Metode Pelaksanaan Pekerjaan Bore Pile Jembatan Teluk Kendari
View through CrossRef
AbstractThe government continues to promote infrastructure development outside Java as an effort to equalize development, including Kendari City. This study aims to determine the implementation method, requirements and standards of bore pile work in the Kendari Bay Bridge project. The results of the research on the method of carrying out bore pile work on the Kendari Bay Bridge project include a series of preparations for casing bore pile erection, mobilization of bore pile steel casing, erection of bore pile steel casing, connection of bore pile steel casing, setting of RCD tools then drill bore pile points to the desired depth. specified on the plans, rebar installation, bore pile casting. Material requirements and standards used in bore piles for concrete use high-strength SCC (Self Compacting Concrete) concrete with a quality of fc 30 Mpa, by adding Retarder RD, Super Plastic SP and Fly Ash.AbstrakPengembangan infrastruktur di luar pulau Jawa terus digenjot pemerintah sebagai upaya pemerataan pembangunan, termasuk Kota Kendari. Penelitian ini bertujuan untuk mengetahui metode pelaksanaan, syarat dan standar pekerjaan bore pile di proyek Jembatan teluk Kendari. Hasil penelitian metode pelaksanaan pekerjaan bore pile pada proyek Jembatan Teluk Kendari antara lain rangkaian persiapan pemancangan casing bore pile, mobilisasi casing baja bore pile, pemancangan casing baja bore pile, penyambungan casing baja bore pile, setting alat RCD kemudian bor titik bore pile sampai kedalaman yang telah ditentukan pada gambar rencana, instalasi rebar, pengecoran bore pile. Syarat dan standar material yang dipakai pada bore pile untuk beton menggunakan beton mutu tinggi SCC (Self Compacting Concrete) dengan mutu fc 30 Mpa, dengan menambahkan Retarder RD, Super Plasitis SP dan Fly Ash.
Title: Metode Pelaksanaan Pekerjaan Bore Pile Jembatan Teluk Kendari
Description:
AbstractThe government continues to promote infrastructure development outside Java as an effort to equalize development, including Kendari City.
This study aims to determine the implementation method, requirements and standards of bore pile work in the Kendari Bay Bridge project.
The results of the research on the method of carrying out bore pile work on the Kendari Bay Bridge project include a series of preparations for casing bore pile erection, mobilization of bore pile steel casing, erection of bore pile steel casing, connection of bore pile steel casing, setting of RCD tools then drill bore pile points to the desired depth.
specified on the plans, rebar installation, bore pile casting.
Material requirements and standards used in bore piles for concrete use high-strength SCC (Self Compacting Concrete) concrete with a quality of fc 30 Mpa, by adding Retarder RD, Super Plastic SP and Fly Ash.
AbstrakPengembangan infrastruktur di luar pulau Jawa terus digenjot pemerintah sebagai upaya pemerataan pembangunan, termasuk Kota Kendari.
Penelitian ini bertujuan untuk mengetahui metode pelaksanaan, syarat dan standar pekerjaan bore pile di proyek Jembatan teluk Kendari.
Hasil penelitian metode pelaksanaan pekerjaan bore pile pada proyek Jembatan Teluk Kendari antara lain rangkaian persiapan pemancangan casing bore pile, mobilisasi casing baja bore pile, pemancangan casing baja bore pile, penyambungan casing baja bore pile, setting alat RCD kemudian bor titik bore pile sampai kedalaman yang telah ditentukan pada gambar rencana, instalasi rebar, pengecoran bore pile.
Syarat dan standar material yang dipakai pada bore pile untuk beton menggunakan beton mutu tinggi SCC (Self Compacting Concrete) dengan mutu fc 30 Mpa, dengan menambahkan Retarder RD, Super Plasitis SP dan Fly Ash.
Related Results
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
ABSTRACT
Present methods of pile group analysis are either limited to special geometric cases or do not consider pile-soil-pile interaction. An analytical procedu...
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
In order to investigate the influence of different diameters on pile end resistance, pile side resistance, pile axial force and pile force transmission law of jacked pile penetrati...
Anchor-PiIe Design for Ocean-FIoor Environments Using Finite-Element Analysis
Anchor-PiIe Design for Ocean-FIoor Environments Using Finite-Element Analysis
ABSTRACT
This paper analyzes some aspects of anchor-pile design for marine environments, using a finite-element mathematical model of the pile, soil, and the pile...
A New Mechanical Pile Connector Speeds Offshore Contruction Projects
A New Mechanical Pile Connector Speeds Offshore Contruction Projects
Abstract
During the past year, a new mechanical pile connector has been introduced to the offshore construction industry. This connector has been the culmination ...
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
ABSTRACTThe spiral heat exchanger of the energy pile groups is divided into multiple segments. Each heat exchanger segment is regarded as a three‐dimensional spiral heat source of ...
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
With the rapid development of urbanization and infrastructure construction, the requirements for the foundation design of high-rise buildings and large bridges are increasing. Pile...
Pile Driving Measurements On The Heather Platform Installation
Pile Driving Measurements On The Heather Platform Installation
Abstract
The first leg piles of the Heather Platform were instrumented using strain transducers and accelerometers that were attached to the pile just below its t...
A Comparative Study Between-Small Bore and Large Bore Tubes for Therapeutic Pleural Drainage
A Comparative Study Between-Small Bore and Large Bore Tubes for Therapeutic Pleural Drainage
Introduction: Pleural effusions due to various pulmonary and extra pulmonary causes are common clinical problems. Some pleural diseases require therapeutic pleurocentesis to decomp...