Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation

View through CrossRef
Abstract As exploration activity increases and day rates increase for drilling vessels there is significant pressure on drilling contractors to push the limitations of both vessels and drilling equipment, as such deepwater drilling riser management has become a critical aspect of any well drilling operation. This is particularly the case in deepwater operations combined with potentially harsh environmental conditions (currents, wind, wave combinations) where maintaining operability is a potential problem as is maintaining riser integrity. There are several areas of technology development that may allow continued operations or planning of operations to allow minimal downtime related to environmental conditions. There are also several areas of key technology that could enable riser operations in deeper water depths. The items outlined will be assessed critically with respect to rig operations and highlight key areas that require development. Introduction It is accepted that for deepwater drilling riser analysis drilling contractors and operators adhere to the guidance provided by API RP16Q to define riser tensions and assess operability, hang-off, drift-off and weak point analysis, however each operator / drilling contractor may have procedures in place to enhance operability, maintain mean riser angles and so on. It is the intent of this paper to assess what procedures are in place as compared to what aspects are typically analyzed. The intent of the paper is to also offer a critical assessment of potential enabling technologies be they the deployment of fairings, composite auxiliary lines, riser materials, drilling riser management software or real time monitoring systems. Drilling Riser Management The operation of deepwater drilling riser systems are generally dependent upon the current regime at any particular well location, with the most significant impact on riser response from the full depth current profile rather than just from surface current alone. It should also be noted that it is not sufficient to just address the drilling riser alone since interaction with the wellhead and conductor becomes considerably more important as tension in the riser increases. It is generally accepted that riser analysis allows operators and drilling contractors a perception of what potentially will influence riser operations during the drilling program. Riser operations being considered as the following:Open water operationsOperabilityHang-off performanceFatigueRunning and retrieval The main driver for good drilling riser management (see figure 1) practice is the concept that no drilling contractor wants to have to pull the riser in a storm, or leave it hanging from the spider / tensioners and hence there is pressure applied to provide a system robust enough to remain connected during a storm and preferably remain drilling ahead. In order to manage long strings of drilling riser it is accepted that certain strategies can be applied in an attempt to combat the loss of operability:Control riser tension (increase to reduce LFJ angle)Control vessel positionSpaceout modificationsAlter riser drag (with fairings or otherwise) In order to manage long strings of drilling riser in harsh environments, that may comprise high currents in combination with severe wave regimes, it is necessary for a vessel operating at a particular well location to have access to significant amounts of data related to drilling equipment and metocean conditions.
Title: Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Description:
Abstract As exploration activity increases and day rates increase for drilling vessels there is significant pressure on drilling contractors to push the limitations of both vessels and drilling equipment, as such deepwater drilling riser management has become a critical aspect of any well drilling operation.
This is particularly the case in deepwater operations combined with potentially harsh environmental conditions (currents, wind, wave combinations) where maintaining operability is a potential problem as is maintaining riser integrity.
There are several areas of technology development that may allow continued operations or planning of operations to allow minimal downtime related to environmental conditions.
There are also several areas of key technology that could enable riser operations in deeper water depths.
The items outlined will be assessed critically with respect to rig operations and highlight key areas that require development.
Introduction It is accepted that for deepwater drilling riser analysis drilling contractors and operators adhere to the guidance provided by API RP16Q to define riser tensions and assess operability, hang-off, drift-off and weak point analysis, however each operator / drilling contractor may have procedures in place to enhance operability, maintain mean riser angles and so on.
It is the intent of this paper to assess what procedures are in place as compared to what aspects are typically analyzed.
The intent of the paper is to also offer a critical assessment of potential enabling technologies be they the deployment of fairings, composite auxiliary lines, riser materials, drilling riser management software or real time monitoring systems.
Drilling Riser Management The operation of deepwater drilling riser systems are generally dependent upon the current regime at any particular well location, with the most significant impact on riser response from the full depth current profile rather than just from surface current alone.
It should also be noted that it is not sufficient to just address the drilling riser alone since interaction with the wellhead and conductor becomes considerably more important as tension in the riser increases.
It is generally accepted that riser analysis allows operators and drilling contractors a perception of what potentially will influence riser operations during the drilling program.
Riser operations being considered as the following:Open water operationsOperabilityHang-off performanceFatigueRunning and retrieval The main driver for good drilling riser management (see figure 1) practice is the concept that no drilling contractor wants to have to pull the riser in a storm, or leave it hanging from the spider / tensioners and hence there is pressure applied to provide a system robust enough to remain connected during a storm and preferably remain drilling ahead.
In order to manage long strings of drilling riser it is accepted that certain strategies can be applied in an attempt to combat the loss of operability:Control riser tension (increase to reduce LFJ angle)Control vessel positionSpaceout modificationsAlter riser drag (with fairings or otherwise) In order to manage long strings of drilling riser in harsh environments, that may comprise high currents in combination with severe wave regimes, it is necessary for a vessel operating at a particular well location to have access to significant amounts of data related to drilling equipment and metocean conditions.

Related Results

Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
Abstract As part of the Norwegian Deepwater Programme (NDP) a state of the art review was carried out by DNV to gather information on the various riser monitoring...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
COBRA Riser Concept for Ultra Deepwater Condition
COBRA Riser Concept for Ultra Deepwater Condition
Offshore ultra deepwater field is being promising as the future of oil and gas reserves. However, the development of ultra deepwater field posed many challenges, in particular, on ...
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
ABSTRACT This paper presents a feasibility study for design of a spar with Top-Tensioned Production Risers (TTRs) in 10,000 ft water depth. The study was sponsore...