Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Sistem Koordinasi Rele Jarak Untuk Pengaman Utama Dengan Rele Arus Lebih Pada Saluran Udara Tegangan Tinggi Di Wilayah Buduran

View through CrossRef
The transmission system plays an important role in maintaining the continuity of the distribution of electrical energy from one region to another. Disturbances in transmission lines are caused by short circuits, overloads, lightning surges, natural disturbances and others. For this reason, a protection system is needed that is reliable and can identify disturbances quickly while protecting the disturbed part of the system from other parts that can still operate normally. However, the protection system can experience operational failure due to various factors, therefore, apart from the main protection, backup protection is needed which can work when the main protection fails to work. Distance relays can be used as primary protection as well as remote backup protection on high voltage overhead lines. Meanwhile, the overcurrent relay is used as local backup protection if the distance relay fails to work. In this paper, a protection system is designed for the Buduran Main Substation channel using a combination of distance relays as main protection and overcurrent relays as backup protection using simulation method the Digsilent Power Factory. The overcurrent relay will trip at 0.5 and 0.15 seconds. From the Load Flow results, the value is obtained = 3,615 kA, = 4,67 kA and The range impedance according to the conductor cable data at the Buduran region  0,9676, Zone1 1 0,79Ω; 80%, Zone2 1,19Ω; 120% dan Zone3 as 1,48Ω is 150%. Thus the research can be declared successful in carrying out overcurrent protection
Title: Sistem Koordinasi Rele Jarak Untuk Pengaman Utama Dengan Rele Arus Lebih Pada Saluran Udara Tegangan Tinggi Di Wilayah Buduran
Description:
The transmission system plays an important role in maintaining the continuity of the distribution of electrical energy from one region to another.
Disturbances in transmission lines are caused by short circuits, overloads, lightning surges, natural disturbances and others.
For this reason, a protection system is needed that is reliable and can identify disturbances quickly while protecting the disturbed part of the system from other parts that can still operate normally.
However, the protection system can experience operational failure due to various factors, therefore, apart from the main protection, backup protection is needed which can work when the main protection fails to work.
Distance relays can be used as primary protection as well as remote backup protection on high voltage overhead lines.
Meanwhile, the overcurrent relay is used as local backup protection if the distance relay fails to work.
In this paper, a protection system is designed for the Buduran Main Substation channel using a combination of distance relays as main protection and overcurrent relays as backup protection using simulation method the Digsilent Power Factory.
The overcurrent relay will trip at 0.
5 and 0.
15 seconds.
From the Load Flow results, the value is obtained = 3,615 kA, = 4,67 kA and The range impedance according to the conductor cable data at the Buduran region  0,9676, Zone1 1 0,79Ω; 80%, Zone2 1,19Ω; 120% dan Zone3 as 1,48Ω is 150%.
Thus the research can be declared successful in carrying out overcurrent protection.

Related Results

Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Esensinya setiap generator listrik satu fasa maupun tiga fasa telah dilengkapi dengan sistem eksitasi. Sistem eksitasi generator ada tiga, yaitu sistem eksitasi statis, dinamis, da...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
KECEMASAN SAAT PANDEMI COVID 19: LITERATUR REVIEW Hardiyati, Efri Widianti, Taty Hernawaty Departemen Keperawatan Jiwa Poltekkes Kemenkes Mamuju Sulbar, Universitas Pad...
Koordinasi Rele Arus Lebih di Perusahaan Nikel Indonesia Menggunakan Grasshopper Optimization Algorithm
Koordinasi Rele Arus Lebih di Perusahaan Nikel Indonesia Menggunakan Grasshopper Optimization Algorithm
Setiap sistem kelistrikan bergantung pada ketersediaan energi yang berkelanjutan untuk menjaga produktivitas industri tetap berjalan. Gangguan listrik akan merusak peralatan listri...
PEMANFAATAN RELE DISTANCE NUMERIK SEBAGAI PENGGANTI RELE DISTANCE ELEKTROSTATIS PADA GARDU INDUK MEKARSARI
PEMANFAATAN RELE DISTANCE NUMERIK SEBAGAI PENGGANTI RELE DISTANCE ELEKTROSTATIS PADA GARDU INDUK MEKARSARI
Prinsip dasar suatu rele adalah sebagai pengaman pada sistem tenaga listrik, bagaimana cara rele bekerja dengan baik , cepat, dan tepat agar gangguan pada sistem tenaga listrik tid...
Rancang Bangun Rele Diferensial Berbasis Arduino
Rancang Bangun Rele Diferensial Berbasis Arduino
Rele diferensial adalah sebuah alat proteksi yang bekerja berdasarkan hukum Kirchoff arus. Hal ini dilakukan dengan cara membandingkan jumlah vektor arus yang masuk dan keluar dari...
Analisis Rugi Tegangan Jaringan Distribusi 20 KV Pada PT. PLN (Persero) Cabang Merauke
Analisis Rugi Tegangan Jaringan Distribusi 20 KV Pada PT. PLN (Persero) Cabang Merauke
Sistem Distribusi merupakan salah satu bagian penting dalam penyaluran energi listrik. Dalam penyalurannya, energi listrik yang disalurkan tidak seluruhnya diterima oleh konsumen. ...

Back to Top