Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Flexible Pipe Design Optimization for West Africa Deepwater : Agbami Production Riser Case Study

View through CrossRef
Abstract Improved design methodologies associated with optimized material selection have been successfully applied in the Agbami development in 1450-1600m water depth to meet the field requirements related to the proposed flexible pipe system. The subsea production and gas/water injection wells will be connected to an FPSO via subsea manifolds, with flexible risers, flowlines and jumpers. Low-sour service conditions (50ppm H2S) specified for the production from Agbami field development were taken into consideration in order to design the most suitable pipe structures. Adequate plastic materials have been selected to optimize annulus environment of corrosive gases to a level compatible with the selected sweet high strength steel wires. Extensive testing has been carried out to ensure the steel wires selected for the Agbami pipe structures have sufficient resistance to SSC/HIC in the anticipated annulus conditions. Design of the 8?? production flexible riser structure proved to be challenging to satisfactorily accommodate all loadings associated with the deep-water environment, the low sour environment with the use of high strength sweet steel armor wires and in a single pipe section of 2000m long. The sealed plastic outer sheath of the flexible risers is protected by a plastic layer re-enforced by means of high strength aramid tapes. This design of the pipe structure significantly increases the mechanical resistance of flexible pipe against any kind of external damage as demonstrated through a series of full-scale qualification tests carried out on real pipe samples and witnessed by Third Party. The bend stiffener arrangement fitted over the flexible risers and located at the FPSO keel level, has been designed to accommodate abnormal scenario where the FPSO heel angle can reach 17o under damaged conditions for the vessel hull. An integrity management process has been initiated at the beginning of the project to identify potential causes of failures in order to implement a risk-consistent monitoring and inspection strategy to avoid failure during the service life of the considered flexible pipe system. This paper describes how innovative pipe design can enable the use of relatively large outside diameter flexible riser, for sour service production application, in deep water whilst utilizing a single pipe section. Introduction Flexible pipe has a long history of successful performance in deep water oil and gas industry. As the oil and gas reserves get deeper, the design challenges associated with the field developments increase. Improvements in the design methodologies, tools and the increased knowledge from field experience on the materials performance used to define the most suitable flexible pipe structures have had an impact on improving pipe design optimization, reducing design cycle times, minimizing the need for project specific qualification and finally reducing pipe cost.
Title: Flexible Pipe Design Optimization for West Africa Deepwater : Agbami Production Riser Case Study
Description:
Abstract Improved design methodologies associated with optimized material selection have been successfully applied in the Agbami development in 1450-1600m water depth to meet the field requirements related to the proposed flexible pipe system.
The subsea production and gas/water injection wells will be connected to an FPSO via subsea manifolds, with flexible risers, flowlines and jumpers.
Low-sour service conditions (50ppm H2S) specified for the production from Agbami field development were taken into consideration in order to design the most suitable pipe structures.
Adequate plastic materials have been selected to optimize annulus environment of corrosive gases to a level compatible with the selected sweet high strength steel wires.
Extensive testing has been carried out to ensure the steel wires selected for the Agbami pipe structures have sufficient resistance to SSC/HIC in the anticipated annulus conditions.
Design of the 8?? production flexible riser structure proved to be challenging to satisfactorily accommodate all loadings associated with the deep-water environment, the low sour environment with the use of high strength sweet steel armor wires and in a single pipe section of 2000m long.
The sealed plastic outer sheath of the flexible risers is protected by a plastic layer re-enforced by means of high strength aramid tapes.
This design of the pipe structure significantly increases the mechanical resistance of flexible pipe against any kind of external damage as demonstrated through a series of full-scale qualification tests carried out on real pipe samples and witnessed by Third Party.
The bend stiffener arrangement fitted over the flexible risers and located at the FPSO keel level, has been designed to accommodate abnormal scenario where the FPSO heel angle can reach 17o under damaged conditions for the vessel hull.
An integrity management process has been initiated at the beginning of the project to identify potential causes of failures in order to implement a risk-consistent monitoring and inspection strategy to avoid failure during the service life of the considered flexible pipe system.
This paper describes how innovative pipe design can enable the use of relatively large outside diameter flexible riser, for sour service production application, in deep water whilst utilizing a single pipe section.
Introduction Flexible pipe has a long history of successful performance in deep water oil and gas industry.
As the oil and gas reserves get deeper, the design challenges associated with the field developments increase.
Improvements in the design methodologies, tools and the increased knowledge from field experience on the materials performance used to define the most suitable flexible pipe structures have had an impact on improving pipe design optimization, reducing design cycle times, minimizing the need for project specific qualification and finally reducing pipe cost.

Related Results

Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Abstract As exploration activity increases and day rates increase for drilling vessels there is significant pressure on drilling contractors to push the limitatio...
Design and Sea Test of Flexible Riser System
Design and Sea Test of Flexible Riser System
ABSTRACT With offshore oil development projects advancing into deeper offshore waters, flexible risers suitable for floating oil production platforms are in incre...
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
ABSTRACT This paper presents a feasibility study for design of a spar with Top-Tensioned Production Risers (TTRs) in 10,000 ft water depth. The study was sponsore...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
The Dorada Field Production Risers
The Dorada Field Production Risers
Abstract The Dorada Field floating production system, located offshore Spain in 310 ft of water in the Mediterranean Sea, utilizes three individual production ris...
The Development of Deepwater Riser Recovery Technology in Liuhua Oil Field
The Development of Deepwater Riser Recovery Technology in Liuhua Oil Field
Abstract In the May of 2006, the three flexible risers of the FPSO " Nanhai Shengli?? at the Liuhua oil field in South China Sea were broken and dropped into seab...
The Agbami Project: A World Class Deepwater Development
The Agbami Project: A World Class Deepwater Development
Abstract With up to several billion barrels of oil in place, the Agbami project represents a true world-class development. Multiple stacked pay zones, 4,800 ft of...

Back to Top