, China. Some of these wells in low per...
Smart Well Technology in Daqing Oil Field
Smart Well Technology in Daqing Oil Field
Abstract Daqing oilfield has entered the late period of extra high water production. With the development of horizontal well technology, coning of injected water is ...
Complexity Theory
Complexity Theory
The workshop Complexity Theory was organised by Joachim von zur Gathen (Bonn), Oded Goldreich (Rehovot), Claus-Peter Schnorr (Frankfurt), and Madhu Sudan ...
Impact of primary care providers on patient screening mammography and initial presentation in an underserved clinical setting.
Impact of primary care providers on patient screening mammography and initial presentation in an underserved clinical setting.
8 Background: Screening mammography (SM) is a routinely used modality for earlier detection of breast cancer and is effective in reducing breast cancer-related morbidity and morta...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...