Best Practices in Calibration of Integrated Production Modeling for Tengiz Field
View through CrossRef
Abstract
Petroleum Experts Integrated Production Modeling (IPM) toolkit is widely used in Tengizchevroil (TCO) for short and long term production forecasting in the Tengiz field. The short and long term models each have their own strategic focus. The short term IPM model is used for day-to-day management of field activities to ensure business plan production volumes are delivered. The long term IPM model is used to manage base business and optimize scenarios for various future development projects. The short term IPM model is validated and history matched continuously and forms the basis of the long term model to meet business objectives.
Because of the complexity of the Tengiz gathering system, close collaboration among multiple teams, systematic updates and continuous improvement of the model is required. It is also important to have an accurate temperature prediction across the entire field network to conduct flow assurance studies, optimize plant inlet temperatures and maximize plant throughput.
As a result of the implemented calibration efforts, the model predicts field production rates within 1% of the actual field performance. The model provides more granularity and higher confidence in ensuring that the plant can produce at its maximum capacity when wells are shut-in for surveillance activities, pipeline repairs and meter station (MS) shutdowns for gathering line repairs. In a long term perspective, it's crucial to have an accurate model to plan MS shutdowns for upgrades and the successful startup of major capital projects.
This paper describes model improvement initiatives, the best practices and lessons learned during the calibration process of the complex IPM model. A structured workflow for the calibration of the IPM model is also provided. The calibration steps are described in detail with relevant examples throughout the paper. This workflow can be used by IPM practitioners in other fields to construct and maintain integrated production system models.
Title: Best Practices in Calibration of Integrated Production Modeling for Tengiz Field
Description:
Abstract
Petroleum Experts Integrated Production Modeling (IPM) toolkit is widely used in Tengizchevroil (TCO) for short and long term production forecasting in the Tengiz field.
The short and long term models each have their own strategic focus.
The short term IPM model is used for day-to-day management of field activities to ensure business plan production volumes are delivered.
The long term IPM model is used to manage base business and optimize scenarios for various future development projects.
The short term IPM model is validated and history matched continuously and forms the basis of the long term model to meet business objectives.
Because of the complexity of the Tengiz gathering system, close collaboration among multiple teams, systematic updates and continuous improvement of the model is required.
It is also important to have an accurate temperature prediction across the entire field network to conduct flow assurance studies, optimize plant inlet temperatures and maximize plant throughput.
As a result of the implemented calibration efforts, the model predicts field production rates within 1% of the actual field performance.
The model provides more granularity and higher confidence in ensuring that the plant can produce at its maximum capacity when wells are shut-in for surveillance activities, pipeline repairs and meter station (MS) shutdowns for gathering line repairs.
In a long term perspective, it's crucial to have an accurate model to plan MS shutdowns for upgrades and the successful startup of major capital projects.
This paper describes model improvement initiatives, the best practices and lessons learned during the calibration process of the complex IPM model.
A structured workflow for the calibration of the IPM model is also provided.
The calibration steps are described in detail with relevant examples throughout the paper.
This workflow can be used by IPM practitioners in other fields to construct and maintain integrated production system models.
Related Results
(Invited) Strategies for Calibration Cost Reduction in Heterogeneous Chemical Sensor Arrays
(Invited) Strategies for Calibration Cost Reduction in Heterogeneous Chemical Sensor Arrays
Introduction
Heterogeneous gas sensor arrays coupled with machine learning algorithms have been proposed for a wide range of applications. However, i...
IPM Tool for Strategic Decisions: Diverse Applications of IPM in the Supergiant Tengiz Field
IPM Tool for Strategic Decisions: Diverse Applications of IPM in the Supergiant Tengiz Field
Abstract
Integrated Production Modeling (IPM) is probably the most popular suite of software for production optimization and planning. It affords the opportunity ...
Application of the Wellbore Imaging Tools in Tengiz Field
Application of the Wellbore Imaging Tools in Tengiz Field
Abstract
This paper provides an overview of the borehole imaging tools (BIT) run in the Tengiz-Korolev field giant carbonate reservoirs located in Western Kazakhstan...
Radiometric cross-calibration of Sentinel-2B MSI with HY-1C SCS based on the near simultaneous imaging of common ground targets
Radiometric cross-calibration of Sentinel-2B MSI with HY-1C SCS based on the near simultaneous imaging of common ground targets
To simplify the cross-calibration process and improve calibration frequency and accuracy, this paper proposes a cross-calibration method for the multispectral remote sensor Multi-S...
Closed Hole Circulation Drilling: Case Study of Drilling a High-Pressure Fractured Reservoir - Tengiz Field, Tengiz, Republic of Kazakhstan
Closed Hole Circulation Drilling: Case Study of Drilling a High-Pressure Fractured Reservoir - Tengiz Field, Tengiz, Republic of Kazakhstan
Abstract
The drilling of a sour, high-pressure fractured reservoir in the Tengiz field of Kazakhstan displayed complex and hazardous well control situations. Whil...
Analysis of Depositional Environment within Karaton-Tengiz Uplift Zone in Southeastern Part of the Pre-Caspian Basin
Analysis of Depositional Environment within Karaton-Tengiz Uplift Zone in Southeastern Part of the Pre-Caspian Basin
Abstract
The present paper describes the results of analysis of depositional environment and tectonic setting within Karaton-Tengiz uplift zone in the southeastern p...
Automatic Hand-Eye Calibration Method of Welding Robot Based on Linear Structured Light
Automatic Hand-Eye Calibration Method of Welding Robot Based on Linear Structured Light
Aiming at solving the problems such as long calibration time, low precision, and complex operation in hand-eye calibration of welding robot, an automatic hand-eye calibration algor...
Quantitative Assessment of Vertical and Horizontal Deformations Derived by 3D and 2D Decompositions of InSAR Line-of-Sight Measurements to Supplement Industry Surveillance Programs in the Tengiz Oilfield (Kazakhstan)
Quantitative Assessment of Vertical and Horizontal Deformations Derived by 3D and 2D Decompositions of InSAR Line-of-Sight Measurements to Supplement Industry Surveillance Programs in the Tengiz Oilfield (Kazakhstan)
This research focused on the quantitative assessment of the surface deformation velocities and rates and their natural and man-made controlling factors at Tengiz Oilfield in Kazakh...