Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

TRELLINE? A Cost-Effective Alternative for Oil Offloading Lines (OOLs)

View through CrossRef
Abstract For large offshore fields in benign conditions like West Africa a common field development option is a Spread Moored Floating Production Storage & Offloading (FPSO) vessel. Their large production rate requires weekly offloading operations which, for the sake of efficiency, reliability and safety, are performed via an offloading system with a Single Point Mooring (SPM) terminal. In deepwater there were until recently two types of Oil Offloading Lines (OOLs) connecting the FPSO to the SPM: steel pipe or un-bonded flexible pipe. Now another type of OOL is available, that is cost effective. Compared to un-bonded flexible pipe that is continuous and limited in diameter (up to 18.7 inch ID), the Trelline system is made of 12 m (about 40 foot) long hoses that can be transported in stackable pallets by conventional transportation vessels instead of expensive specialised vessels. Compared to both un-bonded flexible and steel pipes, the TrellineTM system can be installed using a light installation spread instead of expensive and over-booked specialised installation vessels. The TrellineTM system enables optimization of SPM offloading systems that leads to significant overall cost reductions for deepwater and high throughput. SBM and Trelleborg have jointly developed and qualified the Trelline?system that, in 1Q-06, was grated the API 17K Type Approval Certificate for internal diameters ranging from 18‘ to 26’. The TrellineTM hoses should also receive the API Monogram as from 3Q-06. This paper details the conclusion of the successful process that has led to the TrellineTM system now being fully qualified for the Deepwater Oil Offloading Line (OOL) application. Introduction The discovery of giant fields in deepwater off the West coast of Africa has led to a series of field development schemes (e.g. Girassol, Bonga, Kizomba A, Kizomba B, Ehra, Dalia, Agbami, Greater Plutonio, etc). The choice of surface facilities is a large spread moored FPSO with around 2 Millions bbl storage capacity, and around 200,000 bbl/day of oil production. In view of the high production level, the economical viability of such development schemes requires an offloading system capable of exporting parcels of about 1 million bbls every 5-6 days. To fulfill these requirements, with a high level of safety in marine operations the offloading system is a Single Point Mooring (SPM) Terminal that can safely berth large (up to 350 kDWT) export tankers. This is because of the fact that due to regular but un-predictable squall events, tandem offloading from a spread moored FPSO is considered too hazardous and unreliable for such a critical operation. Instead, by using an SPM, the export tankers can weathervane around the buoy during the full duration of offloading operations (1 to 2 days). As the SPM terminal is usually 1 nautical mile away from the FPSO, the Oil Offloading Lines (OOLs) need to be of the largest diameter practical to minimize the pressure drop and consequently reduce the booster pump requirement on the FPSO.
Title: TRELLINE? A Cost-Effective Alternative for Oil Offloading Lines (OOLs)
Description:
Abstract For large offshore fields in benign conditions like West Africa a common field development option is a Spread Moored Floating Production Storage & Offloading (FPSO) vessel.
Their large production rate requires weekly offloading operations which, for the sake of efficiency, reliability and safety, are performed via an offloading system with a Single Point Mooring (SPM) terminal.
In deepwater there were until recently two types of Oil Offloading Lines (OOLs) connecting the FPSO to the SPM: steel pipe or un-bonded flexible pipe.
Now another type of OOL is available, that is cost effective.
Compared to un-bonded flexible pipe that is continuous and limited in diameter (up to 18.
7 inch ID), the Trelline system is made of 12 m (about 40 foot) long hoses that can be transported in stackable pallets by conventional transportation vessels instead of expensive specialised vessels.
Compared to both un-bonded flexible and steel pipes, the TrellineTM system can be installed using a light installation spread instead of expensive and over-booked specialised installation vessels.
The TrellineTM system enables optimization of SPM offloading systems that leads to significant overall cost reductions for deepwater and high throughput.
SBM and Trelleborg have jointly developed and qualified the Trelline?system that, in 1Q-06, was grated the API 17K Type Approval Certificate for internal diameters ranging from 18‘ to 26’.
The TrellineTM hoses should also receive the API Monogram as from 3Q-06.
This paper details the conclusion of the successful process that has led to the TrellineTM system now being fully qualified for the Deepwater Oil Offloading Line (OOL) application.
Introduction The discovery of giant fields in deepwater off the West coast of Africa has led to a series of field development schemes (e.
g.
Girassol, Bonga, Kizomba A, Kizomba B, Ehra, Dalia, Agbami, Greater Plutonio, etc).
The choice of surface facilities is a large spread moored FPSO with around 2 Millions bbl storage capacity, and around 200,000 bbl/day of oil production.
In view of the high production level, the economical viability of such development schemes requires an offloading system capable of exporting parcels of about 1 million bbls every 5-6 days.
To fulfill these requirements, with a high level of safety in marine operations the offloading system is a Single Point Mooring (SPM) Terminal that can safely berth large (up to 350 kDWT) export tankers.
This is because of the fact that due to regular but un-predictable squall events, tandem offloading from a spread moored FPSO is considered too hazardous and unreliable for such a critical operation.
Instead, by using an SPM, the export tankers can weathervane around the buoy during the full duration of offloading operations (1 to 2 days).
As the SPM terminal is usually 1 nautical mile away from the FPSO, the Oil Offloading Lines (OOLs) need to be of the largest diameter practical to minimize the pressure drop and consequently reduce the booster pump requirement on the FPSO.

