SS: MODU Risk-Moored MODU Risk Assessment

View through CrossRef
Abstract During the Gulf of Mexico (GoM) hurricane seasons of 2004, 2005 and 2008, numerous moored Mobile Offshore Drilling Units (MODUs) had complete mooring system failures and thus were later found to be adrift. Also, a few units suffered failure of one or more mooring lines but at least one line held to keep the unit from going adrift. As a result of these mooring failures, operators and rig owners expended much effort in recovering the vessels, the mooring components, and then in making the required repairs in order to restart operations. Other major consequences of the mooring failures were: direct damage to the industry's infrastructure such as pipelines and umbilicals, loss of production, and delays in several well programs. MODUs in the GoM are a critical part of the necessary infrastructure for exploration and development of oil and gas. Industry standards that allow safe and economic operations of MODUs are important to the industry and regulatory authorities. Much work has been done since the events in the 2004 and 2005 GoM hurricane seasons to better understand the causes of moored MODU failures and learn from these failures. This knowledge has resulted in changes to the industry standards regarding mooring of MODUs. As an example, selection of the design return period is no longer prescriptive but based on performing a suitable risk assessment. Using a Quantitative Risk Assessment (QRA) approach, the risk can be evaluated at every well location planned to be drilled during the GoM hurricane season. These results can be used to make more informed decisions regarding rig deployments during the GoM hurricane season. In addition, the QRA methodology can be extended to more comprehensive considerations (e.g. all of the GoM) in order to better understand the risk posed by the moored MODU fleet to an operator's entire portfolio of deepwater facilities and infrastructure. This paper describes a process that can be used to assess the risk associated with moored MODU operations and provides some examples to demonstrate the utility of the process. Introduction As a result of the numerous moored MODU failures during hurricanes Ivan, Katrina and Rita, the industry has reexamined the API guidelines for design of MODU moorings. Changes have been made to the current API guidelines as discussed in Refs. 1 and 2. The cornerstone of API RP 2SK, Appendix K (Ref. 3) is a risk assessment process to provide a consistent technical basis on which to make decisions of suitability of a particular rig at a specific site for a specific period of the GoM hurricane season. Per MMS NTL No. 2009-G09 (Ref. 4), a mooring risk assessment is required with every drilling permit. The QRA approach provides a means to rationally assess the risks, document the results, and compare the results to a company's internal guidelines in order to make better decisions regarding rig deployments. The process also provides a framework for consistently comparing the risk over multiple well locations. An example site is presented herein that includes nearby surface and subsea infrastructure (at 10 miles or less) to demonstrate how the process works. Results are presented to particulary show the impact of drilling during the peak of the GoM hurricane season (approximately August 15 through October 15). Additionally, a second example shows the conclusions from a QRA that considers a comprehensive portfolio of deepwater infrastructure (surface facilities, pipelines and flowlines) being exposed to the fleet of moored MODUs during GoM (both peak and non-peak) hurricane season is presented. The second example further considers both the pre and post upgraded MODU mooring systems (i.e., relative to their 2004 condition). It is shown that proximity of the MODU to the infrastructure and the lost value placed on that infrastructure greatly influence the outcome of the QRA.
Title: SS: MODU Risk-Moored MODU Risk Assessment
Description:
Abstract During the Gulf of Mexico (GoM) hurricane seasons of 2004, 2005 and 2008, numerous moored Mobile Offshore Drilling Units (MODUs) had complete mooring system failures and thus were later found to be adrift.
Also, a few units suffered failure of one or more mooring lines but at least one line held to keep the unit from going adrift.
As a result of these mooring failures, operators and rig owners expended much effort in recovering the vessels, the mooring components, and then in making the required repairs in order to restart operations.
Other major consequences of the mooring failures were: direct damage to the industry's infrastructure such as pipelines and umbilicals, loss of production, and delays in several well programs.
MODUs in the GoM are a critical part of the necessary infrastructure for exploration and development of oil and gas.
Industry standards that allow safe and economic operations of MODUs are important to the industry and regulatory authorities.
Much work has been done since the events in the 2004 and 2005 GoM hurricane seasons to better understand the causes of moored MODU failures and learn from these failures.
This knowledge has resulted in changes to the industry standards regarding mooring of MODUs.
As an example, selection of the design return period is no longer prescriptive but based on performing a suitable risk assessment.
Using a Quantitative Risk Assessment (QRA) approach, the risk can be evaluated at every well location planned to be drilled during the GoM hurricane season.
These results can be used to make more informed decisions regarding rig deployments during the GoM hurricane season.
In addition, the QRA methodology can be extended to more comprehensive considerations (e.
g.
all of the GoM) in order to better understand the risk posed by the moored MODU fleet to an operator's entire portfolio of deepwater facilities and infrastructure.
This paper describes a process that can be used to assess the risk associated with moored MODU operations and provides some examples to demonstrate the utility of the process.
Introduction As a result of the numerous moored MODU failures during hurricanes Ivan, Katrina and Rita, the industry has reexamined the API guidelines for design of MODU moorings.
Changes have been made to the current API guidelines as discussed in Refs.
1 and 2.
The cornerstone of API RP 2SK, Appendix K (Ref.
3) is a risk assessment process to provide a consistent technical basis on which to make decisions of suitability of a particular rig at a specific site for a specific period of the GoM hurricane season.
Per MMS NTL No.
2009-G09 (Ref.
4), a mooring risk assessment is required with every drilling permit.
The QRA approach provides a means to rationally assess the risks, document the results, and compare the results to a company's internal guidelines in order to make better decisions regarding rig deployments.
The process also provides a framework for consistently comparing the risk over multiple well locations.
An example site is presented herein that includes nearby surface and subsea infrastructure (at 10 miles or less) to demonstrate how the process works.
Results are presented to particulary show the impact of drilling during the peak of the GoM hurricane season (approximately August 15 through October 15).
Additionally, a second example shows the conclusions from a QRA that considers a comprehensive portfolio of deepwater infrastructure (surface facilities, pipelines and flowlines) being exposed to the fleet of moored MODUs during GoM (both peak and non-peak) hurricane season is presented.
The second example further considers both the pre and post upgraded MODU mooring systems (i.
e.
, relative to their 2004 condition).
It is shown that proximity of the MODU to the infrastructure and the lost value placed on that infrastructure greatly influence the outcome of the QRA.

