Vito Project: Vito Field Development
View through CrossRef
Abstract
The Vito field is located in 4,100 feet of water producing from reservoirs nearly 30,000 feet below sea level. Vito was discovered in 2009 approximately 135 miles southwest of New Orleans, Louisiana. The project underwent major field development strategy change to remain competitive in 2015 oil price environment and price resiliency going forward.
The Vito project was seen as a strategic fit to the operator's existing Mars Corridor. The original Vito development strategy was to build a clone of the mega-project of Appomattox to maximize Net Present Value and Ultimate Recovery. However, as the market changed vastly in 2015, the project team refreshed the design concept to focus on capital efficiency.
This paper provides an overview of the overall revised Field Development Concept of Vito. Vito has best in class resource density when compared to other Gulf of Mexico fields, which allows for a compact field development of 8 subsea wells at a single drill center. This allowed the project to not include a drilling rig on the host platform and instead deploy a new generation Deepwater rig for drilling and completions. There is severe depletion drilling risk on Vito which led the project to drill and complete all 8 wells prior to first oil. To improve ultimate recovery with low capital efficiency in well bore gas lift was included in the design. In addition, the Mars Corridor export system was looked at and required debottlenecking on both the oil and gas side.
This paper is part of a Vito Project series at OTC 2023, and the other papers are listed in the references.
Title: Vito Project: Vito Field Development
Description:
Abstract
The Vito field is located in 4,100 feet of water producing from reservoirs nearly 30,000 feet below sea level.
Vito was discovered in 2009 approximately 135 miles southwest of New Orleans, Louisiana.
The project underwent major field development strategy change to remain competitive in 2015 oil price environment and price resiliency going forward.
The Vito project was seen as a strategic fit to the operator's existing Mars Corridor.
The original Vito development strategy was to build a clone of the mega-project of Appomattox to maximize Net Present Value and Ultimate Recovery.
However, as the market changed vastly in 2015, the project team refreshed the design concept to focus on capital efficiency.
This paper provides an overview of the overall revised Field Development Concept of Vito.
Vito has best in class resource density when compared to other Gulf of Mexico fields, which allows for a compact field development of 8 subsea wells at a single drill center.
This allowed the project to not include a drilling rig on the host platform and instead deploy a new generation Deepwater rig for drilling and completions.
There is severe depletion drilling risk on Vito which led the project to drill and complete all 8 wells prior to first oil.
To improve ultimate recovery with low capital efficiency in well bore gas lift was included in the design.
In addition, the Mars Corridor export system was looked at and required debottlenecking on both the oil and gas side.
This paper is part of a Vito Project series at OTC 2023, and the other papers are listed in the references.
Related Results
Vito After
Vito After
Distributed by DreamSlate Productions, 90 Meadowbrook Rd., Syosset, NY 11791; 516-729-7455Produced by DreamSlate ProductionsDirected by Maria Pusateri2006, DVD, color, 50 min.
If y...
Woningcorporaties en Vastgoedontwikkeling
Woningcorporaties en Vastgoedontwikkeling
This summary highlights the findings of the PhD-thesis ‘Woningcorporaties en Vastgoedontwikkeling: Fit for Use’ (‘Housing associations and Real Estate Development: Fit for Use?’). ...
Vito Project: Host Construction and Commissioning
Vito Project: Host Construction and Commissioning
Abstract
In 2009, the Vito field was discovered in more than 1,200 m of water approximately 240 km offshore from New Orleans, Louisiana in the Gulf of Mexico (GoM). ...
Prediction Project Task Completion Using Supervised Machine Learning Method: A Conceptual Approach
Prediction Project Task Completion Using Supervised Machine Learning Method: A Conceptual Approach
Project schedule forecasting is a core enabler of successful project management. Accurate schedule prediction leads to better resource management and ultimately, more value gained ...
The Paradigm of the Iron Triangle
The Paradigm of the Iron Triangle
Background and Originality: The project triangle, also named as the triple constraint, iron triangle, golden triangle, and agile triangle, is a central concept in project managemen...
An Examination of Project Software Utilization on Project Completion: Case Study of Smart Zambia
An Examination of Project Software Utilization on Project Completion: Case Study of Smart Zambia
Project management is a complex undertaking that requires proper planning and management. The study aimed at examining of project software utilization on project completion and it ...
Project success and project team management: Evidence from capital projects in the process industries
Project success and project team management: Evidence from capital projects in the process industries
AbstractEfficient project execution is a key business objective in many domains and particularly so for capital projects in the process industries, but existing project management ...
Application of Mitigation Hierarchy During the Development Phase of Tilenga Project, Uganda
Application of Mitigation Hierarchy During the Development Phase of Tilenga Project, Uganda
Abstract
The Tilenga project operated by TotalEnergies Exploration and Production Uganda, is an onshore oil project located in the Lake Albert Basin of Uganda. The p...