Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Global Buckling of a Pre-Pressurized Flexible Flowline

View through CrossRef
For the protection from object drop/fishing trawl impact, flexible flowline is normally trenched or rock-dumped. And hence, upheaval buckling is promoted by the elevated temperatures and high pressures. In order to reduce the rock cover requirement for mitigation of upheaval buckling, rock-dumping or trenching while the flexible pipe are pressurized has been performed successfully in several north sea projects. The temperature and pressure induced elongation of flexible pipe are design dependent. For high pressure flexible flowline, the pressure expansion is significantly higher than conventional rigid pipelines. Due to the low bending stiffness and high pressure expansion, a flexible flowline will buckle laterally when it is pre-pressurized in hydro-test before trenching or rock-dumping. As a consequence, lateral imperfections are induced and will be kept after trenching or rock-dumping due to lateral resistance and bending stress relaxation of the flowline. In these locations, the flowline tends to deform laterally in operating. On the other hand, when the flowline is de-pressurized after trenching or rock-dumping the contraction of the flowline is restrained by the surrounding soils or rocks, and hence axial tension force can be obtained. When the flowline starts to operate, this tensile force will neutralize part of the compressive axial force, and therefore the required upheaval resistance is reduced. In this paper, global buckling of a pre-pressurized flexible flowline has been studied, and the influence on the requirement of rock covers is presented.
Title: Global Buckling of a Pre-Pressurized Flexible Flowline
Description:
For the protection from object drop/fishing trawl impact, flexible flowline is normally trenched or rock-dumped.
And hence, upheaval buckling is promoted by the elevated temperatures and high pressures.
In order to reduce the rock cover requirement for mitigation of upheaval buckling, rock-dumping or trenching while the flexible pipe are pressurized has been performed successfully in several north sea projects.
The temperature and pressure induced elongation of flexible pipe are design dependent.
For high pressure flexible flowline, the pressure expansion is significantly higher than conventional rigid pipelines.
Due to the low bending stiffness and high pressure expansion, a flexible flowline will buckle laterally when it is pre-pressurized in hydro-test before trenching or rock-dumping.
As a consequence, lateral imperfections are induced and will be kept after trenching or rock-dumping due to lateral resistance and bending stress relaxation of the flowline.
In these locations, the flowline tends to deform laterally in operating.
On the other hand, when the flowline is de-pressurized after trenching or rock-dumping the contraction of the flowline is restrained by the surrounding soils or rocks, and hence axial tension force can be obtained.
When the flowline starts to operate, this tensile force will neutralize part of the compressive axial force, and therefore the required upheaval resistance is reduced.
In this paper, global buckling of a pre-pressurized flexible flowline has been studied, and the influence on the requirement of rock covers is presented.

Related Results

Combined Effect of Flowline Walking and Riser Dynamic Loads on HP/HT Flowline Design
Combined Effect of Flowline Walking and Riser Dynamic Loads on HP/HT Flowline Design
Abstract Some high pressure, high temperature (HPHT) flowlines have experienced a gradual, overall axial displacement over a number of heating/cooling cycles. Thi...
Experimental Study Of Curvature And Frictional Effects On Buckling
Experimental Study Of Curvature And Frictional Effects On Buckling
ABSTRACT Buckling and post-buckling lock-up place a limit on the reach of extended-reach and horizontal wells. Although buckling has received considerable theoret...
Remediation of A Complex Blockage for Gumusut-Kakap Subsea Flexible Flowline from a System Perspective
Remediation of A Complex Blockage for Gumusut-Kakap Subsea Flexible Flowline from a System Perspective
Abstract A subsea production flexible flowline in Gumusut-Kakap field was found blocked in March 2021 during a routine production well-flowline switching/alignment o...
Innovative Way of Improving S1 Production and Operation Using Real-Time Flowline Simulations of S1 Flowline Networks
Innovative Way of Improving S1 Production and Operation Using Real-Time Flowline Simulations of S1 Flowline Networks
Abstract It is always a challenge of legacy oil field to optimize the production with complex flowline network. Greater Sirikit (S1) oil field is operating with 400 ...
Buckling Analysis in Creep Conditions: Review and Comparison
Buckling Analysis in Creep Conditions: Review and Comparison
In the case of structures operating at high temperature in normal or accidental conditions, the influence of creep has to be considered at the design stage because this phenomenon ...
Low Cycle Fatigue in HP/HT Flowlines
Low Cycle Fatigue in HP/HT Flowlines
Abstract This paper presents two design methods and example analysis results for low cycle fatigue design of HP/HT flowlines. The first method is based on fatigue...
Design Of Insulated Flowlines For Mobile Bay
Design Of Insulated Flowlines For Mobile Bay
ABSTRACT Insulated CRA flowlines are used in Mobile Bay for connecting well templates to host processing platforms. This paper describes the design of the flowlin...
Wax-On, Wax-Off: Understanding and Mitigating Wax Deposition in a Deepwater Subsea Gas/Condensate Flowline
Wax-On, Wax-Off: Understanding and Mitigating Wax Deposition in a Deepwater Subsea Gas/Condensate Flowline
Abstract The subsea Coulomb field is a two-well gas/condensate development in 7500 fsw, tied back to the NaKika platform in the Gulf of Mexico via a single 27-mil...

Back to Top