Scheduling Analysis using CPM, PERT, and LoB Method
View through CrossRef
Project delays frequently occur in construction projects and often result from the inability to accurately identify critical activities within the project network, leading to ineffective time control. Therefore, it is necessary to apply scheduling methods that are appropriate to the characteristics of the project in order to improve time control effectiveness and minimize the risk of delays. The aim of this research is to analyze scheduling results using the Critical Path Method, Program Evaluation and Review Technique, and Line Of Balance method. Also, to determine the difference in project completion duration using the PERT, CPM and LoB Methods. This research employs a quantitative method with a comparative approach, using secondary data that was obtained from a supervisory consultant. The data includes the durations and the work list. The analysis data is obtained to determine the critical path using PERT, CPM and LoB methods. The PERT method calculates three estimation times: optimistic duration, most likely duration, and pessimistic duration to determine the critical path. The results show the CPM and LoB method predicts the completion project in 159 days, and the PERT method predicts the completion project in 164 days. The difference in completing the project using the CMP and PERT methods is 5 days. The difference in project completion duration between LOB and PERT is 5 days. In contrast, no difference is observed between the CPM and LOB methods, as both yield an identical project completion time of 159 days.
Indonesian Journal Publisher
Title: Scheduling Analysis using CPM, PERT, and LoB Method
Description:
Project delays frequently occur in construction projects and often result from the inability to accurately identify critical activities within the project network, leading to ineffective time control.
Therefore, it is necessary to apply scheduling methods that are appropriate to the characteristics of the project in order to improve time control effectiveness and minimize the risk of delays.
The aim of this research is to analyze scheduling results using the Critical Path Method, Program Evaluation and Review Technique, and Line Of Balance method.
Also, to determine the difference in project completion duration using the PERT, CPM and LoB Methods.
This research employs a quantitative method with a comparative approach, using secondary data that was obtained from a supervisory consultant.
The data includes the durations and the work list.
The analysis data is obtained to determine the critical path using PERT, CPM and LoB methods.
The PERT method calculates three estimation times: optimistic duration, most likely duration, and pessimistic duration to determine the critical path.
The results show the CPM and LoB method predicts the completion project in 159 days, and the PERT method predicts the completion project in 164 days.
The difference in completing the project using the CMP and PERT methods is 5 days.
The difference in project completion duration between LOB and PERT is 5 days.
In contrast, no difference is observed between the CPM and LOB methods, as both yield an identical project completion time of 159 days.
Related Results
A67-15 Impact of Initiation of a Pulmonary Embolism Response Team (PERT) on Outpatient Pulmonary Follow-up
A67-15 Impact of Initiation of a Pulmonary Embolism Response Team (PERT) on Outpatient Pulmonary Follow-up
Abstract
Rationale
Pulmonary Embolism Response Teams (PERT) provide in-hospital risk stratification and management of acu...
PERBEDAAN PENGARUH LATIHAN DRILL DAN POLA PUKULAN TERHADAP KETERAMPILAN LOB BULU TANGKIS PADA SISWA EXTRAKURIKULER BULU TANGKIS
PERBEDAAN PENGARUH LATIHAN DRILL DAN POLA PUKULAN TERHADAP KETERAMPILAN LOB BULU TANGKIS PADA SISWA EXTRAKURIKULER BULU TANGKIS
ABSTRAK
Tujuan penelitian untuk mengetahui (1). Untuk mengetahui Perbedaan pengaruh pendekatan sistem latihan drill dan pola pukulan terhadap keterampilan lob bul...
Pengaruh Latihan Lob-Shoot dan Lob Stop-Shoot Terhadap Peningkatan Hasil Ketepatan Pada Pemain Futsal Club Tangsah FC
Pengaruh Latihan Lob-Shoot dan Lob Stop-Shoot Terhadap Peningkatan Hasil Ketepatan Pada Pemain Futsal Club Tangsah FC
Penelitian ini bertujuan untuk menganalisis pengaruh metode latihan Lob Shoot dan Lob Stop-Shoot terhadap peningkatan ketepatan shooting pada pemain futsal Club Tangsah FC Desa Pri...
Use of Acrylic Functionalized (Meth)acrylic Cross‐Linked Polymer Microparticles in Photopolymerized Acrylic Films
Use of Acrylic Functionalized (Meth)acrylic Cross‐Linked Polymer Microparticles in Photopolymerized Acrylic Films
AbstractThe effect of reactive (meth)acrylic cross‐linked polymer microparticles (reactive CPM, also called reactive microgels) used as cross‐linking agents has been studied on the...
Understanding Patient Decision-Making in Breast Cancer Surgery: Risk Perception, Communication, and Psychosocial Influences
Understanding Patient Decision-Making in Breast Cancer Surgery: Risk Perception, Communication, and Psychosocial Influences
Background: Despite evidence discouraging contralateral prophylactic mastectomy (CPM) in average-risk patients, its use is increasing globally. While well-studied in Western settin...
Carboxypeptidase M Cleaves the C-Terminal Lysine of Stromal Cell-Derived Factor-1α and Is Expressed by Human Bone Marrow Cells.
Carboxypeptidase M Cleaves the C-Terminal Lysine of Stromal Cell-Derived Factor-1α and Is Expressed by Human Bone Marrow Cells.
Abstract
Carboxypeptidase M (CPM) is a zinc-dependent phospho-inositol-anchored protease that cleaves carboxy-terminal basic residues such as arginine or lysine from...
Analisis Penjadwalan Proyek Pembangunan dengan Menggunakan Metode CPM Dan PERT
Analisis Penjadwalan Proyek Pembangunan dengan Menggunakan Metode CPM Dan PERT
Rama Engineering is one of the companies that is moving in the field of construction that is currently working on the construction project of the University of Pamulang campus 3 Wi...
Why Science Needs Causal Problem Modelling
Why Science Needs Causal Problem Modelling
Science now operates in an era of unprecedented data, computational power, and AI (artificial intelligence)-driven ideation, yet scientific inquiry seemingly remains largely fragme...