Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Improving Efficiency of Coiled Tubing Operations on Vankor Field

View through CrossRef
Abstract Coiled tubing is commonly used as an intervention tool for treatment delivery in long horizontal wells. As with any intervention tool, however, coiled tubing has operational limitations. Depending on the diameter of the horizontal sections and the well trajectory, accessing laterals greater than 1,000 m is often problematic or not possible due to helical friction lock-up. The well profiles in Vankor, a new frontier oil and gas field in East Siberia, are designed with a reverse bend in it allowing the horizontal section of more than 1,000 m the wellbore to be directly beneath the wellhead. There is an 800 m thick layer of perma-frost which is coupled with extremely low reservoir temperatures that complicates the intervention causing the wax precipitation in tubing. Conventionally, it is possible to change the geometry of the intervention (CT OD), optimize the string design, utilize lubricants (metal to metal friction reducers), straighten the coiled tubing string, use downhole tractors and vibration tools. The use of different methods yields incremental reach of 5 – 20% in some cases. This paper highlights an approach that has been implemented in Vankor field to enable the coiled tubing intervention to access the horizontal lateral with the methods of string design optimization and utilization of downhole BHA vibration. The coiled tubing string design requires the special attention for successful intervention in horizontal and extended reach wells. The optimized tapered string allows increasing the advance of coiled tubing to 5-15% compared to traditional design. The vibrator tool can effectively increase CT access to the extended reach hole by reducing the implied friction coefficient of the wellbore up to additional 10 %. The tool is actually delaying the helical shape and reducing the number of coiled tubing contact points dragging on the well bore. This paper reviews the engineering and operational challenges related to utilizing coiled tubing in Vankor field and the solutions required to overcome these issues.
Title: Improving Efficiency of Coiled Tubing Operations on Vankor Field
Description:
Abstract Coiled tubing is commonly used as an intervention tool for treatment delivery in long horizontal wells.
As with any intervention tool, however, coiled tubing has operational limitations.
Depending on the diameter of the horizontal sections and the well trajectory, accessing laterals greater than 1,000 m is often problematic or not possible due to helical friction lock-up.
The well profiles in Vankor, a new frontier oil and gas field in East Siberia, are designed with a reverse bend in it allowing the horizontal section of more than 1,000 m the wellbore to be directly beneath the wellhead.
There is an 800 m thick layer of perma-frost which is coupled with extremely low reservoir temperatures that complicates the intervention causing the wax precipitation in tubing.
Conventionally, it is possible to change the geometry of the intervention (CT OD), optimize the string design, utilize lubricants (metal to metal friction reducers), straighten the coiled tubing string, use downhole tractors and vibration tools.
The use of different methods yields incremental reach of 5 – 20% in some cases.
This paper highlights an approach that has been implemented in Vankor field to enable the coiled tubing intervention to access the horizontal lateral with the methods of string design optimization and utilization of downhole BHA vibration.
The coiled tubing string design requires the special attention for successful intervention in horizontal and extended reach wells.
The optimized tapered string allows increasing the advance of coiled tubing to 5-15% compared to traditional design.
The vibrator tool can effectively increase CT access to the extended reach hole by reducing the implied friction coefficient of the wellbore up to additional 10 %.
The tool is actually delaying the helical shape and reducing the number of coiled tubing contact points dragging on the well bore.
This paper reviews the engineering and operational challenges related to utilizing coiled tubing in Vankor field and the solutions required to overcome these issues.

Related Results

Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Abstract Recent technological innovations in seismic imaging, directional drilling and hydraulic fracturing and other completion techniques have made development of ...
Metal-Polymer Coiled Tubing
Metal-Polymer Coiled Tubing
Abstract Metal-polymer coiled tubing (MCT) are flexible pipes based on a copolymer reinforced with steel tape, wires and ropes. During the research was proposed and ...
Offshore Rigless Coiled Tubing Operations Drives a Paradigm Shift of Cost-Effective Interventions in Gulf of Suez, Egypt
Offshore Rigless Coiled Tubing Operations Drives a Paradigm Shift of Cost-Effective Interventions in Gulf of Suez, Egypt
Abstract Gulf of Suez is one of the prolific Oil & gas areas in the world. Oil Production in this area started as early as 1960s when Giant Morgan Field was disc...
Coiled Tubing Working Life Prediction
Coiled Tubing Working Life Prediction
ABSTRACT Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coi...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract OBJECTIVE / SCOPE An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Challenging Through-Tubing Intervention Succeeds Despite Extreme Well Conditions
Challenging Through-Tubing Intervention Succeeds Despite Extreme Well Conditions
Abstract The subject well, located onshore in the Kingdom of Saudi Arabia, had approximately 9,000 ft of 2.00-in coiled tubing lost in the wellbore, and was requirin...

Back to Top