TBM Performance, Prognosis and Risk Caused by Faulting
View through CrossRef
World records for drill-and-blast tunnelling from Norwegian contractors, bear witness to numerous weeks of more than 100m, and an exceptional 5.8 km in 54 weeks, also from one face. Earlier hard-rock world records using high-powered TBM in Norway, but most frequently and more recently, the records with Robbins TBM through non-abrasive limestones in the USA, provide numbers in meters per day, per week, and per month, which are of course, even more remarkable. Unfortunately there are contrary and undesirable TBM records, which are occasionally recurring events so not records, which see TBM stopped for months or even years in fault zones, or permanently buried in mountains. The many orders of magnitude range of performance suggest the need for better investigations, better choice of TBM, and better facilities for improving the ground ahead of TBM, when probe-drilling indicates that this is essential. Control of water, and improved stand-up behaviour in significant weakness zones and faults may demand drainage, which can be unending, and pre-injection. Fortunately there are increasing signs that this is recognized by TBM manufacturers: more guide-holes for drilling pre-injection umbrellas are seen through front-shields nowadays. A little acknowledged fact is that when all hours are included, TBM will generally decelerate as tunnel length and time increases. This is usually seen after improved performance during the learning curve. Deceleration is also a general trend during world-record setting performances. This means that utilization U is equal to the ratio of actual advance rate and penetration rate, AR/PR, only for specified time intervals, because U is time-dependent. This is rarely quantified by designers, and is therefore a source of risk, by default. Another important item for correct prognosis is the recognition that reduced penetration rate PR can sometimes occur when thrust is increased by the TBM operator, due to exceptionally resistant rock mass formations. Each of the above, and PR sensitivity to a wide range of cutter forces, UCS and abrasiveness, are provided in the empirical QTBM method. This method explains variable progress in jointed rock, which is sometimes fast, and also quantifies the likely delays in untreated, or pre-injected, fault zones.
Title: TBM Performance, Prognosis and Risk Caused by Faulting
Description:
World records for drill-and-blast tunnelling from Norwegian contractors, bear witness to numerous weeks of more than 100m, and an exceptional 5.
8 km in 54 weeks, also from one face.
Earlier hard-rock world records using high-powered TBM in Norway, but most frequently and more recently, the records with Robbins TBM through non-abrasive limestones in the USA, provide numbers in meters per day, per week, and per month, which are of course, even more remarkable.
Unfortunately there are contrary and undesirable TBM records, which are occasionally recurring events so not records, which see TBM stopped for months or even years in fault zones, or permanently buried in mountains.
The many orders of magnitude range of performance suggest the need for better investigations, better choice of TBM, and better facilities for improving the ground ahead of TBM, when probe-drilling indicates that this is essential.
Control of water, and improved stand-up behaviour in significant weakness zones and faults may demand drainage, which can be unending, and pre-injection.
Fortunately there are increasing signs that this is recognized by TBM manufacturers: more guide-holes for drilling pre-injection umbrellas are seen through front-shields nowadays.
A little acknowledged fact is that when all hours are included, TBM will generally decelerate as tunnel length and time increases.
This is usually seen after improved performance during the learning curve.
Deceleration is also a general trend during world-record setting performances.
This means that utilization U is equal to the ratio of actual advance rate and penetration rate, AR/PR, only for specified time intervals, because U is time-dependent.
This is rarely quantified by designers, and is therefore a source of risk, by default.
Another important item for correct prognosis is the recognition that reduced penetration rate PR can sometimes occur when thrust is increased by the TBM operator, due to exceptionally resistant rock mass formations.
Each of the above, and PR sensitivity to a wide range of cutter forces, UCS and abrasiveness, are provided in the empirical QTBM method.
This method explains variable progress in jointed rock, which is sometimes fast, and also quantifies the likely delays in untreated, or pre-injected, fault zones.
Related Results
BIM-based Quantitative Assessment Method of Tunnel Collapse Risk in TBM Construction
BIM-based Quantitative Assessment Method of Tunnel Collapse Risk in TBM Construction
Abstract
Tunnel risk assessment plays an important role in tunnel design, construction and tunnel safety risk control. TBM method is more and more widely used becaus...
Pemberdayaan Perempuan Melalui Taman Baca Masyarakat Wijaya Kusuma Sleman Yogyakarta
Pemberdayaan Perempuan Melalui Taman Baca Masyarakat Wijaya Kusuma Sleman Yogyakarta
Abstract
The increasing of woman life quality probably can be showed by GEM (Gender Empowerment Measurament) measured by woman participation in economic or politic aspect. In...
Role of vascular endothelial growth factor in tuberculous meningitis
Role of vascular endothelial growth factor in tuberculous meningitis
INTRODUCTION:
The status of vascular endothelial-derived growth factor (VEGF) in the pathogenesis of tuberculous meningitis (TBM) remains far from clear. We prospective...
Safety and environmental impact control of cross passage construction in soft soil strata using tunnel boring machine method
Safety and environmental impact control of cross passage construction in soft soil strata using tunnel boring machine method
Abstract
The Tianjin area is covered by soft, water-bearing silt and silty sand strata and has a high groundwater table. The excavation of a cross passage in this area enta...
Mechanical Aspects of Construction of New TBM Tunnel Under Existing Structures
Mechanical Aspects of Construction of New TBM Tunnel Under Existing Structures
AbstractIt is inevitable for the construction of subways to pass under the existing structures in the city; this will cause settlement of the existing structures and affect their s...
Study on optimization design and wear prediction of TBM cutter based on Standard Ga Algorithm
Study on optimization design and wear prediction of TBM cutter based on Standard Ga Algorithm
Abstract
In tunnel construction, the tunnel boring machine (TBM) emerged in the 1930s has found wide application in tunnel construction due to its high construction ...
Utilizing Tunnel Boring Machine (TBM)-Crushed Limestone as a Construction Material
Utilizing Tunnel Boring Machine (TBM)-Crushed Limestone as a Construction Material
Tunnel boring machine (TBM) materials are usually crushed powder obtained during tunnel excavations for subways and transportation networks. Huge quantities of crushed rock powder ...
Comparative Analysis of Complications in Meningitis Patient Tuberculous vs. Bacterial
Comparative Analysis of Complications in Meningitis Patient Tuberculous vs. Bacterial
Objective: This comparative analysis aims to evaluate the patterns of radiological complications in bacterial meningitis against those seen in tuberculous meningitis.
Materials an...