Javascript must be enabled to continue!
The ultimate prediction uncertainty in the chain-ladder model of Mack: Some new developments
View through CrossRef
We derive in a straightforward manner and through a unified framework the main known results related to the estimation of the ultimate prediction uncertainty within the famous Mack's distribution-free chain-ladder model, specifically, the Mack and BBMW formulas, and explain the deviation between the two formulas in terms of the applied estimation principles. <br>We demonstrate that by applying a well-defined estimation principle to estimate the quadratic difference <br>between the estimated and true development factors, the BBMW formula can be derived without using the conditional resampling approach. <br>Moreover, we underline that none of the estimators are unbiased for estimating the true uncertainty. Furthermore, even if the Mack estimator can be proved to be (slightly) less overestimated (on average, given the first triangle column) than the BBMW estimator, for each and any claims development triangle, the Mack formula does not provide the most accurate estimate. <br>By applying an enhanced estimation principle, we derive a novel formula to quantify the ultimate prediction uncertainty, which can be proved to be unbiased (conditionally given the first triangle column) under some harmless additional assumptions. <br>However, this novel estimator, as well as the Mack and BBMW formulas, can materially fail to estimate the true uncertainty.
Title: The ultimate prediction uncertainty in the chain-ladder model of Mack: Some new developments
Description:
We derive in a straightforward manner and through a unified framework the main known results related to the estimation of the ultimate prediction uncertainty within the famous Mack's distribution-free chain-ladder model, specifically, the Mack and BBMW formulas, and explain the deviation between the two formulas in terms of the applied estimation principles.
<br>We demonstrate that by applying a well-defined estimation principle to estimate the quadratic difference <br>between the estimated and true development factors, the BBMW formula can be derived without using the conditional resampling approach.
<br>Moreover, we underline that none of the estimators are unbiased for estimating the true uncertainty.
Furthermore, even if the Mack estimator can be proved to be (slightly) less overestimated (on average, given the first triangle column) than the BBMW estimator, for each and any claims development triangle, the Mack formula does not provide the most accurate estimate.
<br>By applying an enhanced estimation principle, we derive a novel formula to quantify the ultimate prediction uncertainty, which can be proved to be unbiased (conditionally given the first triangle column) under some harmless additional assumptions.
<br>However, this novel estimator, as well as the Mack and BBMW formulas, can materially fail to estimate the true uncertainty.
Related Results
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
This reference is for an abstract only. A full paper was not submitted for this conference.
Abstract
1 Int...
Reserves Uncertainty Calculation Accounting for Parameter Uncertainty
Reserves Uncertainty Calculation Accounting for Parameter Uncertainty
Abstract
An important goal of geostatistical modeling is to assess output uncertainty after processing realizations through a transfer function, in particular, to...
Integrated Foundation and Structural Reliability Analysis of a North Sea Structure
Integrated Foundation and Structural Reliability Analysis of a North Sea Structure
ABSTRACT
In cases where the reliability of fixed offshore structures in extreme storms is influenced by both structural and foundation failure, appropriate interp...
The uncertainty–investment relationship: scrutinizing the role of firm size
The uncertainty–investment relationship: scrutinizing the role of firm size
PurposeThe objective of this paper is threefold. First, it aims to empirically study whether firm-specific/idiosyncratic uncertainty, macroeconomic/aggregate uncertainty and politi...
Soluble Graphene Nanoarchitectures
Soluble Graphene Nanoarchitectures
In this Cheminar, we will delve into the latest research advancements in the organic synthesis, characterization, and application of soluble graphene nanoarchitectures. The discuss...
Perbedaan pengaruh latihan ladder drill speed run dan ladder drill crossover terhadap peningkatan kelincahan (agility) siswa Sekolah Dasar Moh. Hatta Kota Malang
Perbedaan pengaruh latihan ladder drill speed run dan ladder drill crossover terhadap peningkatan kelincahan (agility) siswa Sekolah Dasar Moh. Hatta Kota Malang
Tujuan dari penelitian ini adalah untuk menganalisis tentang: (1) pengaruh latihan <em>Ladder Drill Speed Run </em>terhadap kelincahan (<em>agility</em>); (...
Unification of Stochastic Reserving Models
Unification of Stochastic Reserving Models
In their daily reserving tasks, general insurance actuaries often use a mix of chain-ladder, Bornhuetter-Ferguson and Cape-Cod methods to estimate the ultimate reserve amounts. The...
Unification of Stochastic Reserving Models Using Individual Claims Information
Unification of Stochastic Reserving Models Using Individual Claims Information
In their daily reserving tasks, general insurance actuaries often use a mix of chain ladder, Bornhuetter-Ferguson, and Cape Cod methods to estimate the ultimate reserve amounts. Th...

