Production Time Optimization using Campbell Dudek Smith (CDS) Algorithm for Production Scheduling
View through CrossRef
The production time optimization study used the Campbell Dudek smith (CDS) algorithm in the production process scheduling aimed at makespan optimization for engine operation to produce 12-size pan products, 14-size griddle, 16-size griddle, 18-size griddle, and 20-size griddle. The method applied by the Campbell Dudek and Smith (CDS) algorithm, CDS is a method used in flowshop-type scheduling developed from Johnson's rule that is able to minimize makespan 2 machines arranged in series. The CDS method is very suitable for production characters who apply the machine sequence to the production process. CDS produces several iterations that have makespan values, from the few iterations the most minimum makespan value is obtained to determine the order of products to be produced. This research produces an application that can schedule products to be produced by the machine automatically. From the results of testing with a total production of 12 pieces on each product with repetitions of 6 times, the minimum makespan value is 210.12 minutes with a work order of 20, grid 18, griddle 16, griddle 14, and griddle 12. Accuracy of results Application testing showed 99.99% for the first time and 99.96% for the second time when compared to manual calculations.
Title: Production Time Optimization using Campbell Dudek Smith (CDS) Algorithm for Production Scheduling
Description:
The production time optimization study used the Campbell Dudek smith (CDS) algorithm in the production process scheduling aimed at makespan optimization for engine operation to produce 12-size pan products, 14-size griddle, 16-size griddle, 18-size griddle, and 20-size griddle.
The method applied by the Campbell Dudek and Smith (CDS) algorithm, CDS is a method used in flowshop-type scheduling developed from Johnson's rule that is able to minimize makespan 2 machines arranged in series.
The CDS method is very suitable for production characters who apply the machine sequence to the production process.
CDS produces several iterations that have makespan values, from the few iterations the most minimum makespan value is obtained to determine the order of products to be produced.
This research produces an application that can schedule products to be produced by the machine automatically.
From the results of testing with a total production of 12 pieces on each product with repetitions of 6 times, the minimum makespan value is 210.
12 minutes with a work order of 20, grid 18, griddle 16, griddle 14, and griddle 12.
Accuracy of results Application testing showed 99.
99% for the first time and 99.
96% for the second time when compared to manual calculations.
Related Results
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
This randomized clinical trial explores whether hormone intensification at start of androgen deprivation therapy alters selection of androgen receptor (AR) gene alterations within ...
Annealing and surface treatment effect on the optical and electrical properties of n-type CdS binary compound semiconductors
Annealing and surface treatment effect on the optical and electrical properties of n-type CdS binary compound semiconductors
The preparation of CdS thin films were actualised with electrodeposition technique using cathodic voltage of 1200 milli – Volts (mV). The optical and electrical properties of three...
Synthesis of Polyaniline Supported CdS/CdS-ZnS/CdS-TiO2 Nanocomposite for Efficient Photocatalytic Applications
Synthesis of Polyaniline Supported CdS/CdS-ZnS/CdS-TiO2 Nanocomposite for Efficient Photocatalytic Applications
Photocatalytic degradation can be increased by improving photo-generated electrons and broadening the region of light absorption through conductive polymers. In that view, we have ...
Analisa Penjadwalan Produksi Dengan Metode Campbell Dudek Smith Untuk Meminimasi Makespan di CV. YZX
Analisa Penjadwalan Produksi Dengan Metode Campbell Dudek Smith Untuk Meminimasi Makespan di CV. YZX
CV YZX is a manufacturing company in the stainless steel hardware sector that specializes in hardware and detailing. This company actively produces for the needs of individual cons...
Engineering FRET-based carbon dots enables simple and ultrahighly solar-conversive luminescent solar concentrators
Engineering FRET-based carbon dots enables simple and ultrahighly solar-conversive luminescent solar concentrators
Carbon dots (CDs) have been attracting a great deal of attention as an emitter embedded into the waveguide layer to fabricate the luminescent solar concentrators (LSCs). Instead of...
Validation of the OAKS prognostic model for acute kidney injury after gastrointestinal surgery
Validation of the OAKS prognostic model for acute kidney injury after gastrointestinal surgery
Abstract
Background
Postoperative acute kidney injury (AKI) is a common complication of major gastrointestinal surgery with an i...
PERBAIKAN PENJADWALAN DENGAN ALGORITMA CAMPBELL DUDEK SMITH (CDS) GUNA MENDAPATKAN NILAI MAKESPAN TERKECIL
PERBAIKAN PENJADWALAN DENGAN ALGORITMA CAMPBELL DUDEK SMITH (CDS) GUNA MENDAPATKAN NILAI MAKESPAN TERKECIL
Penjadwalan merupakan pengalokasian sumber daya dari waktu ke waktu untuk menunjang pelaksanaan dan penyelesaian suatu aktivitas pengerjaan spesifik. CV. Padat Karya Tekhnik merupa...
Campbell Standards: Modernizing Campbell's Methodologic Expectations for Campbell Collaboration Intervention Reviews (MECCIR)
Campbell Standards: Modernizing Campbell's Methodologic Expectations for Campbell Collaboration Intervention Reviews (MECCIR)
Introduction
The authors formed a small working group to modernize the Methodological Expectations for Campbell Collaboration Intervention Reviews (MECCIR). We ...