Successful Application of Cased and Perforated Completions in Deepwater
View through CrossRef
Abstract
Most deepwater high rate wells are completed with sand control to avoid sanding issues, especially for a subsea development. However, sand control adds significant Capex to the development besides causing additional pressure drop across the completion. In addition, experiences to date have shown that sand control completions tend to increase in mechanical skin over time due to solids plugging or scaling leading to additional Opex required to stimulate these wells.
This paper describes the key steps taken for two major subsea deepwater developments in Ghana, in order for a paradigm shift towards Cased and Perforated (C&P) completions for full field implementation. Oil production and water injection in both fields are primarily from sand facies associated with Clustered Frontal Splays and Confined Channel Complex. All completions deployed initially were equipped with downhole sand control (mainly Frac and Packs), but driven by well impairment issues early in field life, a thorough review of completion type was initiated which lead to a staged implementation and move towards C&P design for all high rate oil producer and water injector wells.
Modified API RP 19-B Section IV tests were performed using core material from the fields for catastrophic sanding risk evaluation over well lifecycle, and examination of sanding under steady state flow conditions with varying fluid type. Laboratory test results and simulation data were then used to determine safe operating envelopes for the designs. A staged implementation commenced with C&P completions in two wells with the use of High Set Screens (HSS) with capability of bypassing the screens if required and ‘real-time’ downhole gauges to monitor pressure drop across the screens over time. Based on the confidence attained from the sand free production data from both these wells, HSS were removed altogether from subsequent completions.
Well performance data have demonstrated the successful application of C&P completions in typical deepwater turbidite setting. C&P completions have significantly lower skin than other completion types applied in the same fields and are capable of delivering more than 20,000 stb/d oil rates and more than 50,000 b/d water injection rates.
Title: Successful Application of Cased and Perforated Completions in Deepwater
Description:
Abstract
Most deepwater high rate wells are completed with sand control to avoid sanding issues, especially for a subsea development.
However, sand control adds significant Capex to the development besides causing additional pressure drop across the completion.
In addition, experiences to date have shown that sand control completions tend to increase in mechanical skin over time due to solids plugging or scaling leading to additional Opex required to stimulate these wells.
This paper describes the key steps taken for two major subsea deepwater developments in Ghana, in order for a paradigm shift towards Cased and Perforated (C&P) completions for full field implementation.
Oil production and water injection in both fields are primarily from sand facies associated with Clustered Frontal Splays and Confined Channel Complex.
All completions deployed initially were equipped with downhole sand control (mainly Frac and Packs), but driven by well impairment issues early in field life, a thorough review of completion type was initiated which lead to a staged implementation and move towards C&P design for all high rate oil producer and water injector wells.
Modified API RP 19-B Section IV tests were performed using core material from the fields for catastrophic sanding risk evaluation over well lifecycle, and examination of sanding under steady state flow conditions with varying fluid type.
Laboratory test results and simulation data were then used to determine safe operating envelopes for the designs.
A staged implementation commenced with C&P completions in two wells with the use of High Set Screens (HSS) with capability of bypassing the screens if required and ‘real-time’ downhole gauges to monitor pressure drop across the screens over time.
Based on the confidence attained from the sand free production data from both these wells, HSS were removed altogether from subsequent completions.
Well performance data have demonstrated the successful application of C&P completions in typical deepwater turbidite setting.
C&P completions have significantly lower skin than other completion types applied in the same fields and are capable of delivering more than 20,000 stb/d oil rates and more than 50,000 b/d water injection rates.
Related Results
Selecting Seal Materials for Deepwater Completions
Selecting Seal Materials for Deepwater Completions
Abstract
A variety of seal materials have been used in downhole completions since the first cement plug was invented circa 1924. That first plug had a canvas wrap...
The Future of Regulations for the Deepwater GOM
The Future of Regulations for the Deepwater GOM
Abstract
Deepwater oil and gas activities in the U.S. Gulf of Mexico Outer ContinentalShelf (OCS) are regulated by the Minerals Management Service (MMS). The leve...
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
Abstract
The extensive industry experience with design, fabrication, installation, and operation of TLPs in water depths up to 4,000 ft has demonstrated the flexi...
SS: Thunder Horse and Atlantis Deepwater Frontier Developments in the Gulf of Mexico" Paper Title - Deepwater Completions: The Devil is in the Details
SS: Thunder Horse and Atlantis Deepwater Frontier Developments in the Gulf of Mexico" Paper Title - Deepwater Completions: The Devil is in the Details
Abstract
BP's Thunder Horse and Atlantis completions are some of the most complex in the world. This complexity is both a basic requirement of the environment and...
Cased Hole Production Testing with Extended Spacing Wireline Formation Testers
Cased Hole Production Testing with Extended Spacing Wireline Formation Testers
Abstract
Wireline formation testing in open hole can yield robust and reliable information about reservoir fluid type and productivity. However, operational or logis...
New Area Development Strategy for Duri Field: Evaluation of Gravel Pack / Frac Pack
New Area Development Strategy for Duri Field: Evaluation of Gravel Pack / Frac Pack
Abstract
There are numerous technical papers and supporters of both cased-hole frac pack (CHFP) and open-hole gravel pack (OHGP) completions. There are even suppo...
An Innovative Solution for Maximizing Productivity from Perforated Completions
An Innovative Solution for Maximizing Productivity from Perforated Completions
Abstract
Inadequate flow efficiency in perforated wells in cased-hole completions has been a major concern in the oilfield since the first use of perforating gun sys...
The Deep Star Project: An Overview Of Industry Cooperation
The Deep Star Project: An Overview Of Industry Cooperation
ABSTRACT
Texaco's vision for development of the deepwater in the Gulf of Mexico is closely tied to the concept of cooperation and evolution of a synergistic relat...