Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Cooperative Planning, Uncertainty and Managerial Control in Concurrent Design

View through CrossRef
We examine whether cooperative planning and uncertainty affect the magnitude of rework in concurrent engineering projects with upstream and downstream operations, and explore the impact of such rework on project delays. Using survey data from a sample of 120 business process (BP) redesign and related information technology (IT) development projects in healthcare and telecommunications, our results indicate that upstream (BP) rework and downstream (IT) rework is mediated and mitigated by cooperative planning through upstream/downstream strategy coupling and cross-functional involvement. In addition, uncertainty related to a lack of firm or industry experience with such projects increases the magnitude of upstream rework but not downstream rework or the amount of cooperative planning. After accounting for project scope, implementation horizon and whether delays are anticipated, we find that project delay is primarily influenced by the magnitude of downstream rework and downstream delay: the magnitude of both upstream and downstream rework significantly increases downstream delay, which significantly increases project delay. However, the magnitude of upstream rework does not directly affect project delay. These results suggest that project delay is under managerial control as cooperative planning is a managerial function that reduces downstream rework, while uncertainty from a lack of experience with the design affecting upstream rework is not directly under managerial control.
Title: Cooperative Planning, Uncertainty and Managerial Control in Concurrent Design
Description:
We examine whether cooperative planning and uncertainty affect the magnitude of rework in concurrent engineering projects with upstream and downstream operations, and explore the impact of such rework on project delays.
Using survey data from a sample of 120 business process (BP) redesign and related information technology (IT) development projects in healthcare and telecommunications, our results indicate that upstream (BP) rework and downstream (IT) rework is mediated and mitigated by cooperative planning through upstream/downstream strategy coupling and cross-functional involvement.
In addition, uncertainty related to a lack of firm or industry experience with such projects increases the magnitude of upstream rework but not downstream rework or the amount of cooperative planning.
After accounting for project scope, implementation horizon and whether delays are anticipated, we find that project delay is primarily influenced by the magnitude of downstream rework and downstream delay: the magnitude of both upstream and downstream rework significantly increases downstream delay, which significantly increases project delay.
However, the magnitude of upstream rework does not directly affect project delay.
These results suggest that project delay is under managerial control as cooperative planning is a managerial function that reduces downstream rework, while uncertainty from a lack of experience with the design affecting upstream rework is not directly under managerial control.

Related Results

New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
This reference is for an abstract only. A full paper was not submitted for this conference. Abstract 1 Int...
Reserves Uncertainty Calculation Accounting for Parameter Uncertainty
Reserves Uncertainty Calculation Accounting for Parameter Uncertainty
Abstract An important goal of geostatistical modeling is to assess output uncertainty after processing realizations through a transfer function, in particular, to...
The uncertainty–investment relationship: scrutinizing the role of firm size
The uncertainty–investment relationship: scrutinizing the role of firm size
PurposeThe objective of this paper is threefold. First, it aims to empirically study whether firm-specific/idiosyncratic uncertainty, macroeconomic/aggregate uncertainty and politi...
Design
Design
Conventional definitions of design rarely capture its reach into our everyday lives. The Design Council, for example, estimates that more than 2.5 million people use design-related...
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Purpose To provide high torques needed to move a robot’s links, electric actuators are followed by a transmission system with a high transmission rate. For instance, gear ratios of...
Pembelajaran Matematika dengan Pendekatan Cooperative Learning Ditinjau dari Prestasi Belajar, Motivasi, dan Akhlak Mulia Siswa
Pembelajaran Matematika dengan Pendekatan Cooperative Learning Ditinjau dari Prestasi Belajar, Motivasi, dan Akhlak Mulia Siswa
Penelitian ini bertujuan untuk mendeskripsikan keefektifan pembelajaran matematika dengan pendekatan cooperative learning tipe Student Teams-Achievement Divisions (STAD) dan cooper...
Concurrent Systems Design
Concurrent Systems Design
Abstract A characteristic of all concurrent systems is that of concurrent processing; that is, many activities occurring simultaneously whereby, frequently, the order of ...

Back to Top