Related Results

Confidence Guides Spontaneous Cognitive Offloading
Confidence Guides Spontaneous Cognitive Offloading
Background: Cognitive offloading is the use of physical action to reduce the cognitive demands of a task. Everyday memory relies heavily on this practice, for example when we write...
Towards computational offloading in mobile device clouds
Towards computational offloading in mobile device clouds
With the rise in mobile device adoption, and growth in mobile application market expected to reach $30 billion by the end of 2013, mobile user expectations for pervasive computatio...
Computational Offloading in Mobile Edge with Comprehensive and Energy Efficient Cost Function: A Deep Learning Approach
Computational Offloading in Mobile Edge with Comprehensive and Energy Efficient Cost Function: A Deep Learning Approach
In mobile edge computing (MEC), partial computational offloading can be intelligently investigated to reduce the energy consumption and service delay of user equipment (UE) by divi...
Floating Hose Behavior During Different Scenarios of an Offloading Operation
Floating Hose Behavior During Different Scenarios of an Offloading Operation
Abstract Considering the deep water oil exploitation in remote fields far away from the coast, the use of shuttle tankers connected to FPSOs (Floating, Production, S...
Cognitive Offloading: Systematic Review of a Decade
Cognitive Offloading: Systematic Review of a Decade
Cognitive offloading refers to the use of physical action to alter information processing requirement of the given task. Offloading can be done either internally or externally. We ...
Shuttle Tankers in the Oil Export of Cascade and Chinook Fields
Shuttle Tankers in the Oil Export of Cascade and Chinook Fields
Abstract This paper is based on the work performed during the offloading operations in the Cascade and Chinook fields in Ultra Deep Waters of the U.S. Gulf of Mex...
Metacognitive training facilitates optimal cognitive offloading
Metacognitive training facilitates optimal cognitive offloading
Cognitive offloading refers to the use of physical action and the externalenvironment to reduce cognitive demand. Offloading strategies such as creatingexternal reminders instead o...
SRA-E-ABCO: Terminal Task Offloading for Cloud-Edge-End Environments
SRA-E-ABCO: Terminal Task Offloading for Cloud-Edge-End Environments
Abstract With the rapid development of Internet technology, the cloud-edge-end computing model has gradually become an essential new computing model. Under this model, term...

Back to Top