Javascript must be enabled to continue!
Lead-Free Rework Experiences Using SAC
View through CrossRef
ABSTRACT
As companies transition over to lead-free assembly a certain amount of hand-soldering and rework will be performed. An article from Tech Search International last year did state that in Asia where lead-free soldering is much more common, hand-soldering was more of a production problem than lead-free SMT or wave soldering or other soldering processes.
In fact most user problem calls and requests for training these days are related to lead-free hand-soldering and rework. In many cases the assemblers are using materials from various solder suppliers with similar issues occurring in all cases. Often the problems are more than just material issues.
Switching to lead-free without proper preparation is not recommended. Although this seems easily understood some assemblers have attempted to transition without adequate training; resulting in line stoppages occurring only a few hours into lead-free hand-soldering. Operator complaints, loss of reliability and poor joint quality were experienced. This could be a production engineer’s nightmare but it need not be this way if the basic concepts of hand-soldering are revisited, some experience gained prior to the transition and adequate training of operators is performed before and after the switchover.
This paper is a compilation of questions often asked by assemblers in reference to hand-soldering with lead-free. These questions are in fact some of the issues addressed during lead-free hand-soldering on-site audits or training at assemblers using lead-free solders at their facilities. It offers practical answers as to enable the reliable implementation of lead-free.
Title: Lead-Free Rework Experiences Using SAC
Description:
ABSTRACT
As companies transition over to lead-free assembly a certain amount of hand-soldering and rework will be performed.
An article from Tech Search International last year did state that in Asia where lead-free soldering is much more common, hand-soldering was more of a production problem than lead-free SMT or wave soldering or other soldering processes.
In fact most user problem calls and requests for training these days are related to lead-free hand-soldering and rework.
In many cases the assemblers are using materials from various solder suppliers with similar issues occurring in all cases.
Often the problems are more than just material issues.
Switching to lead-free without proper preparation is not recommended.
Although this seems easily understood some assemblers have attempted to transition without adequate training; resulting in line stoppages occurring only a few hours into lead-free hand-soldering.
Operator complaints, loss of reliability and poor joint quality were experienced.
This could be a production engineer’s nightmare but it need not be this way if the basic concepts of hand-soldering are revisited, some experience gained prior to the transition and adequate training of operators is performed before and after the switchover.
This paper is a compilation of questions often asked by assemblers in reference to hand-soldering with lead-free.
These questions are in fact some of the issues addressed during lead-free hand-soldering on-site audits or training at assemblers using lead-free solders at their facilities.
It offers practical answers as to enable the reliable implementation of lead-free.
Related Results
Research on the rework risk core tasks in prefabricated construction in China
Research on the rework risk core tasks in prefabricated construction in China
PurposeThe purpose of this paper is to assess the process of prefabricated construction (PC) and analyze the impacts of rework risk to identify the core tasks for which the rework ...
ANALISIS PEKERJAAN YANG MENGALAMI REWORK PADA PROYEK PERUMAHAN DI BANDUNG
ANALISIS PEKERJAAN YANG MENGALAMI REWORK PADA PROYEK PERUMAHAN DI BANDUNG
AbstrakKebutuhan rumah pada tahun 2013 mencapai 12 juta unit, sedangkan suplai produksi rumah hanya 250.000 - 400.000 unit/tahun dan ada sekitar 900.000 rumah tangga baru per tahun...
Cooperative Planning, Uncertainty and Managerial Control in Concurrent Design
Cooperative Planning, Uncertainty and Managerial Control in Concurrent Design
We examine whether cooperative planning and uncertainty affect the magnitude of rework in concurrent engineering projects with upstream and downstream operations, and explore the i...
An ultrasonographic study to evaluate the correlation of calcified yolk sac with spontaneous abortion
An ultrasonographic study to evaluate the correlation of calcified yolk sac with spontaneous abortion
Background: The yolk sac is a small, membranous structure, which is situated outside the embryo and has a variety of functions during embryonic development. The yolk sac plays an i...
Surgical outcomes for spinal arachnoid cysts and webs: a case series
Surgical outcomes for spinal arachnoid cysts and webs: a case series
Abstract
Background
Spinal arachnoid cysts (SAC) and spinal arachnoid webs (SAW) are intradural pathologies, often presenting with pain and/or my...
ANALISIS FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONTRUKSI JALAN KOTA PADANG
ANALISIS FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONTRUKSI JALAN KOTA PADANG
Rework is a repeat job that is caused by an error from a construction project. In a construction activity almost always happens rework only the quantity is different. The purpose o...
Prognostic Significance of Aneurysm Sac Shrinkage After Endovascular Aneurysm Repair
Prognostic Significance of Aneurysm Sac Shrinkage After Endovascular Aneurysm Repair
Purpose: To investigate whether patients who develop aneurysm sac shrinkage following endovascular aneurysm repair (EVAR) have better outcomes than patients with a stable or increa...
`Low Melting Alloys: A New Solution to Lead Free Rework Process Issues
`Low Melting Alloys: A New Solution to Lead Free Rework Process Issues
ABSTRACT
Different BGA packages with SAC (Sn-Ag-Cu) 405 balls were assembled on several Printed Circuit Board (PCB) test vehicle designs using no clean SAC 405 pa...

