Javascript must be enabled to continue!
Presenting the Work of PIANC TG234 “Infrastructure for the Decarbonisation of IWT”
View through CrossRef
Abstract
PIANC provides guidance and technical advice for sustainable waterborne transport infrastructure. To address the challenge of making inland navigation infrastructure sustainable, a Task Group “Infrastructure for the decarbonisation of Inland Water Transport” (TG234) was set up in January 2021. The objective of the TG was to identify knowledge gaps and major challenges that need to be urgently addressed and advise PIANC on further actions, such as setting up a working group. A report was to be delivered in early 2022. The TG involved a range of international experts who met every three months on-line. They jointly participated in the following activities: sharing experiences in their area of expertise; gathering, organising, and discussing literature; discussing the perspective to be taken while reporting; contributing an overview of the developments either in their country or organisations and of course in the various discussions. A final report was produced that took the perspective of the waterway manager, highlighting a number of key questions that need to be answered in the transition to reduced/zero emissions. With the state-of-art knowledge gathered by the group, it became possible to identify the existing knowledge gaps and the major challenges that need to be addressed. The report can guide PIANC in evaluating the best way forward to address the decarbonisation of IWT infrastructure.
Title: Presenting the Work of PIANC TG234 “Infrastructure for the Decarbonisation of IWT”
Description:
Abstract
PIANC provides guidance and technical advice for sustainable waterborne transport infrastructure.
To address the challenge of making inland navigation infrastructure sustainable, a Task Group “Infrastructure for the decarbonisation of Inland Water Transport” (TG234) was set up in January 2021.
The objective of the TG was to identify knowledge gaps and major challenges that need to be urgently addressed and advise PIANC on further actions, such as setting up a working group.
A report was to be delivered in early 2022.
The TG involved a range of international experts who met every three months on-line.
They jointly participated in the following activities: sharing experiences in their area of expertise; gathering, organising, and discussing literature; discussing the perspective to be taken while reporting; contributing an overview of the developments either in their country or organisations and of course in the various discussions.
A final report was produced that took the perspective of the waterway manager, highlighting a number of key questions that need to be answered in the transition to reduced/zero emissions.
With the state-of-art knowledge gathered by the group, it became possible to identify the existing knowledge gaps and the major challenges that need to be addressed.
The report can guide PIANC in evaluating the best way forward to address the decarbonisation of IWT infrastructure.
Related Results
Assessing the utility of the increased wall thickness score in diagnosing ATTR cardiomyopathy: a validation study
Assessing the utility of the increased wall thickness score in diagnosing ATTR cardiomyopathy: a validation study
Abstract
Introduction
Cardiac amyloidosis due to transthyretin deposition (ATTR-CM) is often underdiagnosed. An increased left v...
Inland water transport workers and the Posting of Workers Directive
Inland water transport workers and the Posting of Workers Directive
Inland Water Transport (IWT) workers within the EU represent a workforce of about 50,000, most of whom work across borders on a regular basis. The national labour law applicable to...
Handling Accidents and Calamities in Hydraulic Structures – Objectives of Pianc Working Group WG-241
Handling Accidents and Calamities in Hydraulic Structures – Objectives of Pianc Working Group WG-241
Abstract
While the prior objective of hydraulic structures (such as lock gates, navigation river weirs and storm surge barriers) is to remain in service, engineer...
PIANC: weltweites Wissensnetzwerk für Wasserstraßen‐ und Hafenbau
PIANC: weltweites Wissensnetzwerk für Wasserstraßen‐ und Hafenbau
Abstract
Der Beitrag beleuchtet die bedeutende Rolle von PIANC – World Association for Waterborne Transport Infrastructure bei der Weiterentwicklung der Wasserstr...
Pain during ice water test distinguishes clinical bladder hypersensitivity from overactivity disorders
Pain during ice water test distinguishes clinical bladder hypersensitivity from overactivity disorders
Abstract
Background
The Bladder cooling reflex (BCR) i.e. uninhibited detrusor contractions evoked by intravesical instillation of cold saline, i...
Decarbonising the Inland Waterways: A Review of Fuel-Agnostic Energy Provision and the Infrastructure Challenges
Decarbonising the Inland Waterways: A Review of Fuel-Agnostic Energy Provision and the Infrastructure Challenges
Inland Waterway Transport (IWT) is widely recognised as an energy-efficient freight mode, yet its decarbonisation is increasingly constrained not by propulsion technology, but by t...
A Novel LiDAR Echo Signal Denoising Method Based on the VMD-CPO-IWT Algorithm
A Novel LiDAR Echo Signal Denoising Method Based on the VMD-CPO-IWT Algorithm
Due to the susceptibility of LiDAR echo signals to various noise interferences, which severely affect their detection quality and accuracy, this paper proposes a joint denoising me...
Efektivitas Internal Walking Training (IWT) terhadap Penurunan Tekanan Darah pada Peserta Program Pengelolaan Penyakit Kronis (Prolanis) di Puskesmas Imogiri 2
Efektivitas Internal Walking Training (IWT) terhadap Penurunan Tekanan Darah pada Peserta Program Pengelolaan Penyakit Kronis (Prolanis) di Puskesmas Imogiri 2
Penuaan sering kali memicu penurunan fungsi fisiologis pada lansia, dengan hipertensi sebagai penyakit tidak menular utama yang semakin memperburuk risiko masalah kardiovaskular. D...

