Analisis Risiko Keterlambatan pada Proyek Refractory di PT. BAR dengan Metode House of Risk
View through CrossRef
PT. BAR is a refractory material manufacturer and a provider of installation and repair services for industrial units such as boilers, furnaces, and dryers. In practice, the company faces problems with project delays that have an impact on operational cost inflation and decreased customer satisfaction. This study aims to identify the causes of project delays and formulate risk mitigation strategies systematically. The method used is the House of Risk (HOR), which consists of two stages of analysis. At the HOR-1 stage, risk event and risk agent identification is carried out, as well as the calculation of the Aggregate Risk Potential (ARP) value to determine the risk agent with the highest priority. Data were processed from 68 projects from October 2024 to March 2025, with the finding that 20 projects experienced delays and 19 projects experienced cost inflation exceeding the RAB. Furthermore, at the HOR-2 stage, five mitigation actions were prepared which were evaluated based on the ratio of effectiveness to the level of difficulty of implementation. The three main recommended mitigation actions are a maximum location survey of H-1, checking documents and equipment, and coordinating with users and vendors. As a form of implementation, a redesign of the project implementation flow was prepared that integrates mitigation actions into the actual work process, both for regular and sudden projects. The results of the study indicate that the designed mitigation can be applied applicatively and has the potential to increase the efficiency of implementation and control the risk of project delays preventively.
Title: Analisis Risiko Keterlambatan pada Proyek Refractory di PT. BAR dengan Metode House of Risk
Description:
PT.
BAR is a refractory material manufacturer and a provider of installation and repair services for industrial units such as boilers, furnaces, and dryers.
In practice, the company faces problems with project delays that have an impact on operational cost inflation and decreased customer satisfaction.
This study aims to identify the causes of project delays and formulate risk mitigation strategies systematically.
The method used is the House of Risk (HOR), which consists of two stages of analysis.
At the HOR-1 stage, risk event and risk agent identification is carried out, as well as the calculation of the Aggregate Risk Potential (ARP) value to determine the risk agent with the highest priority.
Data were processed from 68 projects from October 2024 to March 2025, with the finding that 20 projects experienced delays and 19 projects experienced cost inflation exceeding the RAB.
Furthermore, at the HOR-2 stage, five mitigation actions were prepared which were evaluated based on the ratio of effectiveness to the level of difficulty of implementation.
The three main recommended mitigation actions are a maximum location survey of H-1, checking documents and equipment, and coordinating with users and vendors.
As a form of implementation, a redesign of the project implementation flow was prepared that integrates mitigation actions into the actual work process, both for regular and sudden projects.
The results of the study indicate that the designed mitigation can be applied applicatively and has the potential to increase the efficiency of implementation and control the risk of project delays preventively.
Related Results
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
ANALISIS FAKTOR RISIKO TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI THE HIMANA CONDOTEL
ANALISIS FAKTOR RISIKO TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI THE HIMANA CONDOTEL
Salah satu masalah dalam kegiatan konstruksi adalah risiko keterlambatan proyek konstruksi. Proyek The Himana Condotel terjadi beberapa kendala yang mengakibatkan beberapa pelaksan...
ANALISIS FAKTOR-FAKTOR DOMINANMANAJEMEN RISIKO TERHADAP KINERJA KEUANGAN PROYEK TAHAP KONSTRUKSI
ANALISIS FAKTOR-FAKTOR DOMINANMANAJEMEN RISIKO TERHADAP KINERJA KEUANGAN PROYEK TAHAP KONSTRUKSI
Dalam setiap aktivitas proyek tentu mengandung unsur risiko, semakin komplek sebuah proyek semakin besarrisiko yang akan terjadi. Kurangnya perhatian terhadap manajemen risiko dapa...
Aplikasi Metode Earned Value Management Proyek Warehouse
Aplikasi Metode Earned Value Management Proyek Warehouse
Earned Value Management (EVM) adalah suatu pendekatan yang digunakan untuk mengukur dan mengelola kinerja proyek dengan membandingkan nilai sebenarnya yang telah dikerjakan dengan ...
IDENTIFIKASI FAKTOR-FAKTOR RISIKO PADA PROYEK INFRASTRUKTUR DASAR DAN FASILITAS UMUM PENUNJANG PARIWISATA DI PELABUHAN BENOA, BALI
IDENTIFIKASI FAKTOR-FAKTOR RISIKO PADA PROYEK INFRASTRUKTUR DASAR DAN FASILITAS UMUM PENUNJANG PARIWISATA DI PELABUHAN BENOA, BALI
Secara umum risiko pada proyek konstruksi dapat mempengaruhi tujuan proyek yaitu mempengaruhi biaya, mutu dan waktu. Dalam proyek konstruksi, faktor risiko merupakan kemungkinan ya...
FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA MASA PANDEMI
FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA MASA PANDEMI
Keterlambatan pekerjaan proyek konstruksi umumnya selalu membuat kerugian baik bagi owner maupun kontraktor, karena faktor dari keterlambatan ialah persoalan dan permasalahan tenta...
ANALISIS KETERLAMBATAN PEMBANGUNAN TOL DENGAN METODE STOKASTIK DAN MITIGASI RISIKO
ANALISIS KETERLAMBATAN PEMBANGUNAN TOL DENGAN METODE STOKASTIK DAN MITIGASI RISIKO
Berdasarkan informasi dari pihak kontraktor dan pemilikĀ proyek, didapat bahwa Pembangunan Jalan Tol ini mengalami keterlambatan yang signifikan dalam penyelesaiannya. Tujuan dari ...
Analisis Manajemen Risiko Pelaksanaan Proyek Konstruksi Bangunan Gedung di Kabupaten Garut
Analisis Manajemen Risiko Pelaksanaan Proyek Konstruksi Bangunan Gedung di Kabupaten Garut
Dalam setiap pelaksanaan pembangunan proyek konstruksi faktor-faktor risiko yang berasal dari dalam atau dari luar bisa saja terjadi. Dimana risiko-risiko yang terjadi kemungkinan ...