Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

PERANCANGAN SISTEM PLAMBING PADA BANGUNAN WISMA MESS SEPOLWAN CIPUTAT

View through CrossRef
The construction of high-rise buildings in big cities is currently increasing rapidly, before the building is built, it is necessary to plan a plumbing system to meet the needs of water supply for daily needs in buildings and waste water disposal. In planning the plumbing of Wisma Mess Sepolwan 3 floors, the need for clean water is 28.92 m3/day, the GWT (Ground Water Tank) bottom tank capacity is 6.5 m3/day, the top tank capacity (Roof Tank) is 5.4 m3/day and the sewer tank 25 m3/day.The transfer of clean water from the ground water tank to the top water tank (roof tank) uses a transfer pump with a capacity of 5.4 m3/minute, pump head of 39.64 m. Fordistribution of clean water on 3 floors using a pressure booster pump with a capacity of 0.16 m3/minute and a pump head of 10.3 m.Transfer of clean water from the bottom water tank (Ground Water Tank) to the top water tank (Roof Tank) using a pipe size of 40 mm. The design of the diameter of the clean water distribution pipe for each floor gets a size of 150 mm diameter of the main pipe / water main pipe and 50 mm per floor.The design of the diameter of the sewerage pipe from (closet and toilet) size to the standpipe for each floor is 100 mm and the diameter of the riser standpipe is 150 mm. The design of the diameter of the waste water pipe from (hand sinks and traps) to the size of the standpipe for each floor is 80 mm and the diameter of the riser standpipe is 100 mm. The design of the vent pipe diameter for the size of the standpipe for each floor is 50 mm and the diameter of the riser standpipe is 80 mm
Fakultas Teknik Universitas Satya Negara Indonesia
Title: PERANCANGAN SISTEM PLAMBING PADA BANGUNAN WISMA MESS SEPOLWAN CIPUTAT
Description:
The construction of high-rise buildings in big cities is currently increasing rapidly, before the building is built, it is necessary to plan a plumbing system to meet the needs of water supply for daily needs in buildings and waste water disposal.
In planning the plumbing of Wisma Mess Sepolwan 3 floors, the need for clean water is 28.
92 m3/day, the GWT (Ground Water Tank) bottom tank capacity is 6.
5 m3/day, the top tank capacity (Roof Tank) is 5.
4 m3/day and the sewer tank 25 m3/day.
The transfer of clean water from the ground water tank to the top water tank (roof tank) uses a transfer pump with a capacity of 5.
4 m3/minute, pump head of 39.
64 m.
Fordistribution of clean water on 3 floors using a pressure booster pump with a capacity of 0.
16 m3/minute and a pump head of 10.
3 m.
Transfer of clean water from the bottom water tank (Ground Water Tank) to the top water tank (Roof Tank) using a pipe size of 40 mm.
The design of the diameter of the clean water distribution pipe for each floor gets a size of 150 mm diameter of the main pipe / water main pipe and 50 mm per floor.
The design of the diameter of the sewerage pipe from (closet and toilet) size to the standpipe for each floor is 100 mm and the diameter of the riser standpipe is 150 mm.
The design of the diameter of the waste water pipe from (hand sinks and traps) to the size of the standpipe for each floor is 80 mm and the diameter of the riser standpipe is 100 mm.
The design of the vent pipe diameter for the size of the standpipe for each floor is 50 mm and the diameter of the riser standpipe is 80 mm.

Related Results

Standar Keselamatan dan Kesehatan Kerja (K3) Wisma Arimbi dan Wisma Bima Rumah Sakit Jiwa Grhasia Daerah Istimewa Yogyakarta
Standar Keselamatan dan Kesehatan Kerja (K3) Wisma Arimbi dan Wisma Bima Rumah Sakit Jiwa Grhasia Daerah Istimewa Yogyakarta
The implementation of hospital occupational health and safety service standards at Wisma Arimbi and Wisma Bima is still not optimal because there are still hospital occupational he...
ARSITEKTUR KONTEKSTUAL PADA RANCANGAN BANGUNAN GALERI NASIONAL INDONESIA
ARSITEKTUR KONTEKSTUAL PADA RANCANGAN BANGUNAN GALERI NASIONAL INDONESIA
Pada tahun 2013, Galeri Nasional Indonesia bersama dengan Ikatan Arsitek Indonesia Jakarta menggagas pengembangan bangunan Galeri Nasional Indonesia bersamaan dengan rencana utama ...
MODERNISASI PASAR CIPUTAT MELALUI PROGRAM REVITALISASI PASAR
MODERNISASI PASAR CIPUTAT MELALUI PROGRAM REVITALISASI PASAR
Berdasarkan pelaksanaan revitalisasi Pasar Ciputat pada Peraturan Walikota No. 32 Tahun 2015 tentang pengelolaan dan pemberdayaan pasar tradisional masih ditemukannya permasalahan ...
Evaluasi Kesesuaian Pola Bangunan Lembaga Pembinaan Khusus Anak dan Lembaga Pemasyarakatan Perempuan
Evaluasi Kesesuaian Pola Bangunan Lembaga Pembinaan Khusus Anak dan Lembaga Pemasyarakatan Perempuan
Fungsi dan Tujuan dari pendirian Lembaga Pemasyarakatan menjadikan pembangunannya tak dapat dilakukan secara asal, diperlukan standar dan standarisasi agar bangunan Lembaga Pemasya...
Analisis Kehilangan Energi pada Berbagai Bentuk Bangunan Peralihan
Analisis Kehilangan Energi pada Berbagai Bentuk Bangunan Peralihan
AbstrakSaluran terbuka adalah aliran di saluran dimana air mengalir dengan permukan bebas. Pada saluran terbuka, umum ditemukan bangunan pelestarian. Khusunya pada jaringan irigasi...
KOMPOSISI FASAD WISMA KILANG SEBAGAI BASIS REKONSTRKSI ARSITEKTUR JENGKI DI BALIKPAPAN
KOMPOSISI FASAD WISMA KILANG SEBAGAI BASIS REKONSTRKSI ARSITEKTUR JENGKI DI BALIKPAPAN
Arsitektur jengki merupakan gaya arsitektur modern yang berkembang di Indonesia pada periode tahun 1950 hingga 1960. Salah satu peninggalan arsitektur jengki ini Adalah Wisma Kilan...
PERAN PEKERJA SOSIAL DALAM PELAYANAN REHABILITASI SOSIAL DI WISMA LANSIA HARAPAN ASRI KOTA SEMARANG
PERAN PEKERJA SOSIAL DALAM PELAYANAN REHABILITASI SOSIAL DI WISMA LANSIA HARAPAN ASRI KOTA SEMARANG
Penelitian ini bertujuan untuk mendeskripsikan : (1) Peran pekerja sosial dalam pelayanan rehabilitasi sosial  di Wisma Lansia Harapan Asri, (2) Faktor pendukung dan penghambat pel...

Back to Top