Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Integrated Hub Roadmap Adds 18 Years to Operational Life: Case Study from Gas Hub in Sarawak

View through CrossRef
Abstract One of the key objectives for late field life management is aimed at unlocking production volumes below pipeline turndown rate (TDR). This can be achieved through new subsurface opportunities to keep total hub production above TDR and through operational management strategy to unlock below TDR volumes. This paper presents a reflection of technical studies conducted to extend hub production life and value creation for all stakeholders through technical due diligence, cost compression and operational excellence strategies. Hub-A caters to production from two carbonate gas fields in Sarawak region and needs to maintain total production >120 MMscf/d to meet pipeline TDR. The hub was expected to go below TDR in Year-2022 and to sustain the hub production beyond 2022, attic gas volumes in one of the feeder fields were identified for future development to potentially add incremental gas production to the hub and extend operational life by 2.5 years. However, based on techno-commercial assessment, the project wasn't considered viable for development. Additionally, recent production performance indicated sharp increase in water-gas ratio from existing fields with the outlook indicating an early timeline for hub production to go below TDR. This necessitated several surface studies to be commissioned for hub protection with the primary objective of assessing technical feasibility to continue production below TDR limit. These studies focused on flow assurance studies for main trunkline & satellite pipelines, corrosion study for pipeline remnant life assessment, operating philosophy for production management and capacity assessment for onshore facilities. For long-term roadmap, future gas feeders were also identified for hub sustenance beyond cessation of production from existing fields. With the implementation of short-term and long-term production strategy as part of operation & management philosophy, ~26 MMboe of below TDR volumes from existing fields are expected to be unlocked and the hub producing life is expected to be extended by >6 years with significant reduction in operational expenditure. Additionally, exploration roadmap has been strategized in synergy with hub outlook to provide long-term gas supply until 2040. This is expected to generate significant value through continued revenue generation and keeping the hub in operable conditions for future tie-ins from new feeders and nearby gas field developments. This paper presents novel operational strategy to unlock below pipeline TDR volumes for late field life management and integrated roadmap development for long-term value creation with synergy across exploration and development portfolio in the region.
Title: Integrated Hub Roadmap Adds 18 Years to Operational Life: Case Study from Gas Hub in Sarawak
Description:
Abstract One of the key objectives for late field life management is aimed at unlocking production volumes below pipeline turndown rate (TDR).
This can be achieved through new subsurface opportunities to keep total hub production above TDR and through operational management strategy to unlock below TDR volumes.
This paper presents a reflection of technical studies conducted to extend hub production life and value creation for all stakeholders through technical due diligence, cost compression and operational excellence strategies.
Hub-A caters to production from two carbonate gas fields in Sarawak region and needs to maintain total production >120 MMscf/d to meet pipeline TDR.
The hub was expected to go below TDR in Year-2022 and to sustain the hub production beyond 2022, attic gas volumes in one of the feeder fields were identified for future development to potentially add incremental gas production to the hub and extend operational life by 2.
5 years.
However, based on techno-commercial assessment, the project wasn't considered viable for development.
Additionally, recent production performance indicated sharp increase in water-gas ratio from existing fields with the outlook indicating an early timeline for hub production to go below TDR.
This necessitated several surface studies to be commissioned for hub protection with the primary objective of assessing technical feasibility to continue production below TDR limit.
These studies focused on flow assurance studies for main trunkline & satellite pipelines, corrosion study for pipeline remnant life assessment, operating philosophy for production management and capacity assessment for onshore facilities.
For long-term roadmap, future gas feeders were also identified for hub sustenance beyond cessation of production from existing fields.
With the implementation of short-term and long-term production strategy as part of operation & management philosophy, ~26 MMboe of below TDR volumes from existing fields are expected to be unlocked and the hub producing life is expected to be extended by >6 years with significant reduction in operational expenditure.
Additionally, exploration roadmap has been strategized in synergy with hub outlook to provide long-term gas supply until 2040.
This is expected to generate significant value through continued revenue generation and keeping the hub in operable conditions for future tie-ins from new feeders and nearby gas field developments.
This paper presents novel operational strategy to unlock below pipeline TDR volumes for late field life management and integrated roadmap development for long-term value creation with synergy across exploration and development portfolio in the region.

Related Results

Peranan Badan Mubaligh Kristian dalam Perkembangan Pendidikan Formal Wanita di Sarawak, 1848–1930
Peranan Badan Mubaligh Kristian dalam Perkembangan Pendidikan Formal Wanita di Sarawak, 1848–1930
In Sarawak, the Christian missionaries carried out their Christianisation by establishing missionary schools. Through the establishment of the missionary school, they not only want...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
The Emergence of E-Wallet in Sarawak: Factors Influencing the Adoption of Sarawak Pay
The Emergence of E-Wallet in Sarawak: Factors Influencing the Adoption of Sarawak Pay
This paper discusses the adoption factors of electronic wallet, more specifically Sarawak Pay in Kuching, Sarawak. The Sarawak Government has a very aggressive mandate in terms of ...
Perjuangan Wanita dalam Gerakan Anti Penyerahan 1946-1950
Perjuangan Wanita dalam Gerakan Anti Penyerahan 1946-1950
Pada 1 Julai 1946, Sarawak dengan rasminya diisytiharkan sebagai tanah jajahan kolonial British.1 Akibatnya, muncul fenomena anti penyerahan yang berlaku di seluruh Sarawak. Antara...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract Introduction Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Manager Of Supply Planning And Projects
Manager Of Supply Planning And Projects
Abstract The Southern California Gas Company is responsible for providing gas service to 12 million southern Californians. SoCal Gas, like other major gas distrib...

Back to Top