The stress-strain state of crane structures damaged during operation
View through CrossRef
During operation, crane structures are subject to multidirectional impacts: movement of the crane along the crane track, braking of the crane bridge directed along the crane rail, braking of the crane trolley directed perpendicular to the crane rail. This creates alternating stresses that can cause fatigue failure. In the elements of overhead crane beams and brake structures, fatigue cracks appear and gradually develop, which can ultimately lead to the complete failure of the structures. Another reason for the onset of the limit state of crane structures may be mechanical damage (wear of rubbing parts) and contact with an aggressive environment (corrosion). The aim of the work is to establish patterns of failure occurrence, study the influence of external and internal factors on reliability, establish quantitative characteristics and methods for assessing the reliability of crane structures. For this purpose, it is proposed to develop effective methods for calculating crane structures that have been damaged during operation, taking into account the specifics of the impacts on them and the properties of materials using CAE packages.
Moscow State University of Civil Engineering
Title: The stress-strain state of crane structures damaged during operation
Description:
During operation, crane structures are subject to multidirectional impacts: movement of the crane along the crane track, braking of the crane bridge directed along the crane rail, braking of the crane trolley directed perpendicular to the crane rail.
This creates alternating stresses that can cause fatigue failure.
In the elements of overhead crane beams and brake structures, fatigue cracks appear and gradually develop, which can ultimately lead to the complete failure of the structures.
Another reason for the onset of the limit state of crane structures may be mechanical damage (wear of rubbing parts) and contact with an aggressive environment (corrosion).
The aim of the work is to establish patterns of failure occurrence, study the influence of external and internal factors on reliability, establish quantitative characteristics and methods for assessing the reliability of crane structures.
For this purpose, it is proposed to develop effective methods for calculating crane structures that have been damaged during operation, taking into account the specifics of the impacts on them and the properties of materials using CAE packages.
Related Results
Operational Dynamics Of An Offshore Crane
Operational Dynamics Of An Offshore Crane
Abstract
A computational method is described for calculating the detailed dynamics of fixed offshore platform cranes based on finite element techniques. The metho...
Crane Load Moment System For Offshore Crane Operations
Crane Load Moment System For Offshore Crane Operations
Abstract
History has shown that dependency upon the crane operator to monitor loads and boom angle or load radius do not allow the margin necessary to perform the...
Causes of crane safety risk in the Vietnamese construction industry
Causes of crane safety risk in the Vietnamese construction industry
Crane is one of the most important machineries in the construction field. They are used to move large or heavy loads on most construction sites. However, crane operations in constr...
Dynamic analysis of the joint movement of derricking mechanism and lifting mechanism of a load during a steady-state turn of a jib crane
Dynamic analysis of the joint movement of derricking mechanism and lifting mechanism of a load during a steady-state turn of a jib crane
Increasing the productivity of jib cranes is an urgent problem of improving their operation. Combining the work of separate mechanisms is one of the ways to increase the productivi...
OPTIMALISASI LETAK TOWER CRANE TERHADAP WAKTU SIKLUS PADA PROYEK Y
OPTIMALISASI LETAK TOWER CRANE TERHADAP WAKTU SIKLUS PADA PROYEK Y
In a construction project, there are various kinds of very complex activities. Therefore, heavy equipment, especially Tower Cranes is used to assist the work on the construction pr...
RANCANG BANGUN SISTEM PAKAR DETEKSI KERUSAKAN C CRANE PADA PT. SWADAYA GRAHA MENGGUNAKAN METODE CERTAINTY FACTOR
RANCANG BANGUN SISTEM PAKAR DETEKSI KERUSAKAN C CRANE PADA PT. SWADAYA GRAHA MENGGUNAKAN METODE CERTAINTY FACTOR
Banyak Pada perusahaan kontraktor besar, Crane merupakan alat berat yang akan selalu di butuhkan dan memiliki ketersediaan dalam jumlah banyak. Crane tersebut berper...
Dynamic Simulation Analysis of Truck Crane Based on ADAMS
Dynamic Simulation Analysis of Truck Crane Based on ADAMS
Background:
With a reduction in the weight of telescopic boom crane and an increase in its
lifting capacity, the contradiction between its speed, stability and safety becomes more ...
Motion Characteristics of Crane Vessels in Lifting Operation
Motion Characteristics of Crane Vessels in Lifting Operation
ABSTRACT
This paper deals with motion characteristics of crane vessels in lifting operation. Emphasis is laid here especially on the effect of coupled motion betw...