Comparative Risk Analysis of Two FPSO Mooring Configurations

View through CrossRef
Abstract A methodology is set out for comparing the risks and reliabil-ities associated with two FPSO configurations offshore Brazil, one turret-moored and the other spread-moored. Both qualita-tive risk assessment (HAZID) and detailed quantitative as-sessment (structural reliability analysis) methods were used. Risk comparisons are important to Operators when choos-ing between potential development options, and to Regulators when trying to accept new concepts. This paper shows how qualitative and quantitative risk analyses are best combined to generate a rigorous and objective risk comparison between potential concepts. It also highlights areas where effort is best focussed to mitigate the marine risks. The operational HAZID comparatively assessed the ma-rine risks, with emphasis on offloading operations. It was appreciated that the limited weather vaning of the spread moored FPSO would lead to different risks for shuttle tanker operations. The dominance of wind and current as the vessels changed draft during oil transfer needed to be carefully as-sessed. Other areas of particular interest were the differences between the use of risers through a conventional turret, and external risers hung off the side of the spread moored vessel. The quantitative assessments are concerned with the strength and fatigue of the mooring lines subject to uncertain environ-mental loads and mooring line strength. Both single-line and double-line mooring failures were analyzed. Special attention is paid to an original method, which attempts to synthesize the mooring failure probabilities contributed from all potential failing lines and environmental directions. Introduction Two new FPSOs production facilities for the Caratinga and Barracuda fields offshore Brazil will be designed to accom-modate up to 80 and 107 risers, respectively. The large num-ber of risers needed at the locations makes a standard turret moored system impractical. This is because all the risers that would have to come up through the turret system, and such a large diameter turret capable of accommodating all of the riser I-tubes has yet to be developed. As a result of this, and other factors, a spread-moored FPSO will be installed that will ac-commodate the large number of risers along the exterior of the side shell. Spread-moored FPSOs are not uncommon; there are many operating throughout the world, particularly in West Africa, and currently other new facilities are being designed. However, the proposed spread-moored system for the new FPSO will use a combination of relatively new approaches and materials, including combination chain/polyester mooring lines and suction piles anchors. None of these items are unique, and all have been used at some other locations in the past. Notwithstanding the past experience with other spread moored FPSOs, there was general interest by the Brazilian oil industry and regulatory bodies to assess the comparative risks between the spread-moored and a conventional turret moored designs, which has been the common FPSO mooring system used offshore Brazil to date. Based on this experience, there is confidence in the conven-tional turret moored units in this region, and there is a desire to ensure that there are no undue risks associated with a spread moored system.
Title: Comparative Risk Analysis of Two FPSO Mooring Configurations
Description:
Abstract A methodology is set out for comparing the risks and reliabil-ities associated with two FPSO configurations offshore Brazil, one turret-moored and the other spread-moored.
Both qualita-tive risk assessment (HAZID) and detailed quantitative as-sessment (structural reliability analysis) methods were used.
Risk comparisons are important to Operators when choos-ing between potential development options, and to Regulators when trying to accept new concepts.
This paper shows how qualitative and quantitative risk analyses are best combined to generate a rigorous and objective risk comparison between potential concepts.
It also highlights areas where effort is best focussed to mitigate the marine risks.
The operational HAZID comparatively assessed the ma-rine risks, with emphasis on offloading operations.
It was appreciated that the limited weather vaning of the spread moored FPSO would lead to different risks for shuttle tanker operations.
The dominance of wind and current as the vessels changed draft during oil transfer needed to be carefully as-sessed.
Other areas of particular interest were the differences between the use of risers through a conventional turret, and external risers hung off the side of the spread moored vessel.
The quantitative assessments are concerned with the strength and fatigue of the mooring lines subject to uncertain environ-mental loads and mooring line strength.
Both single-line and double-line mooring failures were analyzed.
Special attention is paid to an original method, which attempts to synthesize the mooring failure probabilities contributed from all potential failing lines and environmental directions.
Introduction Two new FPSOs production facilities for the Caratinga and Barracuda fields offshore Brazil will be designed to accom-modate up to 80 and 107 risers, respectively.
The large num-ber of risers needed at the locations makes a standard turret moored system impractical.
This is because all the risers that would have to come up through the turret system, and such a large diameter turret capable of accommodating all of the riser I-tubes has yet to be developed.
As a result of this, and other factors, a spread-moored FPSO will be installed that will ac-commodate the large number of risers along the exterior of the side shell.
Spread-moored FPSOs are not uncommon; there are many operating throughout the world, particularly in West Africa, and currently other new facilities are being designed.
However, the proposed spread-moored system for the new FPSO will use a combination of relatively new approaches and materials, including combination chain/polyester mooring lines and suction piles anchors.
None of these items are unique, and all have been used at some other locations in the past.
Notwithstanding the past experience with other spread moored FPSOs, there was general interest by the Brazilian oil industry and regulatory bodies to assess the comparative risks between the spread-moored and a conventional turret moored designs, which has been the common FPSO mooring system used offshore Brazil to date.
Based on this experience, there is confidence in the conven-tional turret moored units in this region, and there is a desire to ensure that there are no undue risks associated with a spread moored system.

Related Results

Gryphon Alpha FPSO - Experience Gained During Moorings Replacement and Hook-Up
Gryphon Alpha FPSO - Experience Gained During Moorings Replacement and Hook-Up
Abstract In a North Sea storm during February 2011 the Gryphon Alpha FPSO broke four of her 10 mooring lines and moved partially off station, causing damage to su...
FPSO's Today: What is the Optimum Concept?
FPSO's Today: What is the Optimum Concept?
ABSTRACT FPSO technology over the past years has rapidly evolved from tanker based units with classical mooring systems to purpose-shaped new built vessels equipp...
FPSO EIS Results and Record of Decision
FPSO EIS Results and Record of Decision
Abstract The United States Department of the Interior (DOI), Minerals Management Service (MMS) prepared an environmental impact statement (EIS)1 to evaluate poten...
The Challenges and Opportunities of FPSO Relocations
The Challenges and Opportunities of FPSO Relocations
Abstract The first FPSO relocation project was completed 18 years ago (SBM's FPSO II), and since that time there has been a steady rise in the number and complexi...
The Sanha LPG FPSO
The Sanha LPG FPSO
Abstract The FPSO industry will soon have the first LPG FPSO in operation. The SANHA LPG FPSO is the first gas related FPSO. With the installation of the LPG FPSO...
Deepstar Study on Predicting FPSO Responses - Model Tests VS Numerical Analysis
Deepstar Study on Predicting FPSO Responses - Model Tests VS Numerical Analysis
1. ABSTRACT This paper presents the correlation study of FPSO model tests and numerical analyses sponsored by the DeepStar program. The numerical analysis results...
Reliability Centered Strategy for Mooring Integrity Management
Reliability Centered Strategy for Mooring Integrity Management
Abstract Petrobras has operated offshore production units on the Brazilian coast for over 25 years. Over time, its facilities are expected to degrade due to the vari...