Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

FPSO Offloading Concepts, their Nautical Feasibility and Safety Assessment

View through CrossRef
Introduction For the development of offshore deepwater oil or gas re-sources more often F(P)SOs, Floating (Production) Storage Offloading units are applied. For the export of oil (or gas) from the FPSO tankers are used. In the design of a FPSO various options are available for offloading: tandem from a turret moored or spread moored FPSO, tandem from a Single-Point-mooring (SPM) or side by side from a turret moored FPSO. The technical design, but also the nautical operations are highly affected by the choice of the offloading system. Aspects that are affected are:Weather downtime, which effects the overall economic performance of the FPSO;Safety of day-to-day operations, which requires clear procedures, trained personnel and the right type of equipment;Controllability and response in case of emergencies;The overall safety of the operations, the probability of a collision and the related collision energy. All these aspects play a role from day one of the design of an offloading facility until the facility becomes operational. In this paper we will show how various tools, together with experience and common sense can help to take decisions and to prepare people for the offloading job ahead. The paper can be divided in the following main sections:Nautical considerations in the design of an offloading facilityFast-time manoeuvring simulations: operational limits and procedures;QRA, Quantitative Risk Assessment;Real time simulations and training;Conclusions. Nautical considerations in the development of an offloading facility Nautical aspects play a role throughout the development of the F(P)SO. Three phases can be distinguished in this development:Phase 1: Pre-design: selection of concept, selection of location;Phase 2: Design;Phase 3: Implementation and operation. The tools/methods available for the evaluation of the nautical aspects are:Static computations;Fast-time simulations of normal operations;Fast-time simulations of emergency situations;Quantitative Risk Assessment;Real time simulations. The applicability of the various tools in the various development phases is shown in Figure 1, below Figure 1 Tool or methodology to be applied during various development phases (available in full paper) In this first phase: (Pre-design: selection of concept, se-lection of location), the design will focus on the selection of the offloading facility and the selection of the site. Aspects that play a role are, amongst many others, the environmental conditions, type and size of the offloading tanker and the assistance of tugs. Reliable statistics regarding the local climate: e.g.: wind, current and waves are essential to make a reliable evaluation of the various options. In this first phase the methodology for the evaluation of the various concepts is kept simple to be able to make a fast comparison. Experience in combination with static computations or fast-time simulations are the most likely tools to be used.
Title: FPSO Offloading Concepts, their Nautical Feasibility and Safety Assessment
Description:
Introduction For the development of offshore deepwater oil or gas re-sources more often F(P)SOs, Floating (Production) Storage Offloading units are applied.
For the export of oil (or gas) from the FPSO tankers are used.
In the design of a FPSO various options are available for offloading: tandem from a turret moored or spread moored FPSO, tandem from a Single-Point-mooring (SPM) or side by side from a turret moored FPSO.
The technical design, but also the nautical operations are highly affected by the choice of the offloading system.
Aspects that are affected are:Weather downtime, which effects the overall economic performance of the FPSO;Safety of day-to-day operations, which requires clear procedures, trained personnel and the right type of equipment;Controllability and response in case of emergencies;The overall safety of the operations, the probability of a collision and the related collision energy.
All these aspects play a role from day one of the design of an offloading facility until the facility becomes operational.
In this paper we will show how various tools, together with experience and common sense can help to take decisions and to prepare people for the offloading job ahead.
The paper can be divided in the following main sections:Nautical considerations in the design of an offloading facilityFast-time manoeuvring simulations: operational limits and procedures;QRA, Quantitative Risk Assessment;Real time simulations and training;Conclusions.
Nautical considerations in the development of an offloading facility Nautical aspects play a role throughout the development of the F(P)SO.
Three phases can be distinguished in this development:Phase 1: Pre-design: selection of concept, selection of location;Phase 2: Design;Phase 3: Implementation and operation.
The tools/methods available for the evaluation of the nautical aspects are:Static computations;Fast-time simulations of normal operations;Fast-time simulations of emergency situations;Quantitative Risk Assessment;Real time simulations.
The applicability of the various tools in the various development phases is shown in Figure 1, below Figure 1 Tool or methodology to be applied during various development phases (available in full paper) In this first phase: (Pre-design: selection of concept, se-lection of location), the design will focus on the selection of the offloading facility and the selection of the site.
Aspects that play a role are, amongst many others, the environmental conditions, type and size of the offloading tanker and the assistance of tugs.
Reliable statistics regarding the local climate: e.
g.
: wind, current and waves are essential to make a reliable evaluation of the various options.
In this first phase the methodology for the evaluation of the various concepts is kept simple to be able to make a fast comparison.
Experience in combination with static computations or fast-time simulations are the most likely tools to be used.

Related Results

FPSO EIS Results and Record of Decision
FPSO EIS Results and Record of Decision
Abstract The United States Department of the Interior (DOI), Minerals Management Service (MMS) prepared an environmental impact statement (EIS)1 to evaluate poten...
TRELLINE? A Cost-Effective Alternative for Oil Offloading Lines (OOLs)
TRELLINE? A Cost-Effective Alternative for Oil Offloading Lines (OOLs)
Abstract For large offshore fields in benign conditions like West Africa a common field development option is a Spread Moored Floating Production Storage & Of...
FPSO's Today: What is the Optimum Concept?
FPSO's Today: What is the Optimum Concept?
ABSTRACT FPSO technology over the past years has rapidly evolved from tanker based units with classical mooring systems to purpose-shaped new built vessels equipp...
The Challenges and Opportunities of FPSO Relocations
The Challenges and Opportunities of FPSO Relocations
Abstract The first FPSO relocation project was completed 18 years ago (SBM's FPSO II), and since that time there has been a steady rise in the number and complexi...
Floating Production, Storage, and Offloading Systems in the Gulf of Mexico OCS: A Regulatory Perspective
Floating Production, Storage, and Offloading Systems in the Gulf of Mexico OCS: A Regulatory Perspective
Abstract Floating Production, Storage, and Offloading (FPSO) systems represent an untested technology in the U.S. Gulf of Mexico (GOM) Outer Continental Shelf. Th...
The Sanha LPG FPSO
The Sanha LPG FPSO
Abstract The FPSO industry will soon have the first LPG FPSO in operation. The SANHA LPG FPSO is the first gas related FPSO. With the installation of the LPG FPSO...
Floating Hose Behavior During Different Scenarios of an Offloading Operation
Floating Hose Behavior During Different Scenarios of an Offloading Operation
Abstract Considering the deep water oil exploitation in remote fields far away from the coast, the use of shuttle tankers connected to FPSOs (Floating, Production, S...

Back to Top