Joint Rapid Airfield Construction (JRAC) Program 2004 Demonstration Project--Fort Bragg, North Carolina

View through CrossRef
This report describes the demonstration of technologies and procedures developed during April 2002 and May 2004 under the Joint Rapid Airfield Construction (JRAC) Program. The demonstration took place at Sicily Landing Zone (LZ) at Fort Bragg, NC, in July of 2004. The objective of the exercise was to demonstrate the procedures and technologies developed under the JRAC Program by rapidly building two parking aprons capable of supporting C-130 transport aircraft taxiing and parking operations. The exercise was conducted under continuous 24-hr operations to simulate a real-world rapid construction environment. Apron 1 (north apron) was constructed using two technologies, one-half being ACE™ Matting and the other half being a cement-polymer stabilized soil surface. Apron 2 (south apron) was constructed solely of a fiber-cement-stabilized soil system. Both aprons were treated with a polymer emulsion surface application to form a sealed surface against abrasion and water infiltration. The entire construction of both aprons required 76 hr, with Apron 1 finished in 48 hr. The construction of Apron 1 was validated by operation of a C-130 aircraft approximately 31 hr after completion with success and high praises from the aircraft flight crew on the stability and surface of the apron, as well as its dust-abating characteristics.
Title: Joint Rapid Airfield Construction (JRAC) Program 2004 Demonstration Project--Fort Bragg, North Carolina
Description:
This report describes the demonstration of technologies and procedures developed during April 2002 and May 2004 under the Joint Rapid Airfield Construction (JRAC) Program.
The demonstration took place at Sicily Landing Zone (LZ) at Fort Bragg, NC, in July of 2004.
The objective of the exercise was to demonstrate the procedures and technologies developed under the JRAC Program by rapidly building two parking aprons capable of supporting C-130 transport aircraft taxiing and parking operations.
The exercise was conducted under continuous 24-hr operations to simulate a real-world rapid construction environment.
Apron 1 (north apron) was constructed using two technologies, one-half being ACE™ Matting and the other half being a cement-polymer stabilized soil surface.
Apron 2 (south apron) was constructed solely of a fiber-cement-stabilized soil system.
Both aprons were treated with a polymer emulsion surface application to form a sealed surface against abrasion and water infiltration.
The entire construction of both aprons required 76 hr, with Apron 1 finished in 48 hr.
The construction of Apron 1 was validated by operation of a C-130 aircraft approximately 31 hr after completion with success and high praises from the aircraft flight crew on the stability and surface of the apron, as well as its dust-abating characteristics.

Related Results

ANALISIS KINERJA UPS (UNINTERRUPTIBLE POWER SUPPLY) BEBAN GEDUNG TERMINAL DENGAN BEBAN AIRFIELD LIGHTING SYSTEM
ANALISIS KINERJA UPS (UNINTERRUPTIBLE POWER SUPPLY) BEBAN GEDUNG TERMINAL DENGAN BEBAN AIRFIELD LIGHTING SYSTEM
UPS (Uninterruptible Power Supply) memberi daya sementara ketika daya utama mengalami kegagalan sehingga beban tidak mengalami pemadaman. UPS sangat dibutuhkan pada perusahaan agar...
State of the practice in pavement structural design/analysis codes relevant to airfield pavement design
State of the practice in pavement structural design/analysis codes relevant to airfield pavement design
An airfield pavement structure is designed to support aircraft live loads for a specified pavement design life. Computer codes are available to assist the engineer in designing an ...
Alleviating conflicts between army training and endangered species at fort bragg
Alleviating conflicts between army training and endangered species at fort bragg
AbstractThe second‐largest endangered red‐cockaded woodpecker (Piciodes borealis) (RCW) population in the world is located in the Sandhills physiographic region of North Carolina. ...
Differential Diagnosis of Neurogenic Thoracic Outlet Syndrome: A Review
Differential Diagnosis of Neurogenic Thoracic Outlet Syndrome: A Review
Abstract Thoracic outlet syndrome (TOS) is a complex and often overlooked condition caused by the compression of neurovascular structures as they pass through the thoracic outlet. ...
SU‐E‐T‐161: SOBP Beam Analysis Using Light Output of Scintillation Plate Acquired by CCD Camera
SU‐E‐T‐161: SOBP Beam Analysis Using Light Output of Scintillation Plate Acquired by CCD Camera
Purpose: To analyze Bragg‐peak beams in SOBP (spread‐out Bragg‐peak) beam using CCD (charge‐coupled device) camera ‐ scintillation screen system. We separated each Bragg‐peak beam ...
Evaluation of geocell-reinforced backfill for airfield pavement repair
Evaluation of geocell-reinforced backfill for airfield pavement repair
After an airfield has been attacked, temporary airfield pavement repairs should be accomplished quickly to restore flight operations. Often, the repairs are made with inadequate ma...
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
Cash flow calculation is an essential economic aspect of evaluating the success of a construction project. Strong cash flow positively impacts not only project effectiveness but al...
Efektivitas Program Pemerintah Kawasan Rumah Pangan Lestari (KRPL) terhadap Pola Pangan Harapan Rumah Tangga di Kota Banda Aceh
Efektivitas Program Pemerintah Kawasan Rumah Pangan Lestari (KRPL) terhadap Pola Pangan Harapan Rumah Tangga di Kota Banda Aceh
Abstrak. Dalam rangka mewujudkan kemandirian pangan, kementerian pertanian melalui Badan Litbang Pertanian mengembangkan Kawasan Rumah Pangan Lestari atau yang disebut dengan KRPL,...

Back to Top