Improving Mooring Integrity through Standardized Inspection Practices – A DeepStar® 19403 Project

View through CrossRef
Abstract In-service inspection is a critical element in confirming the integrity of permanent floating production unit mooring systems. Over the unit's operating life, which will typically span 20 years or more, these inspections provide the majority of the condition information on the mooring components and overall system. This information enables operators to proactively address mooring issues caused by degradation mechanisms or deviations in mooring line tensions that could reduce the system capacity and potentially result in premature failure. However, detailed guidance on inspection intervals, and in particular inspection scope, is limited for permanent mooring systems. To address this identified industry need, the DeepStar® technology consortium initiated Project 19403, "Improving Mooring Integrity through Standardized Inspection and Fit-For-Service Assessment" to develop best inspection practice guidance for permanent mooring systems [1]. This paper describes the content and benefits of this new mooring inspection guidance document developed as part of the DeepStar® 19403 project [1] with the support of subject matter experts from major operator companies, Class societies and mooring consultancies. The paper will describe how this new guidance compliments and expands current industry Recommended Practice (RP) guidance. Key aspects related to in-service survey intervals, component inspection work scopes and inspection methods will be discussed as well as the execution planning of in-service mooring inspections. To facilitate inspection work, the predominate deterioration mechanisms are introduced which are corrosion, wear and fatigue. Other types of deteriorations are also summarized. Default in-service survey intervals (frequencies) and component inspections are recommended. In-service inspection methods are reviewed, from General Visual Inspection (GVI) and Close Visual Inspection (CVI) to advanced Non-Destructive Testing (NDT). Guidance on assessing the residual capacity of a damaged or flawed mooring component, known as fitness-for-service, is also covered within the new mooring inspection guidance.
Title: Improving Mooring Integrity through Standardized Inspection Practices – A DeepStar® 19403 Project
Description:
Abstract In-service inspection is a critical element in confirming the integrity of permanent floating production unit mooring systems.
Over the unit's operating life, which will typically span 20 years or more, these inspections provide the majority of the condition information on the mooring components and overall system.
This information enables operators to proactively address mooring issues caused by degradation mechanisms or deviations in mooring line tensions that could reduce the system capacity and potentially result in premature failure.
However, detailed guidance on inspection intervals, and in particular inspection scope, is limited for permanent mooring systems.
To address this identified industry need, the DeepStar® technology consortium initiated Project 19403, "Improving Mooring Integrity through Standardized Inspection and Fit-For-Service Assessment" to develop best inspection practice guidance for permanent mooring systems [1].
This paper describes the content and benefits of this new mooring inspection guidance document developed as part of the DeepStar® 19403 project [1] with the support of subject matter experts from major operator companies, Class societies and mooring consultancies.
The paper will describe how this new guidance compliments and expands current industry Recommended Practice (RP) guidance.
Key aspects related to in-service survey intervals, component inspection work scopes and inspection methods will be discussed as well as the execution planning of in-service mooring inspections.
To facilitate inspection work, the predominate deterioration mechanisms are introduced which are corrosion, wear and fatigue.
Other types of deteriorations are also summarized.
Default in-service survey intervals (frequencies) and component inspections are recommended.
In-service inspection methods are reviewed, from General Visual Inspection (GVI) and Close Visual Inspection (CVI) to advanced Non-Destructive Testing (NDT).
Guidance on assessing the residual capacity of a damaged or flawed mooring component, known as fitness-for-service, is also covered within the new mooring inspection guidance.

Related Results

Deepstar's Program Related to FPSO's
Deepstar's Program Related to FPSO's
Abstract Since Deep Star's inception in 1992, the Program has progressed from a $500,000 paper study of the feasibility of extended reach subsea tiebacks to focus...
Development of API RP 2SM for Synthetic Fiber Rope Moorings
Development of API RP 2SM for Synthetic Fiber Rope Moorings
Abstract The growth in deepwater application of synthetic fiber rope moorings has created a need for an industry design code for such mooring systems. American Pe...
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Abstract Mooring systems utilizing polyester ropes have facilitated exploration and production of deepwater fields and represent a step-change in mooring system d...
Dynamic Positioning in Single-Point Moorings
Dynamic Positioning in Single-Point Moorings
ABSTRACT This paper deals with the concept of and a system for complete control of the slowly varying bow motion of a bow-moored ship using dynamic positioning. ...
Mooring Integrity Management through Digital Twin and Standardized Inspection Data
Mooring Integrity Management through Digital Twin and Standardized Inspection Data
Abstract This paper presents a concept of a mooring digital twin frameworkand a standardized inspection datatemplate to enable digital twin. The mooring digital twin...
Reliability Centered Strategy for Mooring Integrity Management
Reliability Centered Strategy for Mooring Integrity Management
Abstract Petrobras has operated offshore production units on the Brazilian coast for over 25 years. Over time, its facilities are expected to degrade due to the vari...
Mooring Safety Assessment Using Reliability Techniques
Mooring Safety Assessment Using Reliability Techniques
ABSTRACT The paper deals with the reliability of offshore mooring systems. Reliability techniques have been applied to assess mooring systems designed by the quas...
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Compared with the traditional catenary or semi-taut mooring lines, the taut mooring system is more advantageous in many aspects, such as reduction of mooring line loads, erosion an...