Javascript must be enabled to continue!
Analisis Dan Usulan Perencanaan Tata Letak Pabrik Bagian Produksi Menggunakan Metode Systematic Layout Planning (SLP) Di PT.ABC
View through CrossRef
Good factory layout planning is one of the factors that can increase company productivity. Layout is a facility design, layout analysis, concept formation, as well as the embodiment of the system for making goods or services. Applying a good layout in a company can cut the time needed in a production process and also reduce the energy that must be expended by workers. This research was conducted at PT. ABC is part of the Drivetrain Unit Department located in the Bukit Indah City Industrial Area, Purwakarta, West Java. The object to be observed is the layout of the factory for the production of single part trunnion which is devoted to the seat trunnion sub-component. The research method used is quantitative method. Data processing used to solve problems at PT. ABC uses the Systematic Layout Planning (SLP) Method approach. The goal is to be able to optimize the existing layout and increase the efficiency and effectiveness of the productivity of the company's performance. The conclusion is that the current condition of the factory layout is quite effective because it can produce one trunnion product faster than the predetermined takt time. However, there are still some improvements in the layout of the factory and the production process. Researchers try to provide suggestions for the layout of the new factory and its production process. The result is that the suggested layout has a time that is 94 seconds faster than before.
Keywords: Layout, Production, Productivity, Systematic Layout Planning
Universitas Tulang Bawang Lampung
Title: Analisis Dan Usulan Perencanaan Tata Letak Pabrik Bagian Produksi Menggunakan Metode Systematic Layout Planning (SLP) Di PT.ABC
Description:
Good factory layout planning is one of the factors that can increase company productivity.
Layout is a facility design, layout analysis, concept formation, as well as the embodiment of the system for making goods or services.
Applying a good layout in a company can cut the time needed in a production process and also reduce the energy that must be expended by workers.
This research was conducted at PT.
ABC is part of the Drivetrain Unit Department located in the Bukit Indah City Industrial Area, Purwakarta, West Java.
The object to be observed is the layout of the factory for the production of single part trunnion which is devoted to the seat trunnion sub-component.
The research method used is quantitative method.
Data processing used to solve problems at PT.
ABC uses the Systematic Layout Planning (SLP) Method approach.
The goal is to be able to optimize the existing layout and increase the efficiency and effectiveness of the productivity of the company's performance.
The conclusion is that the current condition of the factory layout is quite effective because it can produce one trunnion product faster than the predetermined takt time.
However, there are still some improvements in the layout of the factory and the production process.
Researchers try to provide suggestions for the layout of the new factory and its production process.
The result is that the suggested layout has a time that is 94 seconds faster than before.
Keywords: Layout, Production, Productivity, Systematic Layout Planning.
Related Results
Perancangan Tata Letak Gudang Berdasarkan Volume Penyimpanan Bahan Baku dengan Metode Corelap (Studi Kasus: CV Sri Rezeki)
Perancangan Tata Letak Gudang Berdasarkan Volume Penyimpanan Bahan Baku dengan Metode Corelap (Studi Kasus: CV Sri Rezeki)
Abstract. The focus of this paper is on the storage of bread raw materials in warehouses. Based on the results of observations and interviews. In the current storage of raw materia...
Perancangan Tata Letak Fasilitas Metode CRAFT (Computerized Relative Allocation Facility Technique)
Perancangan Tata Letak Fasilitas Metode CRAFT (Computerized Relative Allocation Facility Technique)
Abstract. The layout of production facilities is a crucial factor in supporting the smooth operation of manufacturing processes. CV. XYZ faces issues related to inefficient facilit...
Perancangan Tata Letak Fasilitas Produksi Pengecoran Logam di UKM Logam
Perancangan Tata Letak Fasilitas Produksi Pengecoran Logam di UKM Logam
Tata letak fasilitas merupakan salah satu hal yang menunjang kelancaran kerja suatu perusahaan. Tata letak fasilitas yang baik dapat memperlancar proses produksi dan mencegah terja...
Simulasi Perbaikan Tata Letak Lantai Produksi Untuk Meningkatkan Output Produksi Tas pada PT. TIJ
Simulasi Perbaikan Tata Letak Lantai Produksi Untuk Meningkatkan Output Produksi Tas pada PT. TIJ
Intisari— PT. TIJ adalah perusahaan yang memproduksi tas wanita. Salah satu hasil produksi dengan permintaan yang tinggi adalah tas yang dipasarkan dengan merk jual LC. Permasalaha...
The Canberra Bubble
The Canberra Bubble
According to the ABC television program Four Corners, “Parliament House in Canberra is a hotbed of political intrigue and high tension … . It’s known as the ‘Canberra Bubble’ and i...
Analisis Tata Letak Fasilitas Pabrik Pengolahan Kopi Menggunakan Systematic Layout Planning
Analisis Tata Letak Fasilitas Pabrik Pengolahan Kopi Menggunakan Systematic Layout Planning
Abstrak. Penelitian ini bertujuan menganalisis tata letak fasilitas pabrik kopimenggunakan Systematic Layout Planning (SLP). Penelitian dilakukan pada pabrik pengolahan kopi arabik...
USULAN TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING
USULAN TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING
Perancangan tata letak fasilitas merupakan suatu hal yang penting dalam hal peningkatan produktifitas perusahaan. PT. Meprofarm merupakan perusahaan farmasi di Kota Bandung. Saat i...
PERANCANGAN SIMULASI PROMODEL UNTUK PERBAIKAN TATA LETAK LANTAI PRODUKSI COLD FINISHED BAR PT. IRON WIRE WORKS INDONESIA
PERANCANGAN SIMULASI PROMODEL UNTUK PERBAIKAN TATA LETAK LANTAI PRODUKSI COLD FINISHED BAR PT. IRON WIRE WORKS INDONESIA
PT Iron Wire Work Indonesia memiliki permasalahan pada penempatan mesin produksi Cold Finished Bar yang tidak sesuai dengan urutan kedekatan dalam proses produksinya dan metode pe...