Related Results

Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
SS: MODU Anchor-Regional Analysis of Seafloor and Near Surface Sediments for MODU Anchors
SS: MODU Anchor-Regional Analysis of Seafloor and Near Surface Sediments for MODU Anchors
Abstract A significant challenge of predicting Mobile Offshore Drilling Unit (MODU) anchor performance is the lack of detailed sediment information. There are sev...
SS: MODU Risk-MODU Mooring Strength and Reliability JIP Overview
SS: MODU Risk-MODU Mooring Strength and Reliability JIP Overview
Abstract The MODU Mooring Strength and Reliability Joint Industry Project (JIP) was a massive industry effort that involved all sectors of the MODU mooring indust...
The Influence of Passing Ships on Ships moored in Restricted Waters
The Influence of Passing Ships on Ships moored in Restricted Waters
Abstract Ships moored in harbours are subjected to hydrodynamic forces due to other ships passing nearby. Such forces induce motions of the moored ship which may ...
Effects of Passing Ship With a Drift Angle on a Moored Ship
Effects of Passing Ship With a Drift Angle on a Moored Ship
When a ship sailing at low speed passes a moored ship with a drift angle due to wind effect, the flow field around the ships is very different to the flow field without a drift ang...
SS: MODU Risk- MODU Mooring Comparative Risk Assessment
SS: MODU Risk- MODU Mooring Comparative Risk Assessment
Abstract After the hurricanes in the GoM that resulted in several semi-submersible MODUs breaking adrift, one task of the MODU Mooring Strength and Reliability JI...
SS: MODU Risk- Evaluation of Low Frequency damping and Analysis Methods for MODU Moorings
SS: MODU Risk- Evaluation of Low Frequency damping and Analysis Methods for MODU Moorings
Abstract As higher environmental criteria are now required for GOM MODU mooring operations, the accuracy of the mooring analysis for site assessment becomes more ...
The Neptune Spar - Performance Over the First Two Years of Production
The Neptune Spar - Performance Over the First Two Years of Production
Abstract This paper reviews the performance of the Neptune Spar for the fwst two years of its producing history. Equipment operation and required modifications to